4 World Trade Center (4 WTC; also known as 150 Greenwich Street) is a skyscraper constructed as part of the new World Trade Center in Lower Manhattan, New York City. The tower is located on Greenwich Street at the southeastern corner of the World Trade Center site. Fumihiko Maki designed the 978 ft-tall (298 m) building.[8] It houses the headquarters of the Port Authority of New York and New Jersey (PANYNJ).[9]

The current 4 World Trade Center is the second building at the site to bear this address. The original building was a nine-story structure at the southeast corner of the World Trade Center complex. It was destroyed during the September 11 attacks in 2001, along with the rest of the World Trade Center. The current building's groundbreaking took place in January 2008, and it opened to tenants and the public on November 13, 2013. The building has 2.3 million square feet (210,000 m2) of space.

Site

[edit]

4 World Trade Center is at 150 Greenwich Street,[10] within the new World Trade Center (WTC) complex, in the Financial District neighborhood of Lower Manhattan in New York City. The land lot is bounded by Greenwich Street to the west, Cortlandt Way to the north, Church Street to the east, and Liberty Street to the south.[11][12] Within the World Trade Center complex, nearby structures include St. Nicholas Greek Orthodox Church and Liberty Park to the southwest; the National September 11 Memorial & Museum to the west; One World Trade Center to the northwest; and the World Trade Center Transportation Hub. 2 World Trade Center, and 3 World Trade Center to the north.[13] Outside World Trade Center, nearby buildings include 195 Broadway and the Millennium Hilton New York Downtown hotel to the northeast; the American Stock Exchange Building to the south; One Liberty Plaza to the east; and Zuccotti Park to the southeast.[14][15]

Original building (1975–2001)

[edit]
The southwest corner of the Original 4 World Trade Center, as seen from Liberty Street. August 21, 2001.

The original 4 World Trade Center was a nine-story low-rise office building completed in 1975 that was 118 ft (36 m) tall, and located in the southeast corner of the World Trade Center site. The building was designed by Minoru Yamasaki and Emery Roth & Sons. The first tenants, the Commodities Exchange Center, started to move into the building in January 1977.[16] On July 1, 1977, the Mercantile Traders finalized the move.[17] The building's major tenants were Deutsche Bank (Floor 4, 5, and 6) and the New York Board of Trade (Floors 7, 8, and 9). The building's side facing Liberty Street housed the entrance to The Mall at the World Trade Center on the basement concourse level of the WTC.

4 World Trade Center was home to commodities exchanges on what was at the time one of the world's largest trading floors (featured in the Eddie Murphy movie Trading Places). These commodities exchanges collectively had 12 trading pits.[18][19]

Destruction

[edit]

The World Trade Center's Twin Towers were destroyed during the September 11 attacks, creating debris that destroyed or severely damaged nearby buildings, such as the original 4 World Trade Center.[20] Much of the southern two-thirds of the building was destroyed, and the remaining north portion virtually destroyed, as a result of the collapse of the South Tower. The structure was subsequently demolished to make way for reconstruction.

At the time of the September 11 attacks, the building's commodities exchanges had 30.2 million ounces (860,000,000 g) of silver coins and 379,036 ounces (10,745,500 g) of gold coins in the basement.[21] The coins in the basement were worth an estimated $200 million.[22] Much of the coins had been removed by November 2001;[22] trucks transported the coins out of the basement through an intact but abandoned section of the Downtown Hudson Tubes.[23] Many coins belonging to the Bank of Nova Scotia were purchased in 2002, repackaged by the Professional Coin Grading Service, and resold to collectors.[24]

[edit]

Current building

[edit]

Site redevelopment

[edit]

Larry Silverstein had leased the original World Trade Center from the PANYNJ in July 2001.[25] His company Silverstein Properties continued to pay rent on the site even after the September 11 attacks.[26] In the months following the attacks, architects and urban planning experts held meetings and forums to discuss ideas for rebuilding the site.[27] The architect Daniel Libeskind won a competition to design the master plan for the new World Trade Center in February 2003.[28][29] The master plan included five towers, a 9/11 memorial, and a transportation hub.[30][31] By July 2004, two towers were planned on the southeast corner of the site: the 62-story 3 World Trade Center and the 58-story 4 World Trade Center.[30] The plans were delayed due to disputes over who would redevelop the five towers.[32] The PANYNJ and Silverstein ultimately reached an agreement in 2006. Silverstein Properties ceded the rights to develop 1 and 5 WTC in exchange for financing with Liberty bonds for 2, 3, and 4 WTC.[33][34]

