Phipps Bend Nuclear Plant
Phipps Bend Nuclear Plant was a planned nuclear power generation facility that was to be constructed and operated by the Tennessee Valley Authority (TVA) in unincorporated Hawkins County, Tennessee. Proposed to house two reactor units, the power plant was estimated to cost $1.6 billion when it was first planned in late 1977, provide a generating capacity of 2,600 megawatts (MWe). Following negative public reactions towards nuclear energy following the Three Mile Island accident and a decreasing demand for power due to regional economic decline, the TVA's board of directors voted to defer further construction of the power plant. By 1981, the plant was 40% complete and an estimated $1.5 billion in planning, engineering, and construction costs had accumulated. Construction never resumed, and the project was canceled overall in 1982 due to lower load growth than forecast. By the project's cancellation, the TVA had amassed over $2.6 billion in spending for the incomplete nuclear facility. After being auctioned off by the TVA in 1987, the land acquired for the plant would be under the ownership of Hawkins County's industrial development board, who converted most of the site into an industrial park, originally named the Phipps Bend Industrial Park, and later the Phipps Bend Advanced Manufacturing & Technology Campus. A 1 MW solar farm was built at the site in 2017.
With the emergence of developing nuclear power technology by the 1950s and 1960s, the TVA initiated a nuclear development plan by the mid-1960s to build seven nuclear power generation stations across the Tennessee Valley: Browns Ferry, Sequoyah, Watts Bar, Bellefonte, Hartsville, Yellow Creek, and Phipps Bend. This was a result of new interest regarding the environmental efficiency of nuclear power while having a baseload as powerful as the fossil fuel facilities the TVA had constructed the decades prior. In 1974, the TVA's first nuclear reactor was placed into operation at the Browns Ferry facility near Huntsville, Alabama.
Interest for a nuclear power plant in Hawkins County was reported as early as 1972, when a community club expressed enthusiasm for a breeder reactor unit at the John Sevier Fossil Plant near the county seat of Rogersville. By 1974, the TVA announced plans for a two-unit nuclear power generation station in the Phipps Bend area of Hawkins County, citing the level acreage along the banks of the Holston River. The TVA acquired nearly 1,300 acres of farmland on the northern shore of the Holston River primarily through eminent domain. Infrastructure upgrades both on-site and off-site were underway to prepare for the power plant, including the widening of U.S. Route 11W into a four-lane limited-access highway from Kingsport to Rogersville, and over $2 million in the construction of water and sewage systems to access the plant site from the public works department of Rogersville. The TVA provided funding for industrial access roads to Phipps Bend from US 11W.
For the Phipps Bend reactor units, the TVA purchased two BWR-6 boiling water reactors supplied by General Electric. The Phipps Bend reactors had a net output of nearly 2600 MWe.
Construction on Phipps Bend began with the demolition of existing structures on the project site in April 1977 and drilling for core samples for geotechnical work. Value of the project increased an additional billion dollars following change orders and rising costs in construction materials. The project employed a peak construction workforce of over 2,500 workers.
By the cancellation of the Phipps Bend project, the most near-complete portion of the overall project was the structure of the Unit 1 reactor. The reactor shell for the unit was completed. The steel frame base for the cooling tower for Unit 1 was also complete by the cancellation. Overall, Phipps Bend Unit 1 was 29% complete by the project's cancellation.
Phipps Bend Unit 2 was 5% complete overall by the project's cancellation.
In 1981, the TVA board of directors voted unanimously to defer further construction of the Phipps Bend nuclear project in a conference at the TVA's twin tower complex in downtown Knoxville. More than 100 individuals attended the conference to protest the deferment, with over 40 Hawkins County residents wearing yellow armbands signifying that they were "hostages" to the TVA. In 1987, the TVA auctioned off the Phipps Bend site and the incomplete nuclear facility to Phipps Bend Joint Venture LLC, an industrial development group consisting of Hawkins County and Kingsport officials.
