Hubbry Logo
search
search button
Sign in
Historyarrow-down
starMorearrow-down
Welcome to the community hub built on top of the Raptisagar Express Wikipedia article. Here, you can discuss, collect, and organize anything related to Raptisagar Express. The purpose of the hub is to connect people, foster deeper knowledge, and help improve the root Wikipedia article.
Add your contribution
Inside this hub
Raptisagar Express

Raptisagar Express /Kochuveli-Gorakhpur Express
Overview
First serviceJanuary 1, 1991; 34 years ago (1991-01-01) (extended to Thiruvananthapuram Central)[1]
Current operatorNorth Eastern Railway zone of Indian Railways
Route
TerminiThiruvananthapuram
Gorakhpur
Stops60
Distance travelled3,248 km (2,018 mi)
Average journey time57 hours 05 minutes
Service frequencyTri-weekly
Train number12511 / 12512
On-board services
Class(es)First AC, 2 Tier AC, 3 Tier AC, Sleeper Class, General
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesAvailable
Observation facilitiesLarge windows
Baggage facilitiesAvailable
Technical
Rolling stockLoco: WAP-4/WAP-7
Track gauge1,676 mm (5 ft 6 in)
Operating speedAverage: 55 km/h Maximum speed: 110 km/h
Route map
Raptisagar Express /Ernakulam-Barauni Express
Overview
Current operatorEast Central Railway zone of Indian Railways
Route
TerminiErnakulam Junction
Barauni
Stops63
Distance travelled3,436 km (2,135 mi)
Average journey time47 hours
Service frequencyWeekly
Train number12521 / 12522
On-board services
Class(es)First AC, AC 2 tier, AC 3 tier, AC 3 tier economy, Sleeper class, General
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesAvailable
Observation facilitiesLarge windows
Baggage facilitiesAvailable
Technical
Rolling stockLoco: WAP-7
Track gauge1,676 mm (5 ft 6 in)

The Raptisagar Express trains are currently two sets of Express trains which run tri-weekly/weekly between Kochuveli/Ernakulam Junction and Gorakhpur/Barauni in India. It was inaugurated as 5012/5011 Gorakhpur - Cochin Harbour Terminus - Gorakhpur RaptiSagar Express running on 4 days while a Bi-weekly service was going to Hyderabad as 5090/5089 Gorakhpur - Hyderabad Express(now 12590/12589 Secunderabad - Gorakhpur - Secunderabad). Later, one day run of 5011/12 was extended to Barauni as 5222/5221(now 12522/12521 Ernakulam - Barauni - Ernakulam RaptiSagar Express)and one day run of 5090/89 was extended to Bangalore(Bengaluru) as 5092/5091(now 12592/12591 Yesvantpur - Gorakhpur - Yesvantpur Express). The train numbers were swapped when these trains were upgraded as Superfast and 12511/12512 was extended to Trivandrum is early 2000's. This train goes via the cities of Kollam, Alappuzha, Kochi, Thrissur, Palakkad, Coimbatore, Tirupur, Erode, Salem, Chennai Central, Vijayawada, Khammam, Warangal, Ramagundam, Nagpur, Bhopal, Jhansi, Kanpur, Lucknow, Gonda and Basti. The current operator of the train is North Eastern Railway zone/East Central Railway zone of Indian Railways. It is the 10th longest train service of Indian Railways.

Both trains run more than 3200 km per service.

Name of the train

[edit]

The name "Raptisagar" is given to the train as the train connects the cities Thiruvananthapuram/Cochin which is situated near the Arabian Sea and Gorakhpur/Barauni from where Rapti river flows.

Coach composition

[edit]

Both sets of trains have 22 coach cars which includes First AC, AC 2 tier, AC 3 tier, AC 3 tier economy (only on 12521/12522), Sleeper, General Sitting (Unreserved), and Pantry Car.

Schedule

[edit]

12511 – Starts from Gorakhpur Junction every Sunday, Tuesday and Friday at 6:35 hrs and reaches Kochuveli on Day 3 at 17:20 hrs.

12512 – Starts from Kochuveli every Sunday, Tuesday and Wednesday at 6:15 hrs and reaches Gorakhpur Junction on Day 3 at 15:20 hrs

12521 - Starts from Barauni every Monday at 22:51 hrs and reaches Ernakulam Junction on Day 3 at 11:30 hrs.

12522- Starts from Ernakulam Junction every Friday at 10:50 hrs and reaches Barauni on Day 3 at 00:05 hrs.

Both sets of trains reverse at MGR Chennai Central.

The trains have an average speed of about 58 km/h during its journey.

Rake composition of 12511[2]
LOCO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
LOCO SLR GEN GEN S4 S3 S2 S1 PC B1 B2 B3 B4 B5 B6 B7 B8 B9 A3 A2 A1 H1 EOG
Rake composition of 12521[3]
LOCO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
LOCO SLR H1 A1 A2 B1 B2 B3 B4 B5 B6 M1 PC S1 S2 S3 S4 S5 S6 GEN GEN GEN EOG

References

[edit]
Add your contribution
Related Hubs