Recent from talks
Tupolev Tu-160
Knowledge base stats:
Talk channels stats:
Members stats:
Tupolev Tu-160
The Tupolev Tu-160 (Russian: Туполев Ту-160 «Белый лебедь», romanized: Bely Lebed, lit. 'White Swan'; NATO reporting name: Blackjack) is a supersonic, variable-sweep wing nuclear-capable heavy strategic bomber and airborne missile platform designed by the Tupolev Design Bureau in the Soviet Union in the 1970s. The aircraft is large, rather longer than a Boeing B-52 Stratofortress at 54 m, with wingspan 56 m when spread, 36 m when swept back. The Tu-160 is operated by the Long Range Aviation branch of the Russian Aerospace Forces.
The Tu-160 entered service in 1987, the last strategic bomber designed for the Soviet Air Forces. It was built to serve as both a conventional and nuclear bomber. Production was stopped in 1992 following the dissolution of the Soviet Union in 1991, and the newly independent Russian and Ukrainian air forces inherited a fleet of 13 and 19 Tu-160s, respectively. Following protracted negotiations, eight Ukrainian Tu-160s were purchased by the Russian Federation while the remaining 11 were scrapped in the late 1990s under the Nunn–Lugar Cooperative Threat Reduction agreement. Following these actions, the sole operator of the aircraft type became the Russian Aerospace Forces' Long Range Aviation branch, which still had 17 Tu-160s in service as of 2022. The type had its combat debut in November 2015 during the Russian military intervention in the Syrian Civil War, conducting numerous airstrikes using Kh-101 air-launched cruise missiles. Various overseas deployments have been conducted, including to distant nations such as Venezuela and South Africa.
Since the early 2000s the active fleet has been subject to several upgrades, largely focusing on various electronics systems. A program of modernising existing aircraft to a new Tu-160M standard and building new aircraft was embarked upon, with the first updated aircraft delivered in December 2014. Plans were announced in 2015 for the delivery of 50 new-built Tu-160Ms and the upgrading of 16 existing aircraft.
The new bombers are reported to have more sophisticated armament, engines, and avionics than the original Tu-160. In January 2022, the first newly-built Tu-160M performed a test flight, with two new aircraft planned for delivery in 2022 of ten on order.[needs update]
The first competition for a supersonic strategic heavy bomber was launched in the Soviet Union in 1967. In 1972, the Soviet Union launched a new multi-mission bomber competition to create a new supersonic, variable-geometry ("swing-wing") heavy bomber with a maximum speed of Mach 2.3, in response to the US Air Force B-1 bomber project. The Tupolev design, named Aircraft 160M, with a lengthened blended wing layout and incorporating some elements of the Tu-144, competed against the Myasishchev M-18 and the Sukhoi T-4 designs. Work on the new Soviet bomber continued despite an end to the B-1A and, in the same year, the design was accepted by the government committee. The prototype was photographed by an airline passenger at a Zhukovsky Airfield in November 1981, about a month before the aircraft's first flight on 18 December 1981. Production was authorized in 1984, beginning at the Kazan Aircraft Production Association (KAPO).
In 2002, the Russian Defence Ministry and KAPO agreed to modernise 15 Tu-160s. In July 2006, the first overhauled and partially modernized aircraft was accepted into Russian service after testing; it reportedly received the capability to use conventional weapons but was not upgraded with new avionics as previously planned. The first modernized aircraft capable of carrying the new long-range Kh-555 conventional cruise missile was delivered to the Russian Air Force in April 2008; a follow-up contract for the modernization of three more aircraft is estimated to cost RUR3.4 billion (US$103 million).
The modernization appeared to be split into two phases, first concentrating on life extension with some initial communication–navigation updates, followed by engine upgrades after 2016. In November 2014, a Tu-160 upgraded with new radar and avionics performed its first flight. The aircraft was delivered to the Russian Air Force as the Tu-160M model in December 2014. The phase I update was due to be completed by 2016, but industrial limitations may delay it to 2019[needs update] or beyond.
