Recent from talks
Lynx Silver Line
Knowledge base stats:
Talk channels stats:
Members stats:
Lynx Silver Line
The Lynx Silver Line is a proposed east–west light rail line in Charlotte, North Carolina. The Silver Line would connect the outlying cities and towns of Belmont, Matthews, Stallings and Indian Trail to Uptown Charlotte and the Charlotte Douglas International Airport. In the refined locally preferred alternative (LPA), released in early 2021, the route is estimated to be around 29 miles (47 km), with 29 stations and one maintenance facility.
The proposed light rail route was a merger of two earlier projects known as the Southeast Corridor, a proposed light rail line between Uptown Charlotte and CPCC Levine Campus in Matthews, and the West Corridor, a proposed streetcar line between Charlotte-Douglas International Airport and Uptown Charlotte.
The prospect of developing a light rail line between Matthews and Uptown along Independence Boulevard was initially evaluated in 1985. By 1997, the Charlotte City Council voted, at the recommendation of an independent transit panel, for the development of a busway in the median of Independence in lieu of light rail. The decision to develop a busway over light rail was based on overall costs of $126 million for a busway versus $300 million for light-rail. However, by 1999 delays in the construction of the busway resulted in a renewed grassroots effort of rail advocates to have light rail placed along Independence. As a result of this campaign, Representative Robin Hayes, who served as a member of the House Transportation Committee, to design the busway in such a manner as to be adapted for light rail when it can be economically justified. In 2002, the Metropolitan Transit Commission (MTC) recommended that the Independence corridor see the construction, but that as part of the initial engineering studies, light rail accommodation be considered.
By 2006, a study released by the Charlotte Area Transit System indicated that the cost of light rail along the corridor would be roughly double that of a busway and have fewer riders. The estimates stated light rail on Independence would be 12.7 miles (20.4 km) in length at a cost of $585 million, with a projected ridership of 14,400 in 2030; and stated a busway would be 13.5 miles (21.7 km) in length at a cost of $315 to $325 million, with a projected ridership of 16,000 in 2030. In September, the MTC voted to delay on determining whether a busway or light rail should be built along the corridor until 2011.
By October 2012, the MTC had voted in favor of a busway on interior lanes of the highway. However, in May 2013, a 30-member funding task force suggested a light rail line instead, at an estimated cost of $1.7 billion. The 2006 study had estimated the line would be 13.5 miles (21.7 km) and be complete through Idlewild Road by 2022, to Sardis Road North by 2024 and finally to CPCC Levine by 2026. Additionally, the line would contain 3,350 parking spaces and 16 stations along the corridor at a cost of $582 million.
In September 2016, after three years of further studies and consultations with area residents, CATS settled on light rail as the most viable option for the Silver Line. At the time, however, CATS lacked any further sources of funding to invest in future projects. John Lewis, the system's CEO, said he would wait for the Blue Line Extension to begin service in August 2017 before resuming discussions on how best to fund the new lines. A possible option could be to have neighboring counties contribute towards project costs. The Silver Line would come within less than a mile of the Union County border at the CPCC Levine Station. Lynx Silver Line will have 13 stations with about 10 having park-and-ride lots.
In January 2019, CATS announced that the Silver Line would cross from Independence Boulevard over to 11th Street, run parallel to I-277 to North Graham Street, then turn south to link to the planned Gateway Station and continuation along the West Corridor.
The West Corridor was proposed as a streetcar line to serve as an extension for the LYNX network in Charlotte, North Carolina, initially slated for completion by 2034. It would connect Charlotte-Douglas International Airport in west Charlotte with the Charlotte Transportation Center in Uptown Charlotte. It was to follow a primarily east–west path along West Morehead Street and Wilkinson Boulevard, through west Charlotte. The first phase was estimated to be 6.4 miles (10.3 km) with 10 stops. It was to be completed between Uptown and Ashley Road by 2029 at a cost of $163 million. The second phase between Ashley Road and the Charlotte-Douglas International Airport was scheduled for completion by 2034 at a cost of $324 million.
