Vienna International Airport
Vienna Airport (IATA: VIE, ICAO: LOWW) is an international airport serving Vienna, the capital of Austria. It is located in Schwechat, 18 km (11 mi) southeast of central Vienna and 57 kilometres (35 mi) west of Bratislava, the capital of Slovakia. Its official name according to the Austrian Aeronautical Information Publication is Wien-Schwechat Airport. It is the country's largest airport and serves as the hub for Austrian Airlines as well as a base for low-cost carrier Ryanair and since April 2025 also for leisure airline Condor. It is capable of handling wide-body aircraft up to the Airbus A380. The airport features a dense network of European destinations as well as long-haul flights to Asia, North America and Africa.
On 27 December 1985, the El Al ticket counter was attacked by Abu Nidal, a Palestinian terrorist organisation that simultaneously conducted a terrorist attack at Fiumicino Airport in Rome.
Flughafen Wien AG, one of the few publicly traded airport operators in Europe, was privatised in 1992. The state of Lower Austria and the City of Vienna each hold 20% of the shares, the private employee participation foundation holds 10%, with the remaining 50% held privately. The shares used to be part of the Austrian Traded Index but were removed in September 2017.
To accommodate future growth, in 1998 Vienna Airport published a master plan that outlined expansion projects until 2015. These projects included a new office park, railway station, cargo centre, general aviation centre, air traffic control tower, terminal, and runway. Additionally, the plan called for streamlined security control. The centrepiece of the enlargement was the new terminal, dubbed Skylink during its construction. In 2002, the airport's management estimated that building the new terminal will cost €401.79 million. However, costs skyrocketed and in 2009 stood at an estimated €929.5 million. The Austrian Court of Audit then recommended that the airport implement several cost-savings measures, which in the Court's estimate brought down final costs to €849.15 million, still more than double the original plans.
On 5 June 2012, the new Austrian Star Alliance Terminal (Terminal 3, named Skylink during its construction) was opened, which enables the airport to handle up to 30 million passengers per year. Construction started in 2004 and was suspended due to projected cost increases in 2009, but resumed in 2010. The maximum planned costs totaled less than €770 million. Following concerns over the mismanagement of the Skylink project, chief executive Herbert Kaufman agreed to resign at the end of December 2010. The new building with its North Pier has 17 jetbridges and makes the airport capable of handling more aircraft, although the new terminal is not able to handle Airbus A380 aircraft. However, the older Concourse D will see an upgrade to accommodate the A380.
The airport has four terminal buildings named Terminal 1, 2 and 3 which are directly built against each other as well as the additional Terminal 1A located opposite Terminal 1. Terminals 1, 2 and 3 connect to the five concourses. The central arrivals hall for all terminal areas is located in Terminal 3.
In addition to the aforementioned refurbishments of existing passenger facilities, a completely new building is under construction as of early 2024, which is supposed to connect the existing pier east and pier north. The so-called T3 Southern Enlargement will be offering 70,000 m2 (750,000 sq ft) of leisure area, 10,000 m² of which will be used for shops and restaurants etc. The building will also feature 18 new additional bus gates, including 9 gates for Schengen Destinations and 9 gates for Non-Schengen Destinations. The opening had originally been planned for 2023, however, the project had been delayed in the wake of the COVID-19 pandemic. In January 2023 it was announced that the construction of the new building was then set to start in mid-2023. Construction for the new terminal annex subsequently started in February 2024 with a completion date expected for early 2027.
Vienna Airport originally projected that it would need a third runway by 2012, or 2016 at the latest, in the event of cooperation with nearby Bratislava Airport. The third runway is planned to be parallel to and south of the existing runway 11/29. It will be designated 11R/29L, with the existing runway being renamed 11L/29R. The new runway is planned to be 3,680 m (12,070 ft) long and 60 m (200 ft) wide, and equipped with a category III instrument landing system in one direction (29L).
