Tidewater Oil Company (rendered as Tide Water Oil Company from 1887 to 1936) was a major vertically integrated oil company that operated independently from 1887 to 1926, when it was sold to a holding company. Over the decades, it passed through various corporate hands. It sold petroleum and gasoline products and fuel under various brand names, including Tydol, Flying A, and Veedol.
In 2011, Veedol was sold by British Petroleum to Tidewater India. Now it is part of Andrew Yule and Company's Indian group and manufactures automotive oil for the Indian market on the sub-continent of South Asia. Tidewater does not have its own refinery, so it is dependent on base oil suppliers like HPCL and BPCL. It also manufactures a wide range of automotive lubricants. Its corporate headquarters is in Los Angeles, California.
In November 1878, the Tide-Water Pipe Company was founded by Byron D. Benson (ca. 1828-February 1888), Robert E. Hopkins, and David McKelvy (died May 10, 1918). Other sources include as founders Samuel Q. Brown (died October 5, 1909) and Alanson Ashford Sumner.
The capital at incorporation was $625,000 of which $500,000 was paid in as cash and $125,000 represented the rights-of-way for the Seaboard Pipe Line which were eventually not used. The Reading Railroad Company subscribed to $250,000 of the stock.
Benson, Hopkins, and McKelvy had forged a deal with Franklin Gowen, president of the Reading Railroad, to build a pipeline from the new Bradford oil field at Coryville, Pennsylvania, eastward to Williamsport, where the oil would be loaded into Reading tank cars for transport to independent refiners in Philadelphia and New York. Gowen agreed to put up $250,000, half the predicted cost of building the pipeline.
The result was the world's first long-distance oil pipeline: 102.87 miles. The line included 6-inch, 18.5 pounds per linear foot wrought iron pipe joints, ordered from the Reading Iron Company, which began shipments on January 30, 1879, and the National Tube Works, which followed on February 12. Railroads delivered construction materials to 10 shipping points along the route. Laying of the pipe began near Oleona on February 22 and the last joints were put in place on May 22. The line rose 1,200 feet to cross the Allegheny Mountains near Waterville, then descended by gravity 2,100 feet. The cost of laying the line was 15.449 cents per foot, including freight (5.227), hauling (6.4) and joining (3.822). Through May 28, 1880, a total of 1,097,761.06 barrels (3,008 per day) was moved, of which 943,483.02 were transported to eastern refineries.
The pipeline could move 6,000 barrels per day. Starting at Pumping Station No. 1 at Coryville, oil flowed 22.43 miles to No. 2 station at Olmsted near Coudersport, then 80.44 miles to Williamsport. The pumping engines at Coryville began operation at 4 p.m. on May 28; oil arrived at 10:18 a.m. on May 30 at No. 2 station, which began to pump the same day at 3:20 p.m. After a pressure drop was detected, a piece of wood and some rope were removed from the pipe. Olmsted resumed pumping at 5 p.m. on June 2. Oil arrived at the tank farm 1.5 miles east of Williamsport at 7:20 p.m. on June 4. From there the loading station of the railroad could be reached by 12,700 feet of 8-inch gravity-flow pipe.
In 1880, the Equitable Pipe Line was absorbed, the Coryville pumping station was moved a few miles to Rixford and the 4-inch pipe was replaced by 6-inch pipe. The line was extended from Williamsport to Tamanend in the winter of 1881-82 and new pumping stations were built at County Line (No. 3 halfway between Olmsted and Williamsport), Muncy (No. 4 just southeast of Williamsport) and Shumans (No. 5). From Tamanend the New Jersey Central Railroad provided a direct route to New York bypassing Philadelphia in rail shipments. In 1887 the line was extended from Tamanend to Bayonne and pumping stations built at Hudsondale, Pa. (No. 6) and Changewater, New Jersey (No. 7).