Hub AI
Lynx Silver Line AI simulator
(@Lynx Silver Line_simulator)
Lynx Silver Line
The Lynx Silver Line is a proposed east–west light rail line in Charlotte, North Carolina. The Silver Line would connect the outlying cities and towns of Belmont, Matthews, Stallings and Indian Trail to Uptown Charlotte and the Charlotte Douglas International Airport. In the refined locally preferred alternative (LPA), released in early 2021, the route is estimated to be around 29 miles (47 km), with 29 stations and one maintenance facility.
The proposed light rail route was a merger of two earlier projects known as the Southeast Corridor, a proposed light rail line between Uptown Charlotte and CPCC Levine Campus in Matthews, and the West Corridor, a proposed streetcar line between Charlotte-Douglas International Airport and Uptown Charlotte.
The prospect of developing a light rail line between Matthews and Uptown along Independence Boulevard was initially evaluated in 1985. By 1997, the Charlotte City Council voted, at the recommendation of an independent transit panel, for the development of a busway in the median of Independence in lieu of light rail. The decision to develop a busway over light rail was based on overall costs of $126 million for a busway versus $300 million for light-rail. However, by 1999 delays in the construction of the busway resulted in a renewed grassroots effort of rail advocates to have light rail placed along Independence. As a result of this campaign, Representative Robin Hayes, who served as a member of the House Transportation Committee, to design the busway in such a manner as to be adapted for light rail when it can be economically justified. In 2002, the Metropolitan Transit Commission (MTC) recommended that the Independence corridor see the construction, but that as part of the initial engineering studies, light rail accommodation be considered.
By 2006, a study released by the Charlotte Area Transit System indicated that the cost of light rail along the corridor would be roughly double that of a busway and have fewer riders. The estimates stated light rail on Independence would be 12.7 miles (20.4 km) in length at a cost of $585 million, with a projected ridership of 14,400 in 2030; and stated a busway would be 13.5 miles (21.7 km) in length at a cost of $315 to $325 million, with a projected ridership of 16,000 in 2030. In September, the MTC voted to delay on determining whether a busway or light rail should be built along the corridor until 2011.
By October 2012, the MTC had voted in favor of a busway on interior lanes of the highway. However, in May 2013, a 30-member funding task force suggested a light rail line instead, at an estimated cost of $1.7 billion. The 2006 study had estimated the line would be 13.5 miles (21.7 km) and be complete through Idlewild Road by 2022, to Sardis Road North by 2024 and finally to CPCC Levine by 2026. Additionally, the line would contain 3,350 parking spaces and 16 stations along the corridor at a cost of $582 million.
In September 2016, after three years of further studies and consultations with area residents, CATS settled on light rail as the most viable option for the Silver Line. At the time, however, CATS lacked any further sources of funding to invest in future projects. John Lewis, the system's CEO, said he would wait for the Blue Line Extension to begin service in August 2017 before resuming discussions on how best to fund the new lines. A possible option could be to have neighboring counties contribute towards project costs. The Silver Line would come within less than a mile of the Union County border at the CPCC Levine Station. Lynx Silver Line will have 13 stations with about 10 having park-and-ride lots.
In January 2019, CATS announced that the Silver Line would cross from Independence Boulevard over to 11th Street, run parallel to I-277 to North Graham Street, then turn south to link to the planned Gateway Station and continuation along the West Corridor.
The West Corridor was proposed as a streetcar line to serve as an extension for the LYNX network in Charlotte, North Carolina, initially slated for completion by 2034. It would connect Charlotte-Douglas International Airport in west Charlotte with the Charlotte Transportation Center in Uptown Charlotte. It was to follow a primarily east–west path along West Morehead Street and Wilkinson Boulevard, through west Charlotte. The first phase was estimated to be 6.4 miles (10.3 km) with 10 stops. It was to be completed between Uptown and Ashley Road by 2029 at a cost of $163 million. The second phase between Ashley Road and the Charlotte-Douglas International Airport was scheduled for completion by 2034 at a cost of $324 million.