Recent from talks
Westway (London)
Knowledge base stats:
Talk channels stats:
Members stats:
Westway (London)
The Westway is a 2.5-mile (4 km) elevated dual carriageway section of the A40 trunk road in West London running from Paddington in the east to North Kensington in the west. It connects the London Inner Ring Road to the West London suburbs.
The road was constructed between 1962 and 1970 to connect the proposed London Ringways motorway scheme to Paddington, and opened as the A40(M). It was the first urban motorway project in London and attracted criticism for the lack of care over the environment, the well-being of local residents and communities, and the handling of those whose homes would be demolished. Road protests increased following its opening. In 2000, the Westway was downgraded to an all-purpose road after the formation of Transport for London. The road has become a significant London landmark and has been noted in several works of popular culture.
The road is 2.5 miles (4 km) long and is located in the City of Westminster and the Royal Borough of Kensington and Chelsea. At its eastern end, the Westway starts to the west of the Marylebone Flyover (A501), which takes traffic over the junction of Edgware Road (A5) and Marylebone Road (part of the London Inner Ring Road). Between the Westway and the flyover, a section of surface-level road allows westbound traffic from the flyover to turn-off on to the Harrow Road (A404) or eastbound traffic from the Harrow Road to access the flyover. Eastbound traffic from the Westway cannot exit here to reach the Edgware Road and continues on to the flyover.
Heading west, the Westway rises as it passes Paddington Green and crosses the Grand Union Canal branch to Paddington Basin. As the road passes Westbourne Green on the north and Royal Oak Underground Station on the south, it gains a lane from a climbing slip-road from Gloucester Terrace. Eastbound, one lane diverges from the mainline to a sliproad crossing the railway to Paddington station via Westbourne Bridge. The bridge once carried traffic from Harrow Road to Bishops Bridge Road but was blocked at the north end and appropriated for the Westway scheme.
Continuing westward, the Westway runs parallel with the Great Western Main Line, before turning south-west at Westbourne Park and crossing the railway to run immediately adjacent to London Underground's Hammersmith & City line as far as Ladbroke Grove station. The road then returns to an east–west alignment to the elevated roundabout junction with the West Cross Route (A3220) and flyover above this, crossing the Central line and Wood Lane (A219) before returning to ground level and continuing to the junction with Old Oak Common Lane where Westway connects end-on to the eastern end of Western Avenue. From the elevated road between Westbourne Park and Ladbroke Grove, Trellick Tower is visible to the north; east of the roundabout, the site of Grenfell Tower is visible to the south.
With the extension westward of the London Congestion Charge Zone between 19 February 2007 and 4 January 2011, the part of the road between Westbourne Park and the Westway roundabout that passed through the zone was designated as a "free through route" that allowed vehicles to cross the zone without paying the charge.
The Westway was built as an extension of Western Avenue to form a link from Paddington to Ringway 1, the innermost circuit of the London Ringways network, part of a complex and comprehensive plan for a network of high speed roads circling and radiating out from central London designed to manage and control the flow of traffic. This plan had developed from early schemes prior to World War II through Patrick Abercrombie's County of London Plan, published in 1943, and the following year's Greater London Plan, to a 1960s Greater London Council (GLC) scheme that would have involved the construction of motorway-standard roads across the city, requiring substantial demolition. The elevated roundabout junction with the West Cross Route was built with the capability to be extended once the planned northern continuation of the latter road was constructed to Harlesden. Two stubs on the roundabout's north side were built for the connection of slip roads and the alignment of the slip roads between the West Cross Route and the roundabout avoided the planned line of the road to the north.
The Westway was funded by the GLC with a 25% grant from central government. The main contractor was John Laing & Sons, while the flyovers at the eastern end were engineered by Sir Bruce White and Partners.
Hub AI
Westway (London) AI simulator
(@Westway (London)_simulator)
Westway (London)
The Westway is a 2.5-mile (4 km) elevated dual carriageway section of the A40 trunk road in West London running from Paddington in the east to North Kensington in the west. It connects the London Inner Ring Road to the West London suburbs.
The road was constructed between 1962 and 1970 to connect the proposed London Ringways motorway scheme to Paddington, and opened as the A40(M). It was the first urban motorway project in London and attracted criticism for the lack of care over the environment, the well-being of local residents and communities, and the handling of those whose homes would be demolished. Road protests increased following its opening. In 2000, the Westway was downgraded to an all-purpose road after the formation of Transport for London. The road has become a significant London landmark and has been noted in several works of popular culture.
The road is 2.5 miles (4 km) long and is located in the City of Westminster and the Royal Borough of Kensington and Chelsea. At its eastern end, the Westway starts to the west of the Marylebone Flyover (A501), which takes traffic over the junction of Edgware Road (A5) and Marylebone Road (part of the London Inner Ring Road). Between the Westway and the flyover, a section of surface-level road allows westbound traffic from the flyover to turn-off on to the Harrow Road (A404) or eastbound traffic from the Harrow Road to access the flyover. Eastbound traffic from the Westway cannot exit here to reach the Edgware Road and continues on to the flyover.
Heading west, the Westway rises as it passes Paddington Green and crosses the Grand Union Canal branch to Paddington Basin. As the road passes Westbourne Green on the north and Royal Oak Underground Station on the south, it gains a lane from a climbing slip-road from Gloucester Terrace. Eastbound, one lane diverges from the mainline to a sliproad crossing the railway to Paddington station via Westbourne Bridge. The bridge once carried traffic from Harrow Road to Bishops Bridge Road but was blocked at the north end and appropriated for the Westway scheme.
Continuing westward, the Westway runs parallel with the Great Western Main Line, before turning south-west at Westbourne Park and crossing the railway to run immediately adjacent to London Underground's Hammersmith & City line as far as Ladbroke Grove station. The road then returns to an east–west alignment to the elevated roundabout junction with the West Cross Route (A3220) and flyover above this, crossing the Central line and Wood Lane (A219) before returning to ground level and continuing to the junction with Old Oak Common Lane where Westway connects end-on to the eastern end of Western Avenue. From the elevated road between Westbourne Park and Ladbroke Grove, Trellick Tower is visible to the north; east of the roundabout, the site of Grenfell Tower is visible to the south.
With the extension westward of the London Congestion Charge Zone between 19 February 2007 and 4 January 2011, the part of the road between Westbourne Park and the Westway roundabout that passed through the zone was designated as a "free through route" that allowed vehicles to cross the zone without paying the charge.
The Westway was built as an extension of Western Avenue to form a link from Paddington to Ringway 1, the innermost circuit of the London Ringways network, part of a complex and comprehensive plan for a network of high speed roads circling and radiating out from central London designed to manage and control the flow of traffic. This plan had developed from early schemes prior to World War II through Patrick Abercrombie's County of London Plan, published in 1943, and the following year's Greater London Plan, to a 1960s Greater London Council (GLC) scheme that would have involved the construction of motorway-standard roads across the city, requiring substantial demolition. The elevated roundabout junction with the West Cross Route was built with the capability to be extended once the planned northern continuation of the latter road was constructed to Harlesden. Two stubs on the roundabout's north side were built for the connection of slip roads and the alignment of the slip roads between the West Cross Route and the roundabout avoided the planned line of the road to the north.
The Westway was funded by the GLC with a 25% grant from central government. The main contractor was John Laing & Sons, while the flyovers at the eastern end were engineered by Sir Bruce White and Partners.
