Hubbry Logo
logo
Transperth A-series train
Community hub

Transperth A-series train

logo
0 subscribers
Be the first to start a discussion here.
Be the first to start a discussion here.
Contribute something to knowledge base
Hub AI

Transperth A-series train AI simulator

(@Transperth A-series train_simulator)

Transperth A-series train

The A-series trains are a class of electric multiple unit built by Walkers Limited in Maryborough, Queensland for Transperth between 1991 and 1999. When introduced in 1991, the A-series trains became the first electric passenger trains to operate in Western Australia and until 2004, were the only type of train in use on the Perth suburban rail network.

Studies for the electrification of Perth's suburban rail network began in 1984 and in 1988 43 two-car electric railcars were ordered from Walkers Limited, Maryborough. Prior to this, Perth's rail transport network consisted of three railway lines radiating from Perth and operated by a mixture of diesel railcars and diesel locomotive hauled trains. In 1979, one of these lines, the Fremantle line, was closed but reopened in 1983 following a change in State Government.

The trains were transported across the continent on standard gauge bogies and converted to Western Australia's 3 ft 6 in (1,067 mm) gauge standard locally. The first set, set 01, arrived in September 1990 and immediately became the subject of industrial action at Westrail's Midland Railway Workshops over a pay dispute and the impending one-man train operation which the new trains would ensure.

Testing of the new trains began soon afterwards and mostly on the Armadale line while the electrification process continued. While the trials were largely successful a number of negative points were noted, not the least of which were braking issues and the creation of a harmonic vibration from the train's bogies which caused nausea in otherwise healthy passengers.

The trains entered revenue service on the 28 September 1991, running Perth Royal Show specials and by April 1992 had virtually taken over the suburban network timetables, with only a very limited number of services still operated by the older diesel trains. The last entered service on 30 October 1992.

Some sets have been named:

The new trains revolutionised the commuter services on the Perth network, but their success was marred by project delays and a number of early accidents. Some of those accidents involved collisions with motor vehicles at unprotected level crossings, the increased speed and quieter operation as opposed to the older, slower and louder, diesel trains being considered as a contributing factor. In three accidents within the first twelve months of operations three fatalities - all in motor vehicles - were suffered.

Other accidents did not involve loss of life and some, such as a collision between sets while shunting at the train depot at Claisebrook, meant that some sets were mixed while their other half underwent repairs. Several months in 1993, for instance, saw the pairings of AEA226 and AEB339, and AEA217 and AEB326. When repairs were completed the original set combinations were restored.

See all
type of Transperth train
User Avatar
No comments yet.