Hastings line
The Hastings line is a secondary railway line in Kent and East Sussex, England, linking Hastings with the main town of Tunbridge Wells, and London via Tonbridge and Sevenoaks. Although primarily carrying passengers, the railway also serves a gypsum mine which is a source of freight traffic. Southeastern Trains operates passenger trains on the line, and it is one of their busiest lines.
The railway was constructed by the South Eastern Railway in the early 1850s across the difficult terrain of the High Weald. Supervision of the building of the line was lax, enabling contractors to skimp on the lining of the tunnels. These deficiencies showed up after the railway had opened. Rectifications led to a restricted loading gauge along the line, requiring the use of dedicated rolling stock.
Served by steam locomotives from opening until the late 1950s, passenger services were then taken over by a fleet of diesel-electric multiple units built to the line's loading gauge. Diesel locomotives handled freight, also built to fit the loading gauge. The diesel-electric multiple units served on the line until 1986, when the line was electrified and the most severely affected tunnels were reduced from double track to single.
The South Eastern Railway (SER) completed its main line from London to Dover, Kent in 1844, branching off the rival London, Brighton and South Coast Railway's (LBSC) line at Redhill. Construction of a single line branch from Tunbridge (modern spelling "Tonbridge"[Note 2]) to Tunbridge Wells, a fashionable town where a chalybeate spring had been discovered in 1606, began in July 1844. At the time, Parliament had not given assent for the railway. The Act of Parliament (South-Eastern Railway (Tunbridge to Tunbridge Wells) Act) enabling the construction of the line had its first reading in the House of Commons on 28 April 1845. The bill completed its passage through the House of Commons and the House of Lords on 28 July, following which royal assent was granted on 31 July by Queen Victoria.
The engineer in charge of the construction was Peter W. Barlow and the contractors were Messrs. Hoof & Son. In April 1845 the SER decided that the branch would be double track. A 410-yard-long (370 m) tunnel was required 44 chains (890 m) after leaving Tunbridge. This was named "Somerhill Tunnel" after the nearby mansion. A mile and 54 chains (2.70 km) after leaving Somerhill Tunnel, a 270-yard-long (250 m) viaduct was required. Southborough Viaduct stands 40 feet (12 m) high and has 26 arches. A temporary station was built at Tunbridge Wells as the 823 yd (753 m) Wells Tunnel was still under construction. It was 4 miles 7 chains (4.09 mi; 6.58 km) from Tunbridge. The temporary station subsequently became a goods station. The first train, comprising four locomotives and 26 carriages, arrived at Tunbridge Wells on 19 September. Trains from Tunbridge had to reverse before starting the climb to Somerhill Tunnel, as there was no facing junction at Tunbridge. This situation was to remain until 1857, when a direct link was built at a cost of £5,700. The old link remained in use until c. 1913.
The SER was granted permission to build a line from Ashford in Kent to St Leonards, East Sussex in 1845. The LBSC reached St Leonards from Lewes the following year. This gave the LBSC a shorter route to Hastings than the SERs route, then still under construction. The SER sought permission to extend their branch from Tunbridge Wells across the High Weald to reach Hastings. Authorisation for the construction of a 25-mile-60-chain (25.75 mi; 41.44 km) line to Hastings was obtained on 18 June 1846, Parliament deemed the line between Ashford and St Leonards to be of military strategic importance. Therefore, they stipulated that this line was to be completed before any extension was built from Tunbridge Wells. The extension into Tunbridge Wells opened on 25 November 1846 without any public ceremony. In 1847, the SER unsuccessfully challenged the condition that the line between Ashford and St Leonards be completed first. That line was opened in 1851, passing through Hastings and making an end-on junction with the LBSC line from Lewes.
The Hastings line is built over the difficult, forested, and hilly terrain across the High Weald and sandstone Hastings Beds, necessitating the construction of eight tunnels between Tonbridge and the south coast seaside resort of Hastings. The SER was anxious to construct the line as economically as possible, since it was in competition with the LBSC to obtain entry into Hastings and was not in a strong financial position in the mid-1840s.
The construction of the line between Tunbridge Wells and Robertsbridge was contracted to Messrs. Hoof & Wyths, subcontracted to Messrs. H. Warden. By March 1851, the trackbed had been constructed as far as Whatlington, East Sussex, a distance of 19 miles (30.58 km). All tunnels had been completed and a single line of railway had been laid for a distance of 10 miles 40 chains (10.50 mi; 16.90 km) from Tunbridge Wells. When the 15-mile-40-chain (15.50 mi; 24.94 km) section from Tunbridge Wells to Robertsbridge opened on 1 September, a single line of track extended a further 4 miles (6.44 km) to Whatlington. On the 6-mile (9.66 km) section between Whatlington and St Leonards, 750,000 cubic yards (570,000 m3) out of 827,000 cubic yards (632,000 m3) had been excavated. Construction of the line between Tunbridge Wells and Bopeep Junction cost in excess of £500,000.
