Hubbry Logo
Integral (train)Integral (train)Main
Open search
Integral (train)
Community hub
Integral (train)
logo
8 pages, 0 posts
0 subscribers
Be the first to start a discussion here.
Be the first to start a discussion here.
Integral (train)
from Wikipedia
Integral
Integral set VT 104 at München Hauptbahnhof in November 2018
In serviceNovember 1998 – July 2020
December 2020 – present
ManufacturerJenbacher Werke
Number built17 sets
Formation5 sections per trainset
OperatorsBayerische Oberlandbahn (-2020)
Regiobahn GmbH (2020-)
Specifications
Prime mover(s)Diesel-hydraulic
Bogies6 single wheelsets
Track gauge1,435 mm (4 ft 8+12 in)

The Integral is a diesel multiple unit (DMU) train type operated by Regiobahn GmbH on commuter services in North Rhine-Westphalia. Between 1998 and 2020, they were operated by the Bayerische Oberlandbahn on regional services between Munich, Bayrischzell, Lenggries and Tegernsee. They were built by the now defunct Jenbacher Werke.[1]

Formation

[edit]
Interior view

Each Integral unit consists of five sections, formed as shown in table below.[2] The two "FGZ" sections are suspended between the end- and intermediate cars.[2]

Car Endwagen 2
end car 2
Fahrgastzelle
passenger section
Mittelwagen
intermediate car
Fahrgastzelle
passenger section
Endwagen 1
end car 1
Designation EW2 FGZ MW FGZ EW1
Equipment Diesel-hydraulic motor Two unpowered wheelsets Diesel-hydraulic motor
Wheelsets 2 none 2 none 2

Technical specifications

[edit]

The trains are powered by diesel-hydraulic motors.[2] One end car has all wheelsets powered, the other end car has only one powered wheelset. All six wheelsets use active radial steering.[2] The trains are able to run in multiple unit formation.[3]

History

[edit]

The trains entered service in November 1998.[3] Following problems and malfunctions, the fleet was returned to its manufacturer in Jenbach, and was overhauled, which increased their reliability.[4]

One unit was used at the Test- and Validationcenter Wegberg-Wildenrath for testing of an anti-collision system by the Deutsches Zentrum für Luft- und Raumfahrt (DLR).[5]

The Integral trains were withdrawn by Bayerische Oberlandbahn after their last day of service on July 25, 2020, being replaced by LINT 54 units.[6]

After their withdrawal from service in Bavaria, Integral trains were transferred to the Regiobahn GmbH in North Rhine-Westphalia, where they entered service on VRR S-Bahn line S28 in December 2020.[7]

References

[edit]
[edit]
Revisions and contributorsEdit on WikipediaRead on Wikipedia
Add your contribution
Related Hubs
User Avatar
No comments yet.