The Baltic Defence Line (Estonian: Balti kaitsevöönd,[1] Latvian: Baltijas aizsardzības līnija, Lithuanian: Baltijos gynybos linija) is a planned joint defense line by Estonia, Latvia and Lithuania along their borders with Russia and Belarus.[2] The Baltic Defence Line was announced on 19 January 2024, in a joint-meeting between the Ministers of Defence of Latvia, Estonia and Lithuania in Riga.[3] The Baltic Defence Line began construction in Estonia in June 2025,[1][4] construction is to begin in Lithuania by the end of summer 2024,[5] and construction began in Latvia on 2 May 2024.[6]
According to Baiba Braže, the Foreign Minister of Latvia, the Baltic Defence Line could take up to a decade to be completed.[7]
The Baltic Defence Line is planned to consist of anti-mobility defensive installations,[8] such as at least six-hundred bunkers across each individual national border,[note 1] the usage of natural and artificial obstacles, such as forestry and rivers, and anti-tank ditches along the borders of the three Baltic states.[6][9] It is suspected that M142 HIMARS artillery rocket systems are also to be used for defensive capabilities.[8][10]
Alongside the defensive installations, the Baltic Defence Line is to also consist of storage areas, where defensive elements such as dragon's teeth, anti-tank hedgehog and razor wire are to be kept.[1]
The Baltic Defence Line began to be proposed in response to the Russian Invasion of Ukraine in February 2022, and in fears over Russian threats to the Baltic states.[11] The concept of defensive installations was decided at the 2022 NATO Summit in Madrid.[4]