Type 214 submarine

The Type 214 is a class of diesel–electric submarines developed exclusively for export by Howaldtswerke-Deutsche Werft GmbH (HDW). It features diesel propulsion with an air-independent propulsion (AIP) system using polymer electrolyte membrane (PEM) hydrogen fuel cells from Siemens Energy. The class combines the design principles of the Type 209 submarine family and the features of the Type 212A submarine. However, as an export design, it lacks some of the classified technologies of the Type 212 such as the non-magnetic steel hull that makes it difficult to detect using a magnetic anomaly detector.

Due to improvements in the pressure hull materials, the Type 214 can dive nearly 400 metres (1,300 ft). It can also carry food, fresh water and fuel for 84 days of operation.

A contract to build four submarines for the Hellenic Navy was signed 15 February 2000 and a fourth unit was ordered in June 2002.[citation needed] The first submarine was built at HDW in Kiel, Germany and the rest at the Hellenic Shipyards Co. in Skaramangas, Greece. The Hellenic Navy named them the Papanikolis class.

The Republic of Korea Navy has ordered nine Type 214 submarines, designated as Son Won-Il class, to be built in Korea by Hyundai Heavy Industries and Daewoo Shipbuilding & Marine Engineering; three first batch models entered service since 2007, and six second batch models entered service from 2012.[citation needed]

The Hellenic Navy ordered four Type 214 submarines to be known as the Papanikolis class. The first, Papanikolis, was built in Germany; the following three were scheduled for construction at HDW's Hellenic Shipyards in Greece. In December 2006, StrategyPage reported that Papanikolis was found to have numerous technical problems. Among the reported problems with the submarine were excessive propeller cavitation, overheating of the air-independent propulsion system's fuel cells, and excessive rolling in bad weather when surfaced. Seapower magazine reported the Hellenic Navy refused to accept Papanikolis; additional problems noted were inadequate air-independent propulsion system output power, inappropriate periscope vibration, sonar flank array problems and seawater leakage into the ship's hydraulics.

The Hellenic Navy officers in charge of the testing program at the Kiel shipyards in Germany made their case clear in a 2007 investigative journalism program called "Neoi Fakeloi" on Skai TV (Greece). Retired Rear Admiral M. Simionakis, who had been in charge of the Papanikolis program for the navy, told the interviewer that the manufacturer had made two attempts to fix a severe balance problem in the submarine, including shifting 21 tons of material from the top to the bottom, yet the vessel continued to heel as much as 46 degrees in sea trials. Photographic evidence of the severe heeling was presented. In the same TV program, the officer replacing Simionakis in Kiel, Capt. K. Tziotis, listed seven ongoing, serious problems with the vessel, including balance problems when traveling on the surface, problems with the AIP system, problems with the weapon system, problems with the periscope, and problems with flooding.

TKMS, the German shipbuilder of Type 214, had previously asserted that it solved all the boat's technical problems in 2006 and stated that the Greek Navy's continuing complaints about Papanikolis' technical condition are a ploy to justify a price reduction. Therefore, TKMS refused to deliver the boat to the Greek Navy until all debts were paid and Papanikolis remained in Kiel harbor. Despite this position by TKMS, the Hellenic Navy officers in charge of the submarine delivery have repeatedly stated there are problems with Papanikolis. In October 2008, Papanikolis conducted a new round of trials, which showed that the excessive rolling problem had finally been fixed. The rest of the problems are considered solved. According to the Greek defence press, acceptance of the vessel was imminent.[citation needed] The second boat, Pipinos, was officially launched on 6 October 2014 and passed through Greek harbour acceptance trials in Elefsina.[citation needed]

On 21 September 2009, TKMS announced that the contract with the Greek Navy for all four submarines had been cancelled due to country's arrears of more than 520 million Euros. TKMS began seeking arbitration to resolve the matter.