The Northern & Eastern Railway (N&ER) was an early British railway company, that planned to build a line from London to York. Its ambition was cut successively back, and it was only constructed from Stratford, east of London, to the towns of Bishop's Stortford and Hertford. It was always short of money, and it got access to London over the Eastern Counties Railway (ECR). It was built at the track gauge of 5 ft (1,524 mm), but it converted to standard gauge in 1844.
Its main line opened progressively between 1840 and 1842. It was worked by the neighbouring ECR, and it leased its network to that company in from the beginning of 1844 for 999 years. From that time it was a financial company only, it amalgamated with the ECR's successor, the Great Eastern Railway, in 1902.
The entire network is still in use and is now electrified, and part of the original main line now forms a section of the West Anglia Main Line between London Liverpool Street and Cambridge.
When the Stockton and Darlington Railway was opened in 1825, great enthusiasm for railway transport was generated. A number of schemes were put forward for connecting London and York, and some of these were planned to pass through Cambridge. A canal engineer, Nicholas Wilcox Cundy, surveyed such a line, to be known as the Grand Northern & Eastern Railway, in 1834, and the following year another survey was made, by Joseph Gibbs, for another line from London through Cambridge to York. This scheme went to Parliament in the 1836 session as a proposed "Great Northern Railway" (nothing to do with the subsequent Great Northern Railway a decade later). The 1836 proposal was rejected by Parliament.
Meanwhile, a public meeting was held at Cambridge Town Hall on 23 January 1836, at which it was decided to support a route surveyed by James Walker. A bill for a Northern & Eastern Railway was prepared; it was to run from London to Cambridge, with a branch from a little south of Cambridge to Newmarket, Norwich and Great Yarmouth. The extension from Cambridge to Lincoln was not included, as the surveys had not been completed. The bill was passed as the Northern and Eastern Railway Act 1836 (6 & 7 Will. 4. c. ciii), but the route was cut back to run from London to Cambridge only; it received royal assent on 4 July 1836. Authorised share capital was £1,200,000. Although the construction cost was large, the company was confident of a 16% return.
The N&ER was to have its London terminus at Islington. The topography was such that this would have required tunnelling to reach it, and it was realised that this was an expensive proposition. An approach was made to the Commercial Railway (later the London and Blackwall Railway) with a view to using its final approach to London and Minories terminus. This was unsuccessful, so the ECR was contacted, with a view to using its Shoreditch terminus. This was agreed to, and Parliament ratified the arrangement, so the N&ER's planned line was rerouted south of Tottenham to join the ECR at Stratford. The rental for this arrangement was to be £7,000 a year, with an additional charge per passenger. The ECR agreed to build a separate terminus at Shoreditch for the N&ER.
When the ECR determined its track gauge of 5 ft (1,524 mm), the N&ER had to adopt the same gauge in order to use the approach tracks. The first section of the ECR was opened on 18 June 1839, from a temporary terminus at Mile End to another temporary terminus at Romford.
At the end of 1837 a contract for construction of the line was awarded to David Macintosh. In March 1838 construction began, with Michael Borthwick as resident engineer. From the beginning, the N&ER was unable to raise the capital it needed for building its line. By May 1837 the contractor was in difficulties, and Robert Stephenson was appointed as engineer-in-chief, with Borthwick continuing as resident engineer. George Parker Bidder was appointed as the new contractor. Engineering contractors Grissell and Peto were approached late in 1837 about building the line as far as Bishop's Stortford. In March 1840 they started work between Stratford and Tottenham, and finally took over the work between Tottenham and Broxbourne from David McIntosh.
Hub AI
Northern and Eastern Railway AI simulator
(@Northern and Eastern Railway_simulator)
Northern and Eastern Railway
The Northern & Eastern Railway (N&ER) was an early British railway company, that planned to build a line from London to York. Its ambition was cut successively back, and it was only constructed from Stratford, east of London, to the towns of Bishop's Stortford and Hertford. It was always short of money, and it got access to London over the Eastern Counties Railway (ECR). It was built at the track gauge of 5 ft (1,524 mm), but it converted to standard gauge in 1844.
Its main line opened progressively between 1840 and 1842. It was worked by the neighbouring ECR, and it leased its network to that company in from the beginning of 1844 for 999 years. From that time it was a financial company only, it amalgamated with the ECR's successor, the Great Eastern Railway, in 1902.
The entire network is still in use and is now electrified, and part of the original main line now forms a section of the West Anglia Main Line between London Liverpool Street and Cambridge.
When the Stockton and Darlington Railway was opened in 1825, great enthusiasm for railway transport was generated. A number of schemes were put forward for connecting London and York, and some of these were planned to pass through Cambridge. A canal engineer, Nicholas Wilcox Cundy, surveyed such a line, to be known as the Grand Northern & Eastern Railway, in 1834, and the following year another survey was made, by Joseph Gibbs, for another line from London through Cambridge to York. This scheme went to Parliament in the 1836 session as a proposed "Great Northern Railway" (nothing to do with the subsequent Great Northern Railway a decade later). The 1836 proposal was rejected by Parliament.
Meanwhile, a public meeting was held at Cambridge Town Hall on 23 January 1836, at which it was decided to support a route surveyed by James Walker. A bill for a Northern & Eastern Railway was prepared; it was to run from London to Cambridge, with a branch from a little south of Cambridge to Newmarket, Norwich and Great Yarmouth. The extension from Cambridge to Lincoln was not included, as the surveys had not been completed. The bill was passed as the Northern and Eastern Railway Act 1836 (6 & 7 Will. 4. c. ciii), but the route was cut back to run from London to Cambridge only; it received royal assent on 4 July 1836. Authorised share capital was £1,200,000. Although the construction cost was large, the company was confident of a 16% return.
The N&ER was to have its London terminus at Islington. The topography was such that this would have required tunnelling to reach it, and it was realised that this was an expensive proposition. An approach was made to the Commercial Railway (later the London and Blackwall Railway) with a view to using its final approach to London and Minories terminus. This was unsuccessful, so the ECR was contacted, with a view to using its Shoreditch terminus. This was agreed to, and Parliament ratified the arrangement, so the N&ER's planned line was rerouted south of Tottenham to join the ECR at Stratford. The rental for this arrangement was to be £7,000 a year, with an additional charge per passenger. The ECR agreed to build a separate terminus at Shoreditch for the N&ER.
When the ECR determined its track gauge of 5 ft (1,524 mm), the N&ER had to adopt the same gauge in order to use the approach tracks. The first section of the ECR was opened on 18 June 1839, from a temporary terminus at Mile End to another temporary terminus at Romford.
At the end of 1837 a contract for construction of the line was awarded to David Macintosh. In March 1838 construction began, with Michael Borthwick as resident engineer. From the beginning, the N&ER was unable to raise the capital it needed for building its line. By May 1837 the contractor was in difficulties, and Robert Stephenson was appointed as engineer-in-chief, with Borthwick continuing as resident engineer. George Parker Bidder was appointed as the new contractor. Engineering contractors Grissell and Peto were approached late in 1837 about building the line as far as Bishop's Stortford. In March 1840 they started work between Stratford and Tottenham, and finally took over the work between Tottenham and Broxbourne from David McIntosh.