Hubbry Logo
search
logo
2327364

Apollo 12

logo
Community Hub0 Subscribers
Write something...
Be the first to start a discussion here.
Be the first to start a discussion here.
See all
Apollo 12

Apollo 12 (November 14–24, 1969) was the sixth crewed flight in the United States Apollo program and the second to land on the Moon. It was launched on November 14, 1969, by NASA from the Kennedy Space Center in Florida. Commander Charles "Pete" Conrad and Lunar Module Pilot Alan L. Bean completed just over one day and seven hours of lunar surface activity while Command Module Pilot Richard F. Gordon remained in lunar orbit.

Apollo 12 would have attempted the first lunar landing had Apollo 11 failed, but after the success of the earlier mission, Apollo 12 was postponed by two months, and other Apollo missions also put on a more relaxed schedule. More time was allotted for geologic training in preparation for Apollo 12 than for Apollo 11, Conrad and Bean making several geology field trips in preparation for their mission. Apollo 12's spacecraft and launch vehicle were almost identical to Apollo 11's. One addition was a set of hammocks, designed to provide Conrad and Bean with a more comfortable resting arrangement inside the Lunar Module during their stay on the Moon.

Shortly after being launched on a rainy day at Kennedy Space Center, Apollo 12 was twice struck by lightning, causing instrumentation problems but little damage. The crew found that switching to the auxiliary power supply resolved the data relay problem, which helped save the mission. The outward journey to the Moon otherwise saw few problems. On November 19, Conrad and Bean achieved a precise landing at their expected location within walking distance of the Surveyor 3 robotic probe, which had landed on April 20, 1967. In making a pinpoint landing, they showed that NASA could plan future missions in the expectation that astronauts could land close to sites of scientific interest. Conrad and Bean carried the Apollo Lunar Surface Experiments Package, a group of nuclear-powered scientific instruments, as well as the first color television camera taken by an Apollo mission to the lunar surface, but transmission was lost after Bean accidentally pointed the camera at the Sun and its sensor was burned out. On the second of two moonwalks, they visited Surveyor 3 and removed parts for return to Earth.

Lunar Module Intrepid lifted off from the Moon on November 20 and docked with the command module, which subsequently traveled back to Earth. The Apollo 12 mission ended on November 24 with a splashdown.

The commander of the all-Navy Apollo 12 crew was Charles "Pete" Conrad, who was 39 years old at the time of the mission. After receiving a bachelor's degree in aeronautical engineering from Princeton University in 1953, he became a naval aviator, and completed United States Naval Test Pilot School at Patuxent River Naval Air Station. He was selected in the second group of astronauts in 1962, and flew on Gemini 5 in 1965, and as command pilot of Gemini 11 in 1966. Command Module Pilot Richard "Dick" Gordon, 40 years old at the time of Apollo 12, also became a naval aviator in 1953, following graduation from the University of Washington with a degree in chemistry, and completed test pilot school at Patuxent River. Selected as a Group 3 astronaut in 1963, he flew with Conrad on Gemini 11.

The original Lunar Module pilot assigned to work with Conrad was Clifton C. Williams Jr., who was killed in October 1967 when the T-38 he was flying crashed near Tallahassee. When forming his crew, Conrad had wanted Alan L. Bean, a former student of his at the test pilot school, but had been told by Director of Flight Crew Operations Deke Slayton that Bean was unavailable due to an assignment to the Apollo Applications Program. After Williams's death, Conrad asked for Bean again, and this time Slayton yielded. Bean, 37 years old when the mission flew, had graduated from the University of Texas in 1955 with a degree in aeronautical engineering. Also a naval aviator, he was selected alongside Gordon in 1963, and first flew in space on Apollo 12. The three Apollo 12 crew members had backed up Apollo 9 earlier in 1969.

The Apollo 12 backup crew was David R. Scott as commander, Alfred M. Worden as Command Module pilot, and James B. Irwin as Lunar Module pilot. They became the crew of Apollo 15. For Apollo, a third crew of astronauts, known as the support crew, was designated in addition to the prime and backup crews used on projects Mercury and Gemini. Slayton created the support crews because James McDivitt, who would command Apollo 9, believed that, with preparation going on in facilities across the US, meetings that needed a member of the flight crew would be missed. Support crew members were to assist as directed by the mission commander. Usually low in seniority, they assembled the mission's rules, flight plan, and checklists, and kept them updated; For Apollo 12, they were Gerald P. Carr, Edward G. Gibson and Paul J. Weitz. Flight directors were Gerry Griffin, first shift, Pete Frank, second shift, Clifford E. Charlesworth, third shift, and Milton Windler, fourth shift. Flight directors during Apollo had a one-sentence job description, "The flight director may take any actions necessary for crew safety and mission success." Capsule communicators (CAPCOMs) were Scott, Worden, Irwin, Carr, Gibson, Weitz and Don Lind.

The landing site selection process for Apollo 12 was greatly informed by the site selection for Apollo 11. There were rigid standards for the possible Apollo 11 landing sites, in which scientific interest was not a major factor: they had to be close to the lunar equator and not on the periphery of the portion of the lunar surface visible from Earth; they had to be relatively flat and without major obstructions along the path the Lunar Module (LM) would fly to reach them, their suitability confirmed by photographs from Lunar Orbiter probes. Also desirable was the presence of another suitable site further west in case the mission was delayed, and the Sun would have risen too high in the sky at the original site for desired lighting conditions. The need for three days to recycle if a launch had to be scrubbed meant that only three of the five suitable sites found were designated as potential landing sites for Apollo 11, of which the Apollo 11 landing site in the Sea of Tranquility was the easternmost. Since Apollo 12 was to attempt the first lunar landing if Apollo 11 failed, both sets of astronauts trained for the same sites.

See all
User Avatar
No comments yet.