GPS satellite blocks
GPS satellite blocks are the various production generations of the Global Positioning System (GPS) used for satellite navigation. The first satellite in the system, Navstar 1, was launched by the United States Air Force on 22 February 1978. The GPS satellite constellation is now operated by the 2nd Navigation Warfare Squadron (2 NWS) of Mission Delta 31, United States Space Force.
The GPS satellites circle the Earth at an altitude of about 20,000 km (12,427 miles) and complete two full orbits every day.
Rockwell International was awarded a contract in 1974 to build the first eight Block I satellites. In 1978, the contract was extended to build an additional three Block I satellites. Beginning with Navstar 1 in 1978, ten "Block I" GPS satellites were successfully launched. One satellite, "Navstar 7", was lost due to an unsuccessful launch on 18 December 1981.
The Block I satellites were launched from Vandenberg Air Force Base using Atlas rockets that were converted intercontinental ballistic missiles. The satellites were built by Rockwell International at the same plant in Seal Beach, California where the S-II second stages of the Saturn V rockets were built.
The Block I series consisted of the concept validation satellites and reflected various stages of system development. Lessons learned from the 10 satellites in the series were incorporated into the fully operational Block II series.
Dual solar arrays supplied over 400 watts of power, charging nickel–cadmium batteries for operations in Earth's shadow. S-band communications were used for control and telemetry, while an UHF channel provided cross-links between spacecraft. A hydrazine propulsion system was used for orbital correction. The payload included two L-band navigation signals at 1575.42 MHz (L1) and 1227.60 MHz (L2).
The final Block I launch was conducted on 9 October 1985, but the last Block I satellite was not taken out of service until 18 November 1995, well past its 5-year design life.
The Block II satellites were the first full scale operational GPS satellites, designed to provide 14 days of operation without any contact from the control segment. The prime contractor was Rockwell International, which built a SVN 12 qualification vehicle after an amendment to the Block I contract. In 1983, the company was awarded an additional contract to build 28 Block II/IIA satellites.
GPS satellite blocks
GPS satellite blocks are the various production generations of the Global Positioning System (GPS) used for satellite navigation. The first satellite in the system, Navstar 1, was launched by the United States Air Force on 22 February 1978. The GPS satellite constellation is now operated by the 2nd Navigation Warfare Squadron (2 NWS) of Mission Delta 31, United States Space Force.
The GPS satellites circle the Earth at an altitude of about 20,000 km (12,427 miles) and complete two full orbits every day.
Rockwell International was awarded a contract in 1974 to build the first eight Block I satellites. In 1978, the contract was extended to build an additional three Block I satellites. Beginning with Navstar 1 in 1978, ten "Block I" GPS satellites were successfully launched. One satellite, "Navstar 7", was lost due to an unsuccessful launch on 18 December 1981.
The Block I satellites were launched from Vandenberg Air Force Base using Atlas rockets that were converted intercontinental ballistic missiles. The satellites were built by Rockwell International at the same plant in Seal Beach, California where the S-II second stages of the Saturn V rockets were built.
The Block I series consisted of the concept validation satellites and reflected various stages of system development. Lessons learned from the 10 satellites in the series were incorporated into the fully operational Block II series.
Dual solar arrays supplied over 400 watts of power, charging nickel–cadmium batteries for operations in Earth's shadow. S-band communications were used for control and telemetry, while an UHF channel provided cross-links between spacecraft. A hydrazine propulsion system was used for orbital correction. The payload included two L-band navigation signals at 1575.42 MHz (L1) and 1227.60 MHz (L2).
The final Block I launch was conducted on 9 October 1985, but the last Block I satellite was not taken out of service until 18 November 1995, well past its 5-year design life.
The Block II satellites were the first full scale operational GPS satellites, designed to provide 14 days of operation without any contact from the control segment. The prime contractor was Rockwell International, which built a SVN 12 qualification vehicle after an amendment to the Block I contract. In 1983, the company was awarded an additional contract to build 28 Block II/IIA satellites.