Pioneer Zephyr
Pioneer Zephyr
Main page
2057406

Pioneer Zephyr

logo
Community Hub0 subscribers
What are your thoughts?
Be the first to start a discussion here.
Be the first to start a discussion here.
Pioneer Zephyr

The Pioneer Zephyr is a diesel-powered trainset built by the Budd Company in 1934 for the Chicago, Burlington & Quincy Railroad (CB&Q), commonly known as the Burlington Route. The trainset was the second internal-combustion–powered streamliner built for mainline service in the United States (after the Union Pacific Railroad's M-10000), the first such train powered by a diesel engine, and the first to enter revenue service.

The trainset consists of one power/storage car, one baggage/RPO/buffet/coach car, and one coach/observation car. The cars are made of stainless steel, permanently articulated together with Jacobs bogies. The construction incorporated recent advances such as shotwelding (a specialized type of spot welding) to join the stainless steel, and unibody construction and articulation to reduce weight. It was the first of nine similarly built trainsets made for Burlington and its technologies were pivotal in the subsequent dieselization of passenger rail service.

Its operating economy, speed, and public appeal demonstrated the potential for diesel-electric-powered trains to revitalize and restore profitability to passenger rail service that had suffered a catastrophic loss of business with the Great Depression. Originally named the Burlington Zephyr during its demonstration period, it became the Pioneer Zephyr as Burlington expanded its fleet of Zephyr trainsets.

On May 26, 1934, it set a speed record for travel between Denver and Chicago when it made a 1,015.4-mile (1,633 km) non-stop "Dawn-to-Dusk" dash in 13 hours 5 minutes at an average speed of almost 78 mph (124 km/h). For one section of the run, it reached a speed of 112.5 mph (181 km/h). The historic dash inspired a film ("The Silver Streak") and the train's nickname, "The Silver Streak".

The train entered regular revenue service on November 11, between Kansas City, Missouri; Omaha, Nebraska; and Lincoln, Nebraska. It operated this and other routes until its retirement in 1960, when it was donated to Chicago's Museum of Science & Industry, where it remains on public display. The train is generally regarded as the first successful streamliner on American railroads.

In the early 1930s, the Great Depression caused a catastrophic loss of business for American railroads. Passenger service had been losing ridership to automobile travel since the mid-1920s, making faster, more efficient service imperative for railroads to compete. Railroads needed to lower operating costs of passenger service and boost ridership with a more modern image for the traveling public, to restore profitability to passenger service.

One of the railroad presidents who faced this challenge was Ralph Budd, president of the Chicago, Burlington and Quincy Railroad (the Burlington Route). In 1932, Budd met Edward G. Budd (no relation), an automotive steel pioneer who was founder and president of the Budd Company and demonstrating his new Budd-Michelin rubber-tired rail cars built of stainless steel. Pneumatic-wheeled railcars never found popularity for actual service in the US — they tended to derail — but they demonstrated the successful construction of lightweight stainless steel unibody railcars. Some power-trailer car sets in that series articulated with Jacobs bogies shared between cars embodied the basic elements of car construction that would be used to build a lightweight streamliner train.

Stainless steel provided many benefits over traditional wood and hardened steel for railroad carbodies; it was a lighter and stronger material, and its natural silver appearance and resistance to corrosion meant that it would not have to be painted to protect it from the weather. Since the carbody was much lighter than similar cars, it would be able to carry a higher revenue load for the same cost.

See all
User Avatar
No comments yet.