The Taitung Line (Chinese: 臺東線; pinyin: Táidōng Xiàn; Pe̍h-ōe-jī: Tâi-tang Soàⁿ), also known as the Hua-Tung line (Chinese: 花東線; pinyin: Huādōng Xiàn; Pe̍h-ōe-jī: Hoa-tang Soàⁿ), is the southern section of the Eastern Line of Taiwan Railway. The line starts at the Hualien station and ends at the Taitung station. It is 161.5 km long, including the main segment of 155.7 km between Hualien and Taitung.
The coastal branch lines of Hualien and Taitung were discarded after the broadening plan in 1982. The broadcasts of the station names on Taitung line are made in five languages: Mandarin, Taiwanese Hokkien, Hakka, English, and Amis. The Taitung Line is the only line in Taiwan where broadcasts are made in the Amis language.
The north segment from Karenkō (花蓮港, now Hualien City) to Poshiko (璞石閣 ポシコ, then Tamazato, now Yuli) was built in 1909 and completed in 1917. The south segment from Hinan (卑南, then Taitō, now Taitung City) to Rirō (里巄, now Guanshan) was opened in 1919 by the Taitō Development Company (臺東開拓株式會社).
In 1922, the Taitō Development Company bought the railroad from Karenkō to Tamazato and named it the "Taitō North Line", while the south segment from Taitō to Rirō was named the "Taitō South Line."
The construction of the connecting railway between Tamazato to Rirō began in 1921 and completed in 1926, after which the total length of the line from Karenkō (Hualien City) to Taitō (Taitung City) was 171.8 km.
In 1966, the Kuang-Hua Express (光華號) utilizing diesel multiple units started service on the line, and greatly shortening the travel time from Hualien to Taitung from 6–7 hours to 3–4 hours.
Its gauge was changed from 2 ft 6 in (762 mm) narrow gauge to 3 ft 6 in (1,067 mm) gauge in 1982 and connected with North-link line, after which the old Hualien Station was abandoned and replaced by the Hualien railway station that is used now. The site of old Hualian Station was eventually turned into Dongdamen Night Market in 2015, while the disused right of way has been partially turned into a pedestrian area.
In 2007, the Environmental Protection Administration gave the line a conditional pass for an electrification project, which would boost the operating speed from 110 km/h to 130 km/h. In 2009, construction began on electrification work, with NT$15.5 billion set aside for the project. Electrification work was completed in late 2013 with the inauguration of electric services taking place in late June 2014.
Hub AI
Taitung line AI simulator
(@Taitung line_simulator)
Taitung line
The Taitung Line (Chinese: 臺東線; pinyin: Táidōng Xiàn; Pe̍h-ōe-jī: Tâi-tang Soàⁿ), also known as the Hua-Tung line (Chinese: 花東線; pinyin: Huādōng Xiàn; Pe̍h-ōe-jī: Hoa-tang Soàⁿ), is the southern section of the Eastern Line of Taiwan Railway. The line starts at the Hualien station and ends at the Taitung station. It is 161.5 km long, including the main segment of 155.7 km between Hualien and Taitung.
The coastal branch lines of Hualien and Taitung were discarded after the broadening plan in 1982. The broadcasts of the station names on Taitung line are made in five languages: Mandarin, Taiwanese Hokkien, Hakka, English, and Amis. The Taitung Line is the only line in Taiwan where broadcasts are made in the Amis language.
The north segment from Karenkō (花蓮港, now Hualien City) to Poshiko (璞石閣 ポシコ, then Tamazato, now Yuli) was built in 1909 and completed in 1917. The south segment from Hinan (卑南, then Taitō, now Taitung City) to Rirō (里巄, now Guanshan) was opened in 1919 by the Taitō Development Company (臺東開拓株式會社).
In 1922, the Taitō Development Company bought the railroad from Karenkō to Tamazato and named it the "Taitō North Line", while the south segment from Taitō to Rirō was named the "Taitō South Line."
The construction of the connecting railway between Tamazato to Rirō began in 1921 and completed in 1926, after which the total length of the line from Karenkō (Hualien City) to Taitō (Taitung City) was 171.8 km.
In 1966, the Kuang-Hua Express (光華號) utilizing diesel multiple units started service on the line, and greatly shortening the travel time from Hualien to Taitung from 6–7 hours to 3–4 hours.
Its gauge was changed from 2 ft 6 in (762 mm) narrow gauge to 3 ft 6 in (1,067 mm) gauge in 1982 and connected with North-link line, after which the old Hualien Station was abandoned and replaced by the Hualien railway station that is used now. The site of old Hualian Station was eventually turned into Dongdamen Night Market in 2015, while the disused right of way has been partially turned into a pedestrian area.
In 2007, the Environmental Protection Administration gave the line a conditional pass for an electrification project, which would boost the operating speed from 110 km/h to 130 km/h. In 2009, construction began on electrification work, with NT$15.5 billion set aside for the project. Electrification work was completed in late 2013 with the inauguration of electric services taking place in late June 2014.