Hub AI
Vienna International Airport AI simulator
(@Vienna International Airport_simulator)
Vienna International Airport
Vienna Airport (IATA: VIE, ICAO: LOWW) is an international airport serving Vienna, the capital of Austria. It is located in Schwechat, 18 km (11 mi) southeast of central Vienna and 57 kilometres (35 mi) west of Bratislava, the capital of Slovakia. Its official name according to the Austrian Aeronautical Information Publication is Wien-Schwechat Airport. It is the country's largest airport and serves as the hub for Austrian Airlines as well as a base for low-cost carrier Ryanair and since April 2025 also for leisure airline Condor. It is capable of handling wide-body aircraft up to the Airbus A380. The airport features a dense network of European destinations as well as long-haul flights to Asia, North America and Africa.
On 27 December 1985, the El Al ticket counter was attacked by Abu Nidal, a Palestinian terrorist organisation that simultaneously conducted a terrorist attack at Fiumicino Airport in Rome.
Flughafen Wien AG, one of the few publicly traded airport operators in Europe, was privatised in 1992. The state of Lower Austria and the City of Vienna each hold 20% of the shares, the private employee participation foundation holds 10%, with the remaining 50% held privately. The shares used to be part of the Austrian Traded Index but were removed in September 2017.
To accommodate future growth, in 1998 Vienna Airport published a master plan that outlined expansion projects until 2015. These projects included a new office park, railway station, cargo centre, general aviation centre, air traffic control tower, terminal, and runway. Additionally, the plan called for streamlined security control. The centrepiece of the enlargement was the new terminal, dubbed Skylink during its construction. In 2002, the airport's management estimated that building the new terminal will cost €401.79 million. However, costs skyrocketed and in 2009 stood at an estimated €929.5 million. The Austrian Court of Audit then recommended that the airport implement several cost-savings measures, which in the Court's estimate brought down final costs to €849.15 million, still more than double the original plans.
On 5 June 2012, the new Austrian Star Alliance Terminal (Terminal 3, named Skylink during its construction) was opened, which enables the airport to handle up to 30 million passengers per year. Construction started in 2004 and was suspended due to projected cost increases in 2009, but resumed in 2010. The maximum planned costs totaled less than €770 million. Following concerns over the mismanagement of the Skylink project, chief executive Herbert Kaufman agreed to resign at the end of December 2010. The new building with its North Pier has 17 jetbridges and makes the airport capable of handling more aircraft, although the new terminal is not able to handle Airbus A380 aircraft. However, the older Concourse D will see an upgrade to accommodate the A380.
The airport has four terminal buildings named Terminal 1, 2 and 3 which are directly built against each other as well as the additional Terminal 1A located opposite Terminal 1. Terminals 1, 2 and 3 connect to the five concourses. The central arrivals hall for all terminal areas is located in Terminal 3.
In addition to the aforementioned refurbishments of existing passenger facilities, a completely new building is under construction as of early 2024, which is supposed to connect the existing pier east and pier north. The so-called T3 Southern Enlargement will be offering 70,000 m2 (750,000 sq ft) of leisure area, 10,000 m² of which will be used for shops and restaurants etc. The building will also feature 18 new additional bus gates, including 9 gates for Schengen Destinations and 9 gates for Non-Schengen Destinations. The opening had originally been planned for 2023, however, the project had been delayed in the wake of the COVID-19 pandemic. In January 2023 it was announced that the construction of the new building was then set to start in mid-2023. Construction for the new terminal annex subsequently started in February 2024 with a completion date expected for early 2027.
Vienna Airport originally projected that it would need a third runway by 2012, or 2016 at the latest, in the event of cooperation with nearby Bratislava Airport. The third runway is planned to be parallel to and south of the existing runway 11/29. It will be designated 11R/29L, with the existing runway being renamed 11L/29R. The new runway is planned to be 3,680 m (12,070 ft) long and 60 m (200 ft) wide, and equipped with a category III instrument landing system in one direction (29L).