Staten Island Tunnel
The Staten Island Tunnel is an abandoned, incomplete railway and subway tunnel in Staten Island, New York City. It was intended to connect railways on Staten Island (precursors to the modern-day Staten Island Railway) to the BMT Fourth Avenue Line of the New York City Subway, in Brooklyn, via a new crossing under the Narrows. Planned to extend 10,400 feet (3,200 m), the tunnel would have been among the world's longest at the time of its planning, in the late 19th and early 20th centuries.
Construction began in 1923, and the tunnel was excavated 150 feet (46 m) into the Narrows before New York City Mayor John Hylan, a former Brooklyn–Manhattan Transit Corporation (BMT) employee and initial proponent of the tunnel, canceled the project in 1925. The tunnel lies dormant under Owl's Head Park in Bay Ridge, Brooklyn. Later proposals to complete the tunnel, including the 1939 plans for the Independent Subway System's ambitious Second System, were never funded.
Modern proposals for completion of the tunnel have come from New York City Councilman Lewis Fidler, who in 2007 proposed a 0.33% tax for the tri-state region to pay for the construction. The tunnel was listed as one of many projects that could receive federal funds that were to have been allocated to the Access to the Region's Core tunnel, which was canceled in October 2010. State Senator Diane Savino was among the supporters of the tunnel; Savino stated that if built, the tunnel would cost $3 billion and would improve quality of life for Staten Islanders, reduce traffic, and increase the attractiveness of the borough for investment.
Officially called the Brooklyn-Richmond Freight and Passenger Tunnel, the Staten Island Tunnel was also to be referred to by four other names:
In 1888, subsequent to building the Arthur Kill swing bridge between New Jersey and northwestern Staten Island, the Baltimore & Ohio Railroad (the owners of the Staten Island Railway until 1971) proposed a tunnel between Staten Island and Brooklyn. In 1890, Staten Island developer Erastus Wiman, who controlled the railway, sponsored a plan by the Baltimore and Ohio Railroad to construct a tunnel under the Narrows to connect Staten Island with Brooklyn for both passenger and freight service. The proposal never made it through the approval process when financial challenges stopped the plan at the drawing board. The tunnel would have gone near the foot of Vanderbilt Avenue on Staten Island to Bay Ridge in Brooklyn, traveling 1+1⁄4 miles (2.0 km) at a depth of 35 feet (11 m) below the narrows. There would have been two lines of tunneling, parallel and close together. Wiman believed that the tunneling would cost $5 million and that with the connecting road, the total cost was estimated at $6 million.
A rapid transit route to connect Staten Island to the remainder of New York City was proposed in 1912, in conjunction with the Dual Contracts of the New York City Subway. At the time, there were no vehicular or rail connections between Staten Island and the other four boroughs; the only connection was by ferry. Although not funded by the city, the tunnel was expected to help expand the then-sparsely populated borough in a similar manner to the population and development explosions seen in Brooklyn and the Bronx.
Under the Dual Contracts, three routes were proposed—two to Brooklyn and one to Manhattan—which would connect the Staten Island Railway's rapid transit service (SIRT) to existing subway lines.
The Manhattan proposal, often called the "direct route," would have connected with the Interborough Rapid Transit Company (IRT)'s lines under Battery Park, near the current Brooklyn–Battery Tunnel. "Direct Route A" would have utilized a five-section tunnel under the New York Harbor, while "Direct Route B" would have used a partially-elevated route running along the eastern coastline of New Jersey (near Greenville and Bayonne). Both Manhattan plans would have required connections to various points, including Ellis Island or Governors Island, and would have traveled around 5 miles (8.0 km) without any stops. Because of this, the high costs of the potential tunnel, and the relatively small population of Staten Island, the Manhattan route was considered impractical. Another 5-mile tunnel to Battery Park was proposed by the city in the 1950s, but the plan was scrapped due to a lack of funding.
