Recent from talks
Knowledge base stats:
Talk channels stats:
Members stats:
California Aqueduct
The Governor Edmund G. Brown California Aqueduct is a system of canals, tunnels, and pipelines that conveys water collected from the Sierra Nevada and valleys of Northern and Central California to Southern California. Named after California Governor Edmund Gerald "Pat" Brown Sr., the over 400-mile (640 km) aqueduct is the principal feature of the California State Water Project.
The aqueduct begins at the Clifton Court Forebay at the southwestern corner of the Sacramento–San Joaquin River Delta. The aqueduct then heads south, eventually splitting into three branches: the Coastal Branch, ending at Lake Cachuma in Santa Barbara County; the West Branch, conveying water to Castaic Lake in Los Angeles County; and the East Branch, connecting Silverwood Lake in San Bernardino County.
The Department of Water Resources (DWR) operates and maintains the California Aqueduct, including one pumped-storage hydroelectric plant, Gianelli Power Plant. Gianelli is located at the base of San Luis Dam, which forms San Luis Reservoir, the largest offstream reservoir in the United States.
The Castaic Power Plant, while similar and which is owned and operated by the Los Angeles Department of Water and Power, is located on the northern end of Castaic Lake, while Castaic Dam is located at the southern end.
Land subsidence has occurred along the aqueduct and has had a steady increase since its relatively stable state post construction of the aqueduct.
The aqueduct serves 35 million people and 5.7 million acres of farmland, and begins at the San Joaquin-Sacramento River Delta at the Banks Pumping Plant, which pumps from the Clifton Court Forebay. Water is pumped by the Banks Pumping Plant to the Bethany Reservoir. The reservoir serves as a forebay for the South Bay Aqueduct via the South Bay Pumping Plant. From the Bethany Reservoir, the aqueduct flows by gravity approximately 60 mi (97 km) to the O'Neill Forebay at the San Luis Reservoir. From the O'Neill Forebay, it flows approximately 16 mi (26 km) to the Dos Amigos Pumping Plant. After Dos Amigos, the aqueduct flows about 95 mi (153 km) to where the Coastal Branch splits from the "main line". The split is approximately 16 mi (26 km) south-southeast of Kettleman City. After the coastal branch, the line continues by gravity another 66 mi (106 km) to the Buena Vista Pumping Plant. From the Buena Vista, it flows approximately 27 mi (43 km) to the Teerink Pumping Plant. After Teerink it flows about 2.5 mi (4.0 km) to the Chrisman Pumping Plant. Chrisman is the last pumping plant before Edmonston Pumping Plant, which is 13 mi (21 km) from Chrisman. South of the plant the west branch splits off in a southwesterly direction to serve the Los Angeles Basin. At Edmonston Pumping Plant it is pumped 1,926 ft (587 m) over the Tehachapi Mountains.
Water flows through the aqueduct in a series of abrupt rises and gradual falls. The water flows down a long segment, built at a slight grade, and arrives at a pumping station powered by Path 66 or Path 15. The pumping station raises the water, where it again gradually flows downhill to the next station. However, where there are substantial drops, the water's potential energy is recaptured by hydroelectric plants. The initial pumping station fed by the Sacramento River Delta raises the water 240 ft (73 m), while a series of pumps culminating at the Edmonston Pumping Plant raises the water 1,926 ft (587 m) over the Tehachapi Mountains.
A typical section has a concrete-lined channel 40 feet (12 m) at the base and an average water depth of about 30 ft (9.1 m). The widest section of the aqueduct is 110 feet (34 m) and the deepest is 32 feet (9.8 m). Channel capacity is 13,100 cubic feet per second (370 m3/s) and the largest pumping plant capacity at Dos Amigos is 15,450 cubic feet per second (437 m3/s).
Hub AI
California Aqueduct AI simulator
(@California Aqueduct_simulator)
California Aqueduct
The Governor Edmund G. Brown California Aqueduct is a system of canals, tunnels, and pipelines that conveys water collected from the Sierra Nevada and valleys of Northern and Central California to Southern California. Named after California Governor Edmund Gerald "Pat" Brown Sr., the over 400-mile (640 km) aqueduct is the principal feature of the California State Water Project.
The aqueduct begins at the Clifton Court Forebay at the southwestern corner of the Sacramento–San Joaquin River Delta. The aqueduct then heads south, eventually splitting into three branches: the Coastal Branch, ending at Lake Cachuma in Santa Barbara County; the West Branch, conveying water to Castaic Lake in Los Angeles County; and the East Branch, connecting Silverwood Lake in San Bernardino County.
The Department of Water Resources (DWR) operates and maintains the California Aqueduct, including one pumped-storage hydroelectric plant, Gianelli Power Plant. Gianelli is located at the base of San Luis Dam, which forms San Luis Reservoir, the largest offstream reservoir in the United States.
The Castaic Power Plant, while similar and which is owned and operated by the Los Angeles Department of Water and Power, is located on the northern end of Castaic Lake, while Castaic Dam is located at the southern end.
Land subsidence has occurred along the aqueduct and has had a steady increase since its relatively stable state post construction of the aqueduct.
The aqueduct serves 35 million people and 5.7 million acres of farmland, and begins at the San Joaquin-Sacramento River Delta at the Banks Pumping Plant, which pumps from the Clifton Court Forebay. Water is pumped by the Banks Pumping Plant to the Bethany Reservoir. The reservoir serves as a forebay for the South Bay Aqueduct via the South Bay Pumping Plant. From the Bethany Reservoir, the aqueduct flows by gravity approximately 60 mi (97 km) to the O'Neill Forebay at the San Luis Reservoir. From the O'Neill Forebay, it flows approximately 16 mi (26 km) to the Dos Amigos Pumping Plant. After Dos Amigos, the aqueduct flows about 95 mi (153 km) to where the Coastal Branch splits from the "main line". The split is approximately 16 mi (26 km) south-southeast of Kettleman City. After the coastal branch, the line continues by gravity another 66 mi (106 km) to the Buena Vista Pumping Plant. From the Buena Vista, it flows approximately 27 mi (43 km) to the Teerink Pumping Plant. After Teerink it flows about 2.5 mi (4.0 km) to the Chrisman Pumping Plant. Chrisman is the last pumping plant before Edmonston Pumping Plant, which is 13 mi (21 km) from Chrisman. South of the plant the west branch splits off in a southwesterly direction to serve the Los Angeles Basin. At Edmonston Pumping Plant it is pumped 1,926 ft (587 m) over the Tehachapi Mountains.
Water flows through the aqueduct in a series of abrupt rises and gradual falls. The water flows down a long segment, built at a slight grade, and arrives at a pumping station powered by Path 66 or Path 15. The pumping station raises the water, where it again gradually flows downhill to the next station. However, where there are substantial drops, the water's potential energy is recaptured by hydroelectric plants. The initial pumping station fed by the Sacramento River Delta raises the water 240 ft (73 m), while a series of pumps culminating at the Edmonston Pumping Plant raises the water 1,926 ft (587 m) over the Tehachapi Mountains.
A typical section has a concrete-lined channel 40 feet (12 m) at the base and an average water depth of about 30 ft (9.1 m). The widest section of the aqueduct is 110 feet (34 m) and the deepest is 32 feet (9.8 m). Channel capacity is 13,100 cubic feet per second (370 m3/s) and the largest pumping plant capacity at Dos Amigos is 15,450 cubic feet per second (437 m3/s).