Rail transport in Italy
The Italian railway system is one of the most important parts of the infrastructure of Italy, with a total length of 24,567 km (15,265 mi) of which active lines are 16,832 km (10,459 mi). The network has recently grown with the construction of the new high-speed rail network. Italy is a member of the International Union of Railways (UIC). The UIC Country Code for Italy is 83. In 2024, the Italian national rail service Trenitalia was recognized as the best rail passenger operator in Europe.
RFI (Rete Ferroviaria Italiana, Italian Rail Network), a state owned infrastructure manager which administers most of the Italian rail infrastructure. The Italian railway system has a length of 19,394 km (12,051 mi), of which 18,071 km (11,229 mi) standard gauge. The active lines are 16,723 km (10,391 mi), of which 7,505 km (4,663 mi) are double tracks. Italy has 2,507 people and 12.46 km2 per kilometre of rail track, giving Italy the world's 13th-largest rail network.
Lines are divided into 3 categories:
Most of the Italian network is electrified (11,921 km (7,407 mi)). The electric system is 3 kV DC on conventional lines and 25 kV AC on high-speed lines.
A major part of the Italian rail network is managed and operated by RFI (Rete Ferroviaria Italiana, Italian Rail Network). Other regional agencies, mostly owned by public entities such as regional governments, operate on the Italian network.
Travellers who often make use of the railway during their stay in Italy might use rail passes, such as the European Interrail / Eurail passes or Italy's national and regional passes. These rail passes allow travellers the freedom to use regional trains during the validity period, but all high-speed and intercity trains require up to a 15-euro reservation fee. Regional passes, such as "Io viaggio ovunque Lombardia", offer one-day, multiple-day and monthly periods of validity. There are also saver passes for adults, who travel as a group, with savings up to 20%. Foreign travellers should purchase these passes in advance so that the passes can be delivered by post prior to the trip. When using the rail passes, the date of travel needs to be filled in before boarding the trains.
Companies certified to run railways in Italy are:
The first line to be built on the peninsula was the Naples–Portici line, in the Kingdom of the Two Sicilies, which was 7.64 km (4.75 mi) long and was inaugurated on 3 October 1839, nine years after the world's first "modern" inter-city railway, the Liverpool and Manchester Railway. The following year the firm Holzhammer of Bolzano was granted the "Imperial-Royal privilege" to build the Milano–Monza line (12 km (7.5 mi)), the second railway built in Italy, in the then Kingdom of Lombardy–Venetia, a part of the Austrian Empire.
Hub AI
Rail transport in Italy AI simulator
(@Rail transport in Italy_simulator)
Rail transport in Italy
The Italian railway system is one of the most important parts of the infrastructure of Italy, with a total length of 24,567 km (15,265 mi) of which active lines are 16,832 km (10,459 mi). The network has recently grown with the construction of the new high-speed rail network. Italy is a member of the International Union of Railways (UIC). The UIC Country Code for Italy is 83. In 2024, the Italian national rail service Trenitalia was recognized as the best rail passenger operator in Europe.
RFI (Rete Ferroviaria Italiana, Italian Rail Network), a state owned infrastructure manager which administers most of the Italian rail infrastructure. The Italian railway system has a length of 19,394 km (12,051 mi), of which 18,071 km (11,229 mi) standard gauge. The active lines are 16,723 km (10,391 mi), of which 7,505 km (4,663 mi) are double tracks. Italy has 2,507 people and 12.46 km2 per kilometre of rail track, giving Italy the world's 13th-largest rail network.
Lines are divided into 3 categories:
Most of the Italian network is electrified (11,921 km (7,407 mi)). The electric system is 3 kV DC on conventional lines and 25 kV AC on high-speed lines.
A major part of the Italian rail network is managed and operated by RFI (Rete Ferroviaria Italiana, Italian Rail Network). Other regional agencies, mostly owned by public entities such as regional governments, operate on the Italian network.
Travellers who often make use of the railway during their stay in Italy might use rail passes, such as the European Interrail / Eurail passes or Italy's national and regional passes. These rail passes allow travellers the freedom to use regional trains during the validity period, but all high-speed and intercity trains require up to a 15-euro reservation fee. Regional passes, such as "Io viaggio ovunque Lombardia", offer one-day, multiple-day and monthly periods of validity. There are also saver passes for adults, who travel as a group, with savings up to 20%. Foreign travellers should purchase these passes in advance so that the passes can be delivered by post prior to the trip. When using the rail passes, the date of travel needs to be filled in before boarding the trains.
Companies certified to run railways in Italy are:
The first line to be built on the peninsula was the Naples–Portici line, in the Kingdom of the Two Sicilies, which was 7.64 km (4.75 mi) long and was inaugurated on 3 October 1839, nine years after the world's first "modern" inter-city railway, the Liverpool and Manchester Railway. The following year the firm Holzhammer of Bolzano was granted the "Imperial-Royal privilege" to build the Milano–Monza line (12 km (7.5 mi)), the second railway built in Italy, in the then Kingdom of Lombardy–Venetia, a part of the Austrian Empire.