The Bow is a 158,000-square-metre (1,700,000 sq ft) skyscraper in Downtown Calgary, Alberta, Canada. The 236-metre (774 ft) building was the tallest in Calgary between July 8, 2010, when it surpassed the Suncor Energy Centre, and May 11, 2016, when it was exceeded by Brookfield Place. The Bow is currently the second-tallest office tower in Calgary and the third-tallest in Canada outside Toronto, Ontario. The Bow is also considered the start of redevelopment in Calgary's Downtown East Village. It was completed in 2012 and was ranked among the top 10 architectural projects in the world of that year according to Azure magazine. It was built for oil and gas company Encana, and was the headquarters of its successors Ovintiv and Cenovus.

EnCana Corporation (now Ovintiv), North America's second largest natural gas producer, announced plans for the high-rise in 2006. Early designs suggested that the project would consist of a complex of towers (perhaps two or more) over two blocks. The initial proposal was for a tower of 300 m (980 ft), which would have made it the second tallest building in Canada. Early sources suggested a two tower complex spanning the entire surface of two blocks, with a second tower of 40 to 50 stories connected at sixth stories level over 6 Avenue. Official statements declared that the tower will be 58 stories, or 247 metres (810 ft) tall.

The management company in charge of the project was Texas-based Matthews Southwest, with architectural services furnished by UK-based Foster + Partners and Zeidler Partnership Architects of Calgary.

The project filed for development permit application is called The Bow, for its crescent shape and the view of the Bow River. On October 12, 2006, Foster + Partners revealed the first designs for the new tower. The design of The Bow takes its form from an unbuilt 1996 Foster + Partners concept for London's Millennium Tower. The final tower stands 11 meters short of the original plan after concerns were raised regarding the shadow cast upon Bow River pathways.

Encana sold The Bow office project assets to H&R Real Estate Investment Trust in 2007 for $70 million, while signing a 25-year tenant lease agreement that was to start after the project's completion. Encana expected to occupy the entire tower.

In late June 2007, the company announced that the Portrait Gallery of Canada would not be moving from Ottawa into the Bow.

Groundbreaking took place on June 13, 2007, with work starting on both sides of 6 Avenue South between Centre Street and 1st Street East. Sixth Avenue was excavated, after closure of the block (August 21, 2007) and the six level underground parkade was constructed on a two block area, on both north and south side of 6th Avenue.

A neighbouring historic building – The York Hotel, built 1929–1930 in the Edwardian Commercial Architectural style – was demolished to make room for the new building. Because of the historical significance of the York Hotel, it was important to save as much as reasonable to incorporate into the new structure. Between 70 and 80 percent of the bricks were saved and used to reconstruct two of the hotel’s exterior walls. The brown brick originally supplied by Clayburn Brick in Abbotsford and the cast-in-concrete friezes have been removed, numbered and graphed to show the original location the brick and friezes were installed on the new building in their original locations. The remainder of the building was demolished ahead of schedule by Calgary-based demolition and environmental contractor Hazco.