Although Kuznetsov designed an NK-32M engine with improved reliability over the NK-32 engines, its successor company has struggled to deliver working units. Metallist-Samara JSC had not produced new engines for a decade when it was given a contract in 2011 to overhaul 26 of the existing engines; two years later, only four had been finished. Ownership and financial concerns hinder the prospects of a new production line; the firm insists it needs a minimum of 20 engines ordered per year but the government is only prepared to pay for 4–6 engines per year. A further improved engine was bench tested in 2012 and projected to potentially enter production as early as 2016.[needs update]
Hub AI
Tupolev Tu-160 AI simulator
(@Tupolev Tu-160_simulator)
Tupolev Tu-160
The Tupolev Tu-160 (Russian: Туполев Ту-160 «Белый лебедь», romanized: Bely Lebed, lit. 'White Swan'; NATO reporting name: Blackjack) is a supersonic, variable-sweep wing nuclear-capable heavy strategic bomber and airborne missile platform designed by the Tupolev Design Bureau in the Soviet Union in the 1970s. The aircraft is large, rather longer than a Boeing B-52 Stratofortress at 54 m, with wingspan 56 m when spread, 36 m when swept back. The Tu-160 is operated by the Long Range Aviation branch of the Russian Aerospace Forces.
The Tu-160 entered service in 1987, the last strategic bomber designed for the Soviet Air Forces. It was built to serve as both a conventional and nuclear bomber. Production was stopped in 1992 following the dissolution of the Soviet Union in 1991, and the newly independent Russian and Ukrainian air forces inherited a fleet of 13 and 19 Tu-160s, respectively. Following protracted negotiations, eight Ukrainian Tu-160s were purchased by the Russian Federation while the remaining 11 were scrapped in the late 1990s under the Nunn–Lugar Cooperative Threat Reduction agreement. Following these actions, the sole operator of the aircraft type became the Russian Aerospace Forces' Long Range Aviation branch, which still had 17 Tu-160s in service as of 2022. The type had its combat debut in November 2015 during the Russian military intervention in the Syrian Civil War, conducting numerous airstrikes using Kh-101 air-launched cruise missiles. Various overseas deployments have been conducted, including to distant nations such as Venezuela and South Africa.
Since the early 2000s the active fleet has been subject to several upgrades, largely focusing on various electronics systems. A program of modernising existing aircraft to a new Tu-160M standard and building new aircraft was embarked upon, with the first updated aircraft delivered in December 2014. Plans were announced in 2015 for the delivery of 50 new-built Tu-160Ms and the upgrading of 16 existing aircraft.
The new bombers are reported to have more sophisticated armament, engines, and avionics than the original Tu-160. In January 2022, the first newly-built Tu-160M performed a test flight, with two new aircraft planned for delivery in 2022 of ten on order.[needs update]
The first competition for a supersonic strategic heavy bomber was launched in the Soviet Union in 1967. In 1972, the Soviet Union launched a new multi-mission bomber competition to create a new supersonic, variable-geometry ("swing-wing") heavy bomber with a maximum speed of Mach 2.3, in response to the US Air Force B-1 bomber project. The Tupolev design, named Aircraft 160M, with a lengthened blended wing layout and incorporating some elements of the Tu-144, competed against the Myasishchev M-18 and the Sukhoi T-4 designs. Work on the new Soviet bomber continued despite an end to the B-1A and, in the same year, the design was accepted by the government committee. The prototype was photographed by an airline passenger at a Zhukovsky Airfield in November 1981, about a month before the aircraft's first flight on 18 December 1981. Production was authorized in 1984, beginning at the Kazan Aircraft Production Association (KAPO).
In 2002, the Russian Defence Ministry and KAPO agreed to modernise 15 Tu-160s. In July 2006, the first overhauled and partially modernized aircraft was accepted into Russian service after testing; it reportedly received the capability to use conventional weapons but was not upgraded with new avionics as previously planned. The first modernized aircraft capable of carrying the new long-range Kh-555 conventional cruise missile was delivered to the Russian Air Force in April 2008; a follow-up contract for the modernization of three more aircraft is estimated to cost RUR3.4 billion (US$103 million).
The modernization appeared to be split into two phases, first concentrating on life extension with some initial communication–navigation updates, followed by engine upgrades after 2016. In November 2014, a Tu-160 upgraded with new radar and avionics performed its first flight. The aircraft was delivered to the Russian Air Force as the Tu-160M model in December 2014. The phase I update was due to be completed by 2016, but industrial limitations may delay it to 2019[needs update] or beyond.
Although Kuznetsov designed an NK-32M engine with improved reliability over the NK-32 engines, its successor company has struggled to deliver working units. Metallist-Samara JSC had not produced new engines for a decade when it was given a contract in 2011 to overhaul 26 of the existing engines; two years later, only four had been finished. Ownership and financial concerns hinder the prospects of a new production line; the firm insists it needs a minimum of 20 engines ordered per year but the government is only prepared to pay for 4–6 engines per year. A further improved engine was bench tested in 2012 and projected to potentially enter production as early as 2016.[needs update]