Hub AI
Phipps Bend Nuclear Plant AI simulator
(@Phipps Bend Nuclear Plant_simulator)
Phipps Bend Nuclear Plant
Phipps Bend Nuclear Plant was a planned nuclear power generation facility that was to be constructed and operated by the Tennessee Valley Authority (TVA) in unincorporated Hawkins County, Tennessee. Proposed to house two reactor units, the power plant was estimated to cost $1.6 billion when it was first planned in late 1977, provide a generating capacity of 2,600 megawatts (MWe). Following negative public reactions towards nuclear energy following the Three Mile Island accident and a decreasing demand for power due to regional economic decline, the TVA's board of directors voted to defer further construction of the power plant. By 1981, the plant was 40% complete and an estimated $1.5 billion in planning, engineering, and construction costs had accumulated. Construction never resumed, and the project was canceled overall in 1982 due to lower load growth than forecast. By the project's cancellation, the TVA had amassed over $2.6 billion in spending for the incomplete nuclear facility. After being auctioned off by the TVA in 1987, the land acquired for the plant would be under the ownership of Hawkins County's industrial development board, who converted most of the site into an industrial park, originally named the Phipps Bend Industrial Park, and later the Phipps Bend Advanced Manufacturing & Technology Campus. A 1 MW solar farm was built at the site in 2017.
With the emergence of developing nuclear power technology by the 1950s and 1960s, the TVA initiated a nuclear development plan by the mid-1960s to build seven nuclear power generation stations across the Tennessee Valley: Browns Ferry, Sequoyah, Watts Bar, Bellefonte, Hartsville, Yellow Creek, and Phipps Bend. This was a result of new interest regarding the environmental efficiency of nuclear power while having a baseload as powerful as the fossil fuel facilities the TVA had constructed the decades prior. In 1974, the TVA's first nuclear reactor was placed into operation at the Browns Ferry facility near Huntsville, Alabama.
Interest for a nuclear power plant in Hawkins County was reported as early as 1972, when a community club expressed enthusiasm for a breeder reactor unit at the John Sevier Fossil Plant near the county seat of Rogersville. By 1974, the TVA announced plans for a two-unit nuclear power generation station in the Phipps Bend area of Hawkins County, citing the level acreage along the banks of the Holston River. The TVA acquired nearly 1,300 acres of farmland on the northern shore of the Holston River primarily through eminent domain. Infrastructure upgrades both on-site and off-site were underway to prepare for the power plant, including the widening of U.S. Route 11W into a four-lane limited-access highway from Kingsport to Rogersville, and over $2 million in the construction of water and sewage systems to access the plant site from the public works department of Rogersville. The TVA provided funding for industrial access roads to Phipps Bend from US 11W.
For the Phipps Bend reactor units, the TVA purchased two BWR-6 boiling water reactors supplied by General Electric. The Phipps Bend reactors had a net output of nearly 2600 MWe.
Construction on Phipps Bend began with the demolition of existing structures on the project site in April 1977 and drilling for core samples for geotechnical work. Value of the project increased an additional billion dollars following change orders and rising costs in construction materials. The project employed a peak construction workforce of over 2,500 workers.
By the cancellation of the Phipps Bend project, the most near-complete portion of the overall project was the structure of the Unit 1 reactor. The reactor shell for the unit was completed. The steel frame base for the cooling tower for Unit 1 was also complete by the cancellation. Overall, Phipps Bend Unit 1 was 29% complete by the project's cancellation.
Phipps Bend Unit 2 was 5% complete overall by the project's cancellation.
In 1981, the TVA board of directors voted unanimously to defer further construction of the Phipps Bend nuclear project in a conference at the TVA's twin tower complex in downtown Knoxville. More than 100 individuals attended the conference to protest the deferment, with over 40 Hawkins County residents wearing yellow armbands signifying that they were "hostages" to the TVA. In 1987, the TVA auctioned off the Phipps Bend site and the incomplete nuclear facility to Phipps Bend Joint Venture LLC, an industrial development group consisting of Hawkins County and Kingsport officials.