The Glasgow South Western Line is a mainline railway almost entirely in Scotland (the only exception being the final section into Carlisle in North West England) that runs from Glasgow to Kilmarnock, and then either Carlisle via Dumfries, or Stranraer via Ayr, with a branch to East Kilbride.
The line was built by several railway companies during the 19th century.[page needed]
The Glasgow, Dumfries and Carlisle Railway and the Glasgow, Paisley, Kilmarnock and Ayr Railway amalgamated to form the Glasgow and South Western Railway in 1850.
The Glasgow, Barrhead and Neilston Direct Railway and Glasgow and Kilmarnock Joint Railway were amalgamated to form the Glasgow, Barrhead and Kilmarnock Joint Railway jointly operated by the Glasgow and South Western Railway and Caledonian Railway.
The lines forming the East Kilbride branch were operated by the Caledonian Railway.
Until 1923 the line via Dumfries was in competition with the North British Railway and Caledonian Railway as one of the mainlines into Scotland. With the passing of the Railways Act 1921 (Grouping Act) the line became part of the London, Midland and Scottish Railway (LMS).
In 1948, with nationalisation the line became part of the Scottish Region of British Railways. During the Beeching Axe in the 1960s many of the railway's branch lines were closed, including the direct route between Dumfries and Stranraer, via Galloway on the Portpatrick and Wigtownshire Joint Railway and Castle Douglas and Dumfries Railway, leaving the present Y-shaped railway. The former G&SWR terminus at Glasgow St Enoch was also closed in this period (in 1966), with all services rerouted into Glasgow Central.
During the electrification of the West Coast Main Line in the early 1970s by British Rail, the line was used as a major diversionary route whilst the Caledonian Railway's Annandale/Clydesdale route was closed, particularly during the weekends. Following completion of this project, the sections of line between Barrhead and Kilmarnock (with a crossing loop at Lugton) and Annan and Gretna (controlled from Carlisle) were singled. Re-doubling of the Annan to Gretna section was completed in August 2008, controlled from Dumfries Station signal box.
Hub AI
Glasgow South Western Line AI simulator
(@Glasgow South Western Line_simulator)
Glasgow South Western Line
The Glasgow South Western Line is a mainline railway almost entirely in Scotland (the only exception being the final section into Carlisle in North West England) that runs from Glasgow to Kilmarnock, and then either Carlisle via Dumfries, or Stranraer via Ayr, with a branch to East Kilbride.
The line was built by several railway companies during the 19th century.[page needed]
The Glasgow, Dumfries and Carlisle Railway and the Glasgow, Paisley, Kilmarnock and Ayr Railway amalgamated to form the Glasgow and South Western Railway in 1850.
The Glasgow, Barrhead and Neilston Direct Railway and Glasgow and Kilmarnock Joint Railway were amalgamated to form the Glasgow, Barrhead and Kilmarnock Joint Railway jointly operated by the Glasgow and South Western Railway and Caledonian Railway.
The lines forming the East Kilbride branch were operated by the Caledonian Railway.
Until 1923 the line via Dumfries was in competition with the North British Railway and Caledonian Railway as one of the mainlines into Scotland. With the passing of the Railways Act 1921 (Grouping Act) the line became part of the London, Midland and Scottish Railway (LMS).
In 1948, with nationalisation the line became part of the Scottish Region of British Railways. During the Beeching Axe in the 1960s many of the railway's branch lines were closed, including the direct route between Dumfries and Stranraer, via Galloway on the Portpatrick and Wigtownshire Joint Railway and Castle Douglas and Dumfries Railway, leaving the present Y-shaped railway. The former G&SWR terminus at Glasgow St Enoch was also closed in this period (in 1966), with all services rerouted into Glasgow Central.
During the electrification of the West Coast Main Line in the early 1970s by British Rail, the line was used as a major diversionary route whilst the Caledonian Railway's Annandale/Clydesdale route was closed, particularly during the weekends. Following completion of this project, the sections of line between Barrhead and Kilmarnock (with a crossing loop at Lugton) and Annan and Gretna (controlled from Carlisle) were singled. Re-doubling of the Annan to Gretna section was completed in August 2008, controlled from Dumfries Station signal box.