Hubbry Logo
search
logo
1452474

Penly Nuclear Power Plant

logo
Community Hub0 Subscribers
Write something...
Be the first to start a discussion here.
Be the first to start a discussion here.
See all
Penly Nuclear Power Plant

The Penly Nuclear power station (French: Centrale nucléaire de Penly) is found some 6 miles (10 km) northeast of Dieppe. It lies on the border of two French municipalities: Penly and Saint-Martin-en-Campagne in the département of Seine-Maritime, Normandy, on the English Channel coast. It employs France's only working funicular railway in industrial use.

The plant employs about 670 people full-time and is owned and operated by the French company Électricité de France. Water from the English Channel is used for cooling.

The two PWR units are of the 1330 MWe class. The installed total output is 2764 MW, which means the plant is about average for French nuclear plants. It feeds on average about 18 billion kilowatt-hours per year into the public grid, corresponding to about 80% of the annual consumption of Normandy. It is about 10 kilometres (6.2 mi) from Dieppe.

In January 2009, the French government announced that a third reactor, the second French EPR reactor, would be built in Penly. Construction was announced for 2012 with connection to the grid following in 2017. GDF Suez was to own a part of the plant, with the majority taken by EDF. However, in 2010 GDF Suez withdrew from the project. In 2011, following the Fukushima Daiichi nuclear disaster, EDF postponed public consultations putting in doubt the 2012 construction start date. In February 2013, the Minister of Industrial Renewal Arnaud Montebourg stated that the plans for a new EPR reactor at Penly had been canceled, citing the capacity for electricity production and massive investments in renewable energy along with his confidence in the EPR as a competitive project in foreign countries.

In 2019, EDF is seeking a site for the construction of a pair of EPR reactors, and Penly is considered as one of the lead contenders.

In June 2023, EDF announced it was starting the authorisation process to build two EPR 2 reactors, anticipating that site preparatory work would begin in summer 2024 and construction would begin about 2027.

9 June 2004 - Weakly radioactive water was leaked into the sea from the reserve tank of a reactor's secondary circuit.

11 October 2011 - A subcontractor employee had localised contamination on his face.

See all
User Avatar
No comments yet.