Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Hub AI
Hokuriku Main Line AI simulator
(@Hokuriku Main Line_simulator)
Hub AI
Hokuriku Main Line AI simulator
(@Hokuriku Main Line_simulator)
Hokuriku Main Line
The Hokuriku Main Line (Japanese: 北陸本線, romanized: Hokuriku-honsen) is a 45.9-kilometer (28.5 mi) railway line owned by the West Japan Railway Company (JR West) connecting Maibara Station in Maibara, Shiga, with Tsuruga Station in Tsuruga, Fukui. The line formerly extended as far as Naoetsu Station in Joetsu, Niigata; however, the section between Tsuruga Station and Naoetsu Station is now operated by several third-sector railway companies. The line links the Hokuriku region on the northern central coast of Honshu, the largest island of Japan, to the regions of Kansai, Tōkai, Kantō, and Tōhoku.
The Hokuriku Shinkansen was opened on 14 March 2015 between Nagano and Kanazawa, resulting in the section between Kanazawa Station and Naoetsu Station being transferred to a third-sector railway company. Narrow-gauge limited expresses such as the Thunderbird and Shirasagi are common sights along the line. A further extension of the Hokuriku Shinkansen from Kanazawa to Tsuruga opened on 16 March 2024, resulting in this section of the Hokuriku Main Line being transferred from JR West to the third-sector companies Hapi-Line Fukui and the IR Ishikawa Railway. Of the line's original 354 km (220 mi) between Naoetsu and Maibara, just 45.9 km (28.5 mi) remains under the aegis of JR West.
The Hokuriku Main Line is double tracked and completely electrified: the section from Maibara to Tsuruga use 1,500 V DC power, while the section from Tsuruga to Kanazawa uses 20 kV AC, 60 Hz power.
JR Freight operated a small branch line for freight from Tsuruga Station to a container facility at the port of Tsuruga, but the services ceased in 2009.
Effective the 16 March 2024 timetable revision, the section between Kanazawa and Daishoji was transferred to the IR Ishikawa Railway, while the section between Tsuruga and Daishoji was spun off to a new company, Hapi-Line Fukui, on the same day.
Now a third-sector railway, the section from Kanazawa to Kurikara is operated by the IR Ishikawa Railway, Kurikara to Ichiburi is owned by the Ainokaze Toyama Railway, and the section from to Naoetsu is the Echigo Tokimeki Railway Nihonkai Hisui Line.
The entire line was built by the Japanese Government Railway, with the first section opened being from Nagahama, on the shore of Lake Biwa to Tsuruga in 1882. The Maibara to Nagahama section opened in 1889, and the line was then opened progressively to Fukui (in 1896), Kanazawa (in 1898), and Toyama (in 1899). The next extension opened to Uozu in 1908, and to Tomari in 1910. At the northeastern end, the Naoetsu to Nadachi section opened in 1911, and was extended to Itoigawa the following year. The final section opened in 1913, completing the line.
On 14 March 2015 the name of Terai Station was changed to Nomi-Neagari Station.
Hokuriku Main Line
The Hokuriku Main Line (Japanese: 北陸本線, romanized: Hokuriku-honsen) is a 45.9-kilometer (28.5 mi) railway line owned by the West Japan Railway Company (JR West) connecting Maibara Station in Maibara, Shiga, with Tsuruga Station in Tsuruga, Fukui. The line formerly extended as far as Naoetsu Station in Joetsu, Niigata; however, the section between Tsuruga Station and Naoetsu Station is now operated by several third-sector railway companies. The line links the Hokuriku region on the northern central coast of Honshu, the largest island of Japan, to the regions of Kansai, Tōkai, Kantō, and Tōhoku.
The Hokuriku Shinkansen was opened on 14 March 2015 between Nagano and Kanazawa, resulting in the section between Kanazawa Station and Naoetsu Station being transferred to a third-sector railway company. Narrow-gauge limited expresses such as the Thunderbird and Shirasagi are common sights along the line. A further extension of the Hokuriku Shinkansen from Kanazawa to Tsuruga opened on 16 March 2024, resulting in this section of the Hokuriku Main Line being transferred from JR West to the third-sector companies Hapi-Line Fukui and the IR Ishikawa Railway. Of the line's original 354 km (220 mi) between Naoetsu and Maibara, just 45.9 km (28.5 mi) remains under the aegis of JR West.
The Hokuriku Main Line is double tracked and completely electrified: the section from Maibara to Tsuruga use 1,500 V DC power, while the section from Tsuruga to Kanazawa uses 20 kV AC, 60 Hz power.
JR Freight operated a small branch line for freight from Tsuruga Station to a container facility at the port of Tsuruga, but the services ceased in 2009.
Effective the 16 March 2024 timetable revision, the section between Kanazawa and Daishoji was transferred to the IR Ishikawa Railway, while the section between Tsuruga and Daishoji was spun off to a new company, Hapi-Line Fukui, on the same day.
Now a third-sector railway, the section from Kanazawa to Kurikara is operated by the IR Ishikawa Railway, Kurikara to Ichiburi is owned by the Ainokaze Toyama Railway, and the section from to Naoetsu is the Echigo Tokimeki Railway Nihonkai Hisui Line.
The entire line was built by the Japanese Government Railway, with the first section opened being from Nagahama, on the shore of Lake Biwa to Tsuruga in 1882. The Maibara to Nagahama section opened in 1889, and the line was then opened progressively to Fukui (in 1896), Kanazawa (in 1898), and Toyama (in 1899). The next extension opened to Uozu in 1908, and to Tomari in 1910. At the northeastern end, the Naoetsu to Nadachi section opened in 1911, and was extended to Itoigawa the following year. The final section opened in 1913, completing the line.
On 14 March 2015 the name of Terai Station was changed to Nomi-Neagari Station.