The Elizabeth line is a railway line that runs across Greater London and nearby towns, operating similarly to the RER in Paris and the S-Bahn systems of German-speaking countries. It runs services on dedicated infrastructure in central London from the Great Western Main Line west of Paddington station to Abbey Wood and via Whitechapel to the Great Eastern Main Line near Stratford; along the Great Western Main Line to Reading and Heathrow Airport in the west; and along the Great Eastern Main Line to Shenfield in the east.

Under the project name of Crossrail, the system was approved in 2007, and construction began in 2009. Originally planned to open in 2018, the project was repeatedly delayed, including for several months as a result of the COVID-19 pandemic. The service is now named after Queen Elizabeth II, who officially opened the line on 17 May 2022 during her Platinum Jubilee year; passenger services started on 24 May 2022.

Elizabeth line services are operated by GTS Rail Operations under a concession from Transport for London (TfL). TfL considers the line to be a distinct service, rather than part of the London Underground. It is considered to be in a class of its own and TfL's Oyster card is not valid for journeys to stations outside the TfL fare zones, whilst a premium fare is charged to passengers travelling to or from Heathrow Airport, in line with that charged on the Heathrow Connect service which it replaced.

The line reached over 200 million trips annually in its second year of operation and carries one seventh of all trips by rail in the United Kingdom.

In 2001, Cross London Rail Links (CLRL), a 50/50 joint-venture between Transport for London (TfL) and the Department for Transport (DfT), was formed to develop and promote the Crossrail scheme, and also a Wimbledon–Hackney scheme, Crossrail 2. In 2003 and 2004, over 50 days of exhibitions were held to explain the proposals at over 30 different locations.[non-primary source needed]

In 2005, ahead of Crossrail's hybrid bill submission, a number of feeder routes were considered by CLRL west of Paddington and east of Liverpool Street. It was viewed, given the 24 trains-per-hour (tph) core frequency, that two feeder routes, each of 12 tph, could be taken forward.

In the west, a route to Maidenhead (later extended to Reading) and Heathrow Airport was selected. In the east, routes to Abbey Wood (curtailed from Ebbsfleet to avoid conflicts with the North Kent lines) and Shenfield were selected.

The Crossrail Act 2008 authorising the construction project received royal assent on 22 July 2008. In December 2008, TfL and the DfT announced that they had signed the "Crossrail Sponsors' Agreement". This committed them to financing the project, then projected to cost £15.9 billion, with further contributions from Network Rail, BAA, and the City of London.