SES-8
SES-8
Main page
1447112

SES-8

logo
Community Hub0 subscribers
What are your thoughts?
Be the first to start a discussion here.
Be the first to start a discussion here.
SES-8

SES-8 is a geostationary Communications satellite operated by SES SES-8 was successfully launched on SpaceX Falcon 9 v1.1 on 3 December 2013, 22:41:00 UTC.

It was the first flight of any SpaceX launch vehicle to a supersynchronous transfer orbit, an orbit with a somewhat larger apogee than the more usual geostationary transfer orbit (GTO) typically utilised for communication satellites.

The SES-8 satellite is built on the STAR-2.4 satellite bus by Orbital Sciences Corporation (OSC). It is the sixth satellite of that model to be built for SES.

The communications satellite is initially co-located at 95° East with NSS-6 in order to provide communications bandwidth growth capacity in the Asia-Pacific region, specifically aimed at high-growth markets in South Asia and Indo-China, "as well as provide expansion capacity for satellite television (direct-to-home - DTH), Very-small-aperture terminal (VSAT) and government applications".

The launch of SES-8 was the seventh launch of the Falcon 9 launch vehicle, and the second launch of the Falcon 9 v1.1. SES paid a discounted price — "well under US$60 million" — for the launch since it was the inaugural geostationary launch on the Falcon 9. When originally contracted, in 2011 the putative launch date was early 2013.

The launch was the second launch of the Falcon 9 v1.1 version of the rocket, a longer rocket with 60% more thrust than the Falcon 9 v1.0 vehicle, and the first launch of the larger v1.1 rocket using the rebuilt erector structure at SpaceX' Cape Canaveral SLC-40. As a result, a number of systems on the launch vehicle was flown for only the second time, while several parts of the ground infrastructure at Cape Canaveral were used in a launch for the first time. These include:

In order to maximize the propellant available for the launch of SES-8 into geostationary transfer orbit (GTO), SpaceX did not attempt a controlled descent test of the first-stage booster as they did on the previous Falcon 9 v1.1 flight in September 2013.

In the previous launch of the Falcon 9 v1.1 — the first launch of the much larger version of the rocket with new Merlin 1D engines — on 29 September 2013, SpaceX was unsuccessful in reigniting the second stage Merlin 1D vacuum engine once the rocket had deployed its primary payload (CASSIOPE) and all of its nanosat secondary payloads. The restart failure was determined to be frozen igniter fluid lines in the second-stage Merlin 1D engine. A minor redesign was done to address the problem by adding additional insulation to the lines.

See all
User Avatar
No comments yet.