Hub AI
Tidewater Oil Company AI simulator
(@Tidewater Oil Company_simulator)
Tidewater Oil Company
Tidewater Oil Company (rendered as Tide Water Oil Company from 1887 to 1936) was a major vertically integrated oil company that operated independently from 1887 to 1926, when it was sold to a holding company. Over the decades, it passed through various corporate hands. It sold petroleum and gasoline products and fuel under various brand names, including Tydol, Flying A, and Veedol.
In 2011, Veedol was sold by British Petroleum to Tidewater India. Now it is part of Andrew Yule and Company's Indian group and manufactures automotive oil for the Indian market on the sub-continent of South Asia. Tidewater does not have its own refinery, so it is dependent on base oil suppliers like HPCL and BPCL. It also manufactures a wide range of automotive lubricants. Its corporate headquarters is in Los Angeles, California.
In November 1878, the Tide-Water Pipe Company was founded by Byron D. Benson (ca. 1828-February 1888), Robert E. Hopkins, and David McKelvy (died May 10, 1918). Other sources include as founders Samuel Q. Brown (died October 5, 1909) and Alanson Ashford Sumner.
The capital at incorporation was $625,000 of which $500,000 was paid in as cash and $125,000 represented the rights-of-way for the Seaboard Pipe Line which were eventually not used. The Reading Railroad Company subscribed to $250,000 of the stock.
Benson, Hopkins, and McKelvy had forged a deal with Franklin Gowen, president of the Reading Railroad, to build a pipeline from the new Bradford oil field at Coryville, Pennsylvania, eastward to Williamsport, where the oil would be loaded into Reading tank cars for transport to independent refiners in Philadelphia and New York. Gowen agreed to put up $250,000, half the predicted cost of building the pipeline.
The result was the world's first long-distance oil pipeline: 102.87 miles. The line included 6-inch, 18.5 pounds per linear foot wrought iron pipe joints, ordered from the Reading Iron Company, which began shipments on January 30, 1879, and the National Tube Works, which followed on February 12. Railroads delivered construction materials to 10 shipping points along the route. Laying of the pipe began near Oleona on February 22 and the last joints were put in place on May 22. The line rose 1,200 feet to cross the Allegheny Mountains near Waterville, then descended by gravity 2,100 feet. The cost of laying the line was 15.449 cents per foot, including freight (5.227), hauling (6.4) and joining (3.822). Through May 28, 1880, a total of 1,097,761.06 barrels (3,008 per day) was moved, of which 943,483.02 were transported to eastern refineries.
The pipeline could move 6,000 barrels per day. Starting at Pumping Station No. 1 at Coryville, oil flowed 22.43 miles to No. 2 station at Olmsted near Coudersport, then 80.44 miles to Williamsport. The pumping engines at Coryville began operation at 4 p.m. on May 28; oil arrived at 10:18 a.m. on May 30 at No. 2 station, which began to pump the same day at 3:20 p.m. After a pressure drop was detected, a piece of wood and some rope were removed from the pipe. Olmsted resumed pumping at 5 p.m. on June 2. Oil arrived at the tank farm 1.5 miles east of Williamsport at 7:20 p.m. on June 4. From there the loading station of the railroad could be reached by 12,700 feet of 8-inch gravity-flow pipe.
In 1880, the Equitable Pipe Line was absorbed, the Coryville pumping station was moved a few miles to Rixford and the 4-inch pipe was replaced by 6-inch pipe. The line was extended from Williamsport to Tamanend in the winter of 1881-82 and new pumping stations were built at County Line (No. 3 halfway between Olmsted and Williamsport), Muncy (No. 4 just southeast of Williamsport) and Shumans (No. 5). From Tamanend the New Jersey Central Railroad provided a direct route to New York bypassing Philadelphia in rail shipments. In 1887 the line was extended from Tamanend to Bayonne and pumping stations built at Hudsondale, Pa. (No. 6) and Changewater, New Jersey (No. 7).