Circle line (London Underground)
Circle line (London Underground)
Main page
2297037

Circle line (London Underground)

logo
Community Hub0 subscribers
What are your thoughts?
Be the first to start a discussion here.
Be the first to start a discussion here.
Circle line (London Underground)

The Circle line is a spiral-shaped London Underground line, running from Hammersmith in the west to Edgware Road and then looping around central London back to Edgware Road. The railway is below ground in the central section and on the loop east of Paddington. Unlike London's deep-level lines, the Circle line tunnels are just below the surface and are of similar size to those on British main lines. Printed in yellow on the Tube map, the 17-mile (27 km) line serves 36 stations, including most of London's main line termini. Almost all of the route, and all the stations, are shared with one or more of the three other sub-surface lines, namely the District, Hammersmith & City and Metropolitan lines. On the Circle and Hammersmith & City lines combined, over 141 million passenger journeys were recorded in 2019.

The first section became operational in 1863 when the Metropolitan Railway opened the world's first underground line between Paddington and Farringdon with wooden carriages and steam locomotives. The same year a select committee report recommended an "inner circle" of lines connecting the London railway termini, and the Metropolitan District Railway (commonly known as the District Railway) was formed to build the southern portion of the line.

In 1871, services began between Mansion House and Moorgate via Paddington, jointly operated by the two companies. Due to conflict between the two companies it was not until October 1884 that the inner circle was completed. The line was electrified in 1905, and in 1933 the companies were amalgamated into the London Passenger Transport Board. In 1949, the Circle line appeared as a separate line for the first time on the Tube map. In 2009, the closed loop around the centre of London on the north side of the River Thames was broken at Edgware Road and extended west to become a spiral to Hammersmith.

Starting in 2015, the signalling system was upgraded as part of a programme to increase peak-hour capacity on the line. The six-car C Stock trains were replaced from 2012 to 2014 by new seven-car S Stock trains.

In 1863, the Metropolitan Railway, the world's first underground railway, opened in London between Paddington and Farringdon, connecting the Great Western Railway's relatively remote terminus at Paddington with Euston and King's Cross stations and the City, London's financial district. In the same year, a select committee report recommended an "inner circle" of railway lines connecting the London termini that had been built or were under construction. In the next year, the Metropolitan District Railway (commonly known as the District Railway) was formed to build and operate a railway from South Kensington to Tower Hill. The Metropolitan western extension from a new station at Paddington to South Kensington opened in 1868. By May 1870, the District Railway had opened its line from West Brompton to Blackfriars via Gloucester Road and South Kensington, services being operated at first by the Metropolitan. In 1871, the District had built a terminus at Mansion House, and on 18 November 1876 the Metropolitan opened its terminus at Aldgate. Because of the conflict between the two companies, it took an act of Parliament, the Metropolitan and District Railways (City Lines and Extensions) Act 1879 (42 & 43 Vict. c. cci) before further work was done on the inner circle. In 1882, the Metropolitan extended its line from Aldgate to a temporary station at Tower Hill and the District completed its line to Whitechapel. On 6 October 1884, the temporary station was replaced with a joint station and the inner circle was complete. The Metropolitan provided the clockwise, or "outer rail", trains; the District the "inner rail", or anti-clockwise. Many breakdowns occurred, due to the unbalanced wear-and-tear inflicted upon the train and carriages caused by travelling in a single circular direction. Equally, services were further disrupted due to petty squabbles between the two rivals including an incident whereby the Metropolitan Railway forcibly removed (using three trains) the District Railway's parked carriages which had been chained to the track.

As well as the inner circle, other routes circumnavigated London, although these were not complete loops. From 1872, the L&NWR began an "outer circle" service from Broad Street to Mansion House via Willesden Junction and Earl's Court, diverting an earlier service that had run to Victoria; and the GWR began a "middle circle" service from Moorgate to Mansion House via Latimer Road and Earl's Court. Both of these routes were cut back to Earl's Court: the "middle circle" in 1900 and the "outer circle" in 1909. The GWR service survived as a shuttle service from the Hammersmith & City line to Addison Road, now Kensington (Olympia), until 1940.

The Midland Railway briefly ran a super outer circle from St Pancras to Earl's Court from 1878 to 1880. London Overground now runs services between Clapham Junction, Willesden Junction and Dalston Junction and between Dalston Junction and Clapham Junction.

Wooden carriages were originally hauled by steam locomotives leading to smoke-filled stations and carriages, unpopular with passengers. At the start of the 20th century, the District and Metropolitan were seeing increased competition in central London from the new electric underground tube lines and trams, and conversion to electric traction was seen as the way forward. Experiments were carried out on the Earl's Court to High Street Kensington section, and a jointly owned six-carriage train began passenger service in 1900. Following this, an AC system was suggested, and this was accepted by both parties. However, the District was looking for a way to raise the finance needed and in 1901 found an investor, the American Charles Yerkes. He formed the Underground Electric Railways of London (UERL), and his experience in the United States led him to favour DC, with third-rail pick-up similar to that in use on the City & South London Railway and Central London Railway. After arbitration by the Board of Trade, the DC system was taken up, and the railways began electrifying the routes, using multiple-unit stock.

See all
User Avatar
No comments yet.