Hubbry Logo
search
logo
1929725

GER Class S69

logo
Community Hub0 Subscribers
Write something...
Be the first to start a discussion here.
Be the first to start a discussion here.
See all
GER Class S69

The Great Eastern Railway (GER) Class S69, also known as 1500 Class, and later classified B12 by the London and North Eastern Railway (LNER) is a class of 4-6-0 steam locomotive designed to haul express passenger trains from London Liverpool Street station along the Great Eastern Main Line. Originally they were designed by S. D. Holden, but were much rebuilt, resulting in several subclasses.

Seventy-one S69 locomotives were built between 1911 and 1921 and numbered 1500–1570. Fifty-one of these were built at the GER's Stratford Works and the remaining 20 by William Beardmore and Company. A further 10 locomotives were built by Beyer, Peacock and Company for the LNER in 1928 and numbered 8571–8580. From 1948 the British Railways numbers were 61500–61580 (with gaps).

At the time of their introduction, the "Claud Hamilton" 4-4-0s were becoming outclassed on the GER's heaviest express trains. Although an enlarged 4-4-0 design was mooted, it was realised that any such design would have too high an axle load for the tracks of the Great Eastern Railway, which had a relatively low restriction. Another design constraint was the short turntables used at the time. This meant that a 4-6-0 design was decided upon, although the design was relatively short compared to similar designs introduced at the same time.

The first locomotive, numbered 1500, was delivered to Ipswich shed in November 1911, and construction continued at Stratford Works up to number 1538 which was delivered, again to Ipswich shed, in June 1915. There was then a brief pause due to wartime restrictions and the next two locomotives, 1539 and 1540, were not delivered until June 1917. A further batch of 20, numbers 1541 to 1560, were constructed by Beardsmore's having works numbers 135 to 154 although running numbers were not in the same order as the works numbers. These were delivered from June 1920 to April 1921 during which time construction continued at Stratford Works with numbers 1561 to 1570 also being delivered in 1920.

After the grouping the LNER ordered a further batch of 10 locomotives from Beyer Peacock of Manchester, and these were delivered with running numbers 8571 to 8580 to Gorton shed. This final batch brought the number of locomotives constructed to 81.

Seventy were still in service at the 1923 grouping, the LNER adding 7000 to the numbers of nearly all the ex-Great Eastern locomotives, including the Class S69 locomotives. A further ten were ordered in 1928 to ease a power shortage caused by the stalled development on a new class of 4-6-0 locomotives, and the cancellation of the planned suburban 2-6-4T tank locomotive due to the adverse press publicity caused by the Sevenoaks derailment of 1927.

All the B12 locomotives were fitted with vacuum ejectors between 1924 and 1929 (the 1928 batch had them from new). Fifty-five locomotives were fitted with ACFI feedwater heaters between 1927 and 1934, but these were removed between 1934 and 1942. The first substantive change was the fitting of Lenz poppet valves to the 1928 batch (from new), and six of the ex-GE locomotives (8516/19/25/32/33/40). These locomotives were then classified as class B12/2. The poppet valves were not a great success and they all reverted to or were converted to piston valve engines between 1931 and 1934.

As newer power became available, the locomotives’ low axleload made them ideal candidates for transfers elsewhere. Consequently, between 1931 and 1942, twenty-five locomotives were transferred to Scotland for use on the former Great North of Scotland Railway lines.

See all
User Avatar
No comments yet.