Hubbry Logo
logo
Ffestiniog Railway
Community hub

Ffestiniog Railway

logo
0 subscribers
Be the first to start a discussion here.
Be the first to start a discussion here.
Contribute something to knowledge base
Hub AI

Ffestiniog Railway AI simulator

(@Ffestiniog Railway_simulator)

Ffestiniog Railway

The Ffestiniog Railway (Welsh: Rheilffordd Ffestiniog) is a heritage railway based on 1 ft 11+12 in (597 mm) narrow-gauge, in Gwynedd, Wales. It is a major tourist attraction located mainly within the Snowdonia National Park.

The railway is about 13+12 miles (21.7 km) long and runs from the harbour at Porthmadog to the slate mining town of Blaenau Ffestiniog, travelling through forested and mountainous terrain. The line is single track throughout with four intermediate passing places. The first mile of the line out of Porthmadog runs atop an embankment called the Cob, which is the dyke of the polder known as Traeth Mawr.

The Festiniog Railway Company, which owns the railway, is the oldest surviving railway company in the world. It also owns the Welsh Highland Railway, which was re-opened fully in 2011. The two railways share the same track gauge and meet at Porthmadog station, with occasional trains working the entire 40-mile (64 km) route from Blaenau Ffestiniog to Caernarfon.

The railway company is properly known as the "Festiniog Railway Company". The single F spelling is in the official title of the company in the local act, the Festiniog Railway Act 1832 (2 & 3 Will. 4. c. xlviii), that created the railway. It is the oldest surviving railway company in the world (although not the oldest working railway – a record that goes to the Middleton Railway, in Leeds), having been founded by the act of Parliament on 23 May 1832 with capital mostly raised in Dublin by Henry Archer, the company's first secretary and managing director. Most British railways were amalgamated into four large groups in 1921 and then into British Railways in 1948 but the Festiniog Railway Company, like most narrow-gauge railways, remained independent. In 1921, this was due to political influence, whereas in 1947 it was left out of British Railways because it was closed for traffic, despite vigorous local lobbying for it to be included.

Various important developments in the railway's early history were celebrated by the firing of rock cannon at various points along the line. Cannon were fired, for instance, to mark the laying of the first stone at Creuau in 1833, the railway's opening in 1836, and the opening of the Moelwyn Tunnel in 1842. The passing of the later Festiniog Railway Act 1869 (32 & 33 Vict. c. cxli) for the railway also saw cannon celebrations, but on this occasion, a fitter at Boston Lodge, who was assisting with firing, lost the fingers of one hand in an accident.

The line was constructed between 1833 and 1836 to transport slate from the quarries around the inland town of Blaenau Ffestiniog to the coastal town of Porthmadog where it was loaded onto ships. The railway was graded so that loaded wagons could be run by gravity downhill all the way from Blaenau Ffestiniog to the port. The empty wagons were hauled back up by horses, which travelled down in special 'dandy' wagons. To achieve this continuous grade (about 1 in 80 for much of the way), the line followed natural contours and employed cuttings and embankments built of stone and slate blocks without mortar. Prior to the completion in 1842 of a long tunnel through a spur in the Moelwyn Mountain, the slate trains were worked over the top via inclines (designed by Robert Stephenson), the site of which can still be seen although there are few visible remnants.

Up to six trains daily were operated in each direction and a printed timetable was published on 16 September 1856 by Charles Easton Spooner who, following his father, served as Manager and Clerk for 30 years. It shows departures from the Quarry Terminus (later referred to as Dinas, sometimes as Rhiwbryfdir or Rhiw) at 7:30, 9:28, 11:16, 1:14, 3:12 and 5:10. Trains waited ten minutes at the intermediate stations called Tunnel Halt, Hafod y Llyn and Rhiw Goch. The fastest journey time from Quarry Terminus to Boston Lodge was 1 hour 32 minutes, including three stops. From Boston Lodge, the slate wagons were hauled to and from Porthmadog harbour by horses. Up trains took nearly six hours from Boston Lodge to the Quarry Terminus and each train ran in up to four sections, each hauled by a horse and comprising eight empty slate wagons plus a horse dandy. This timetable gave a maximum annual capacity of 70,000 tons of dressed slate. Two brakesmen travelled on each down train, controlling the speed by the application of brakes as needed. At passing loops, trains passed on the right and this continues to be a feature of Ffestiniog Railway operation.

There is evidence for tourist passengers being carried as early as 1850 without the blessing of the Board of Trade, but these journeys would also observe the timetable.

See all
Heritage narrow gauge railway in Wales, United Kingdom
User Avatar
No comments yet.