Hastings line
The Hastings line is a secondary railway line in Kent and East Sussex, England, linking Hastings with the main town of Tunbridge Wells, and London via Tonbridge and Sevenoaks. Although primarily carrying passengers, the railway also serves a gypsum mine which is a source of freight traffic. Southeastern Trains operates passenger trains on the line, and it is one of their busiest lines.
The railway was constructed by the South Eastern Railway in the early 1850s across the difficult terrain of the High Weald. Supervision of the building of the line was lax, enabling contractors to skimp on the lining of the tunnels. These deficiencies showed up after the railway had opened. Rectifications led to a restricted loading gauge along the line, requiring the use of dedicated rolling stock.
Served by steam locomotives from opening until the late 1950s, passenger services were then taken over by a fleet of diesel-electric multiple units built to the line's loading gauge. Diesel locomotives handled freight, also built to fit the loading gauge. The diesel-electric multiple units served on the line until 1986, when the line was electrified and the most severely affected tunnels were reduced from double track to single.
The South Eastern Railway (SER) completed its main line from London to Dover, Kent in 1844, branching off the rival London, Brighton and South Coast Railway's (LBSC) line at Redhill. Construction of a single line branch from Tunbridge (modern spelling "Tonbridge"[Note 2]) to Tunbridge Wells, a fashionable town where a chalybeate spring had been discovered in 1606, began in July 1844. At the time, Parliament had not given assent for the railway. The Act of Parliament (South-Eastern Railway (Tunbridge to Tunbridge Wells) Act) enabling the construction of the line had its first reading in the House of Commons on 28 April 1845. The bill completed its passage through the House of Commons and the House of Lords on 28 July, following which royal assent was granted on 31 July by Queen Victoria.
The engineer in charge of the construction was Peter W. Barlow and the contractors were Messrs. Hoof & Son. In April 1845 the SER decided that the branch would be double track. A 410-yard-long (370 m) tunnel was required 44 chains (890 m) after leaving Tunbridge. This was named "Somerhill Tunnel" after the nearby mansion. A mile and 54 chains (2.70 km) after leaving Somerhill Tunnel, a 270-yard-long (250 m) viaduct was required. Southborough Viaduct stands 40 feet (12 m) high and has 26 arches. A temporary station was built at Tunbridge Wells as the 823 yd (753 m) Wells Tunnel was still under construction. It was 4 miles 7 chains (4.09 mi; 6.58 km) from Tunbridge. The temporary station subsequently became a goods station. The first train, comprising four locomotives and 26 carriages, arrived at Tunbridge Wells on 19 September. Trains from Tunbridge had to reverse before starting the climb to Somerhill Tunnel, as there was no facing junction at Tunbridge. This situation was to remain until 1857, when a direct link was built at a cost of £5,700. The old link remained in use until c. 1913.
The SER was granted permission to build a line from Ashford in Kent to St Leonards, East Sussex in 1845. The LBSC reached St Leonards from Lewes the following year. This gave the LBSC a shorter route to Hastings than the SERs route, then still under construction. The SER sought permission to extend their branch from Tunbridge Wells across the High Weald to reach Hastings. Authorisation for the construction of a 25-mile-60-chain (25.75 mi; 41.44 km) line to Hastings was obtained on 18 June 1846, Parliament deemed the line between Ashford and St Leonards to be of military strategic importance. Therefore, they stipulated that this line was to be completed before any extension was built from Tunbridge Wells. The extension into Tunbridge Wells opened on 25 November 1846 without any public ceremony. In 1847, the SER unsuccessfully challenged the condition that the line between Ashford and St Leonards be completed first. That line was opened in 1851, passing through Hastings and making an end-on junction with the LBSC line from Lewes.
The Hastings line is built over the difficult, forested, and hilly terrain across the High Weald and sandstone Hastings Beds, necessitating the construction of eight tunnels between Tonbridge and the south coast seaside resort of Hastings. The SER was anxious to construct the line as economically as possible, since it was in competition with the LBSC to obtain entry into Hastings and was not in a strong financial position in the mid-1840s.
The construction of the line between Tunbridge Wells and Robertsbridge was contracted to Messrs. Hoof & Wyths, subcontracted to Messrs. H. Warden. By March 1851, the trackbed had been constructed as far as Whatlington, East Sussex, a distance of 19 miles (30.58 km). All tunnels had been completed and a single line of railway had been laid for a distance of 10 miles 40 chains (10.50 mi; 16.90 km) from Tunbridge Wells. When the 15-mile-40-chain (15.50 mi; 24.94 km) section from Tunbridge Wells to Robertsbridge opened on 1 September, a single line of track extended a further 4 miles (6.44 km) to Whatlington. On the 6-mile (9.66 km) section between Whatlington and St Leonards, 750,000 cubic yards (570,000 m3) out of 827,000 cubic yards (632,000 m3) had been excavated. Construction of the line between Tunbridge Wells and Bopeep Junction cost in excess of £500,000.