The Katse Dam, a concrete arch dam on the Malibamatšo River in Lesotho, is Africa's second largest double-curvature arch dam after the Tekezé Dam in Ethiopia. Located just below the confluence of the Bokong River, which forms the western arm of the Katse reservoir, the dam is part of a larger project which will eventually include five large dams in remote rural areas.
The potential of the project was identified by the South African civil engineer Ninham Shand in 1953 as a possible means to supplement the water supply of South Africa's industrial heartland in the Witwatersrand. The World Bank arranged a treaty between the governments of South Africa and Lesotho, allowing the project to proceed.
The dam was built by a consortium of Bouygues, Concor, Group 5, Hochtief, Impregilo, Kier Group and Sterling International. The dam was completed in 1996 and the reservoir filled with water by 1997. The total cost of the project was US$8 billion. Katse Airport was constructed 3 kilometres (2 mi) southeast of the dam to facilitate access to the project.
The mass of water gave rise to induced seismicity. Farmers who lost land to the project have had trouble re-establishing new livelihoods. There is little arable land in the mountains to replace all that was lost, and efforts to help them with new livelihoods have by no means been as successful as the engineering works. A local group has documented the project's human legacy in the rural communities directly affected by the project, and the environmental and human-rights NPO, International Rivers, produced a detailed account of the effects.
As mitigation of the loss of habitat, plant rescue missions were conducted in the area to be flooded, and Katse Botanical Gardens was established to house and propagate the plants rescued.
Water from the dam first travels through a 45 kilometres (28 mi), 4 metres (13 ft) diameter tunnel, exiting at a hydroelectric station near Muela. The dam's high elevation allows a gravity flow water delivery system to South Africa, in addition to hydroelectric power for Lesotho, and was a prime reason behind the choice of site.
Water delivery officially began on 22 January 1998. The dam currently supplies about 30 cubic metres per second (1,100 cu ft/s) of water to South Africa, which pays Lesotho $35 million per year, plus a variable royalty based on calculated water usage benefits.
In recent years, water from the scheme has also been discharged into the Mohokare (Caledon) River to provide water to Lesotho's capital Maseru in times of shortages. The new dams have filled as anticipated and discharge of water from the dams into the downstream rivers continues in a scheme devised to preserve ecological balances. This discharged water flows to the Senqu (Orange) River, and while preserving the ecological status quo, it benefits only those communities along the rivers. Schemes to provide water supplies to displaced Highlands farmers have not been very successful.
Hub AI
Katse Dam AI simulator
(@Katse Dam_simulator)
Katse Dam
The Katse Dam, a concrete arch dam on the Malibamatšo River in Lesotho, is Africa's second largest double-curvature arch dam after the Tekezé Dam in Ethiopia. Located just below the confluence of the Bokong River, which forms the western arm of the Katse reservoir, the dam is part of a larger project which will eventually include five large dams in remote rural areas.
The potential of the project was identified by the South African civil engineer Ninham Shand in 1953 as a possible means to supplement the water supply of South Africa's industrial heartland in the Witwatersrand. The World Bank arranged a treaty between the governments of South Africa and Lesotho, allowing the project to proceed.
The dam was built by a consortium of Bouygues, Concor, Group 5, Hochtief, Impregilo, Kier Group and Sterling International. The dam was completed in 1996 and the reservoir filled with water by 1997. The total cost of the project was US$8 billion. Katse Airport was constructed 3 kilometres (2 mi) southeast of the dam to facilitate access to the project.
The mass of water gave rise to induced seismicity. Farmers who lost land to the project have had trouble re-establishing new livelihoods. There is little arable land in the mountains to replace all that was lost, and efforts to help them with new livelihoods have by no means been as successful as the engineering works. A local group has documented the project's human legacy in the rural communities directly affected by the project, and the environmental and human-rights NPO, International Rivers, produced a detailed account of the effects.
As mitigation of the loss of habitat, plant rescue missions were conducted in the area to be flooded, and Katse Botanical Gardens was established to house and propagate the plants rescued.
Water from the dam first travels through a 45 kilometres (28 mi), 4 metres (13 ft) diameter tunnel, exiting at a hydroelectric station near Muela. The dam's high elevation allows a gravity flow water delivery system to South Africa, in addition to hydroelectric power for Lesotho, and was a prime reason behind the choice of site.
Water delivery officially began on 22 January 1998. The dam currently supplies about 30 cubic metres per second (1,100 cu ft/s) of water to South Africa, which pays Lesotho $35 million per year, plus a variable royalty based on calculated water usage benefits.
In recent years, water from the scheme has also been discharged into the Mohokare (Caledon) River to provide water to Lesotho's capital Maseru in times of shortages. The new dams have filled as anticipated and discharge of water from the dams into the downstream rivers continues in a scheme devised to preserve ecological balances. This discharged water flows to the Senqu (Orange) River, and while preserving the ecological status quo, it benefits only those communities along the rivers. Schemes to provide water supplies to displaced Highlands farmers have not been very successful.