Hub AI
Staten Island Tunnel AI simulator
(@Staten Island Tunnel_simulator)
Staten Island Tunnel
The Staten Island Tunnel is an abandoned, incomplete railway and subway tunnel in Staten Island, New York City. It was intended to connect railways on Staten Island (precursors to the modern-day Staten Island Railway) to the BMT Fourth Avenue Line of the New York City Subway, in Brooklyn, via a new crossing under the Narrows. Planned to extend 10,400 feet (3,200 m), the tunnel would have been among the world's longest at the time of its planning, in the late 19th and early 20th centuries.
Construction began in 1923, and the tunnel was excavated 150 feet (46 m) into the Narrows before New York City Mayor John Hylan, a former Brooklyn–Manhattan Transit Corporation (BMT) employee and initial proponent of the tunnel, canceled the project in 1925. The tunnel lies dormant under Owl's Head Park in Bay Ridge, Brooklyn. Later proposals to complete the tunnel, including the 1939 plans for the Independent Subway System's ambitious Second System, were never funded.
Modern proposals for completion of the tunnel have come from New York City Councilman Lewis Fidler, who in 2007 proposed a 0.33% tax for the tri-state region to pay for the construction. The tunnel was listed as one of many projects that could receive federal funds that were to have been allocated to the Access to the Region's Core tunnel, which was canceled in October 2010. State Senator Diane Savino was among the supporters of the tunnel; Savino stated that if built, the tunnel would cost $3 billion and would improve quality of life for Staten Islanders, reduce traffic, and increase the attractiveness of the borough for investment.
Officially called the Brooklyn-Richmond Freight and Passenger Tunnel, the Staten Island Tunnel was also to be referred to by four other names:
In 1888, subsequent to building the Arthur Kill swing bridge between New Jersey and northwestern Staten Island, the Baltimore & Ohio Railroad (the owners of the Staten Island Railway until 1971) proposed a tunnel between Staten Island and Brooklyn. In 1890, Staten Island developer Erastus Wiman, who controlled the railway, sponsored a plan by the Baltimore and Ohio Railroad to construct a tunnel under the Narrows to connect Staten Island with Brooklyn for both passenger and freight service. The proposal never made it through the approval process when financial challenges stopped the plan at the drawing board. The tunnel would have gone near the foot of Vanderbilt Avenue on Staten Island to Bay Ridge in Brooklyn, traveling 1+1⁄4 miles (2.0 km) at a depth of 35 feet (11 m) below the narrows. There would have been two lines of tunneling, parallel and close together. Wiman believed that the tunneling would cost $5 million and that with the connecting road, the total cost was estimated at $6 million.
A rapid transit route to connect Staten Island to the remainder of New York City was proposed in 1912, in conjunction with the Dual Contracts of the New York City Subway. At the time, there were no vehicular or rail connections between Staten Island and the other four boroughs; the only connection was by ferry. Although not funded by the city, the tunnel was expected to help expand the then-sparsely populated borough in a similar manner to the population and development explosions seen in Brooklyn and the Bronx.
Under the Dual Contracts, three routes were proposed—two to Brooklyn and one to Manhattan—which would connect the Staten Island Railway's rapid transit service (SIRT) to existing subway lines.
The Manhattan proposal, often called the "direct route," would have connected with the Interborough Rapid Transit Company (IRT)'s lines under Battery Park, near the current Brooklyn–Battery Tunnel. "Direct Route A" would have utilized a five-section tunnel under the New York Harbor, while "Direct Route B" would have used a partially-elevated route running along the eastern coastline of New Jersey (near Greenville and Bayonne). Both Manhattan plans would have required connections to various points, including Ellis Island or Governors Island, and would have traveled around 5 miles (8.0 km) without any stops. Because of this, the high costs of the potential tunnel, and the relatively small population of Staten Island, the Manhattan route was considered impractical. Another 5-mile tunnel to Battery Park was proposed by the city in the 1950s, but the plan was scrapped due to a lack of funding.