Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
Mount Hood Freeway
The Mount Hood Freeway is a partially constructed but never to be completed freeway alignment of U.S. Route 26 and Interstate 80N (now Interstate 84), which would have run through southeast Portland, Oregon. Related projects would have continued the route through the neighboring suburb of Gresham, out to the city of Sandy.
The original plans for the freeway were presented by the Oregon State Highway Department as part of a 1955 report that proposed 14 new highways in the Portland metropolitan area. The freeway proposal was part of urban planner Robert Moses’s original postwar infrastructure plan for Portland.
The proposed route was to run parallel to the existing alignment of US 26 on Powell Boulevard, and would have required the destruction of 1,750 long-standing Portland homes and one percent of the Portland housing stock. Plans for the freeway triggered a revolt in Portland in the late 1960s and early 1970s, leading to its eventual cancellation. Plans for other proposed freeways in Portland were also scrapped, including Interstate 505. Funds for the project (and other canceled freeways) were spent on other transportation projects, including the first section of the MAX Light Rail system.
When the freeway was canceled, a segment was already completed southeastwards from East Burnside Road and Southeast Powell Blvd in Gresham, continuing to Sandy, which remains in use today.[citation needed]
The freeway would have run from the Willamette River (at the Marquam Bridge) to about SE 50th Avenue adjacent to the south side of Division St. It would then have shifted to Powell Blvd. (Route 26) near SE 54th Avenue. By the initial plan, the freeway would have ended at SE 122nd Avenue, though extensions were considered.
In 1962, this section was formally submitted for inclusion in the U.S. Interstate Highway System as part of Interstate 80N, today's I-84.[citation needed]
I-205 was in the planning stages at the time the Mount Hood Freeway was first proposed. The I-205 routing was originally envisioned for the 52nd Avenue corridor, but ended up being built farther east at about 93rd Avenue. All plans for the Mount Hood Freeway allowed for a future I-205 connection at various spots.[citation needed]
Another segment of the proposal was called the Mount Hood Expressway. It would have continued the Mount Hood Freeway alignment past a stack interchange at I-205, continuing to follow Powell Blvd. before skirting Gresham to the south and connecting to the existing route.[citation needed]
Hub AI
Mount Hood Freeway AI simulator
(@Mount Hood Freeway_simulator)
Mount Hood Freeway
The Mount Hood Freeway is a partially constructed but never to be completed freeway alignment of U.S. Route 26 and Interstate 80N (now Interstate 84), which would have run through southeast Portland, Oregon. Related projects would have continued the route through the neighboring suburb of Gresham, out to the city of Sandy.
The original plans for the freeway were presented by the Oregon State Highway Department as part of a 1955 report that proposed 14 new highways in the Portland metropolitan area. The freeway proposal was part of urban planner Robert Moses’s original postwar infrastructure plan for Portland.
The proposed route was to run parallel to the existing alignment of US 26 on Powell Boulevard, and would have required the destruction of 1,750 long-standing Portland homes and one percent of the Portland housing stock. Plans for the freeway triggered a revolt in Portland in the late 1960s and early 1970s, leading to its eventual cancellation. Plans for other proposed freeways in Portland were also scrapped, including Interstate 505. Funds for the project (and other canceled freeways) were spent on other transportation projects, including the first section of the MAX Light Rail system.
When the freeway was canceled, a segment was already completed southeastwards from East Burnside Road and Southeast Powell Blvd in Gresham, continuing to Sandy, which remains in use today.[citation needed]
The freeway would have run from the Willamette River (at the Marquam Bridge) to about SE 50th Avenue adjacent to the south side of Division St. It would then have shifted to Powell Blvd. (Route 26) near SE 54th Avenue. By the initial plan, the freeway would have ended at SE 122nd Avenue, though extensions were considered.
In 1962, this section was formally submitted for inclusion in the U.S. Interstate Highway System as part of Interstate 80N, today's I-84.[citation needed]
I-205 was in the planning stages at the time the Mount Hood Freeway was first proposed. The I-205 routing was originally envisioned for the 52nd Avenue corridor, but ended up being built farther east at about 93rd Avenue. All plans for the Mount Hood Freeway allowed for a future I-205 connection at various spots.[citation needed]
Another segment of the proposal was called the Mount Hood Expressway. It would have continued the Mount Hood Freeway alignment past a stack interchange at I-205, continuing to follow Powell Blvd. before skirting Gresham to the south and connecting to the existing route.[citation needed]