Japanese architect Fumihiko Maki was hired to design the new 4 World Trade Center, on the eastern part of the World Trade Center site at 150 Greenwich Street, in May 2006. Meanwhile, Norman Foster and Richard Rogers were selected as the architects for 2 and 3 World Trade Center, respectively.[35][36] The plans for 2, 3, and 4 World Trade Center were announced in September 2006.[11][12] 4 World Trade Center would be a 61-story, 947-foot-tall (289 m) building.[11][37][38] The building would have contained 146,000 ft2 (13,600 m2) of retail space in its base and 1.8×10^6 ft2 (170,000 m2) of offices. The lower stories would have had a trapezoidal plan, changing to a parallelogram on the upper stories.[11] The lowest stories of 4 World Trade Center and several neighboring buildings would be part of a rebuilt Westfield World Trade Center Mall.[39] The same month, PANYNJ agreed to occupy 600,000 square feet (56,000 m2) within 4 WTC,[40] paying $59 per square foot ($640/m2), a lower rental rate than what Silverstein had wanted.[41][42] The city government offered to rent another 581,000 square feet (54,000 m2),[43] thus allowing Silverstein to obtain a mortgage loan for the tower's construction.[44] Silverstein would be allowed to evict the city government if he could rent out the space at market rate.[43]

As part of the project, Cortlandt Street (which had been closed to make way for the original World Trade Center) was planned to be rebuilt between 3 and 4 WTC.[45] The plans for Cortlandt Street affected the design of the lower stories of both 3 and 4 WTC, as one of the proposals called for an enclosed shopping atrium along the path of Cortlandt Street, connecting the two buildings.[46] The street was eventually rebuilt as an outdoor path.[47] Final designs for 2, 3, and 4 WTC were announced in September 2007.[48][49] The three buildings would comprise the commercial eastern portion of the new World Trade Center, contrasting with the memorial in the complex's western section.[50] At the time, construction of 4 WTC was planned to begin in January 2008.[51] As part of its agreement with the PANYNJ, Silverstein Properties was obliged to complete 3 and 4 WTC by the end of 2011.[52]

Construction

[edit]

Initial progress

[edit]
Preliminary site plans for the World Trade Center rebuild

In 2007, the PANYNJ started constructing the East Bathtub, a 6.7-acre (2.7 ha) site that was to form the foundations of 3 and 4 WTC.[53] The process involved excavating a trench around the site to a depth of 70 feet (21 m), then constructing a slurry wall around the site.[54] The PANYNJ was supposed to give the site to Silverstein Properties at the end of 2007; the contractors would have received a $10 million bonus if they had completed the work early.[55] If Silverstein did not receive the site by January 1, 2008, the PANYNJ would pay Silverstein $300,000 per day until the site was transferred.[53][56] The agency ultimately gave the site to Silverstein on February 17, 2008.[57][58] The PANYNJ paid a $14.4 million penalty for turning over the site 48 days after the deadline.[55]

The PANYNJ voted in early 2008 to extend the deadline for 4 WTC's completion to April 2012.[52][59] Meanwhile, police officials expressed concern that the building's all-glass design posed a security risk.[60] A study published in early 2009 predicted that 4 WTC, the first of Silverstein's three towers at the World Trade Center site, would not be fully leased until 2014 due to the 2008 financial crisis.[61] 4 WTC's construction was temporarily halted that March after city officials found that workers were operating a construction crane without a permit.[62] Disputes between the PANYNJ and Silverstein continued through late 2008, when Silverstein claimed that the agency owed him $300,000 per day for failing to demolish a barrier around the site, as the barrier prevented him from erecting the tower's foundations. The PANYNJ claimed that the barrier was several feet outside the excavation site and that it did not owe Silverstein anything.[63] That December, an arbitration panel ruled that the PANYNJ owed Silverstein an extra $20.1 million.[64]

By May 2009, Silverstein wanted the PANYNJ to fund the construction of 2 and 4 WTC, but the PANYNJ was only willing to provide funding for 4 WTC, citing the Great Recession and disagreements with Silverstein.[65][66] At the time, the PANYNJ had leased one-third of 4 WTC's office space, but no tenant had been signed for 2 WTC.[67] Silverstein also held an option to lease space to the city government for $59 per square foot ($640/m2), but he was reluctant to exercise the option, since he believed that market-rate rents for the space would increase drastically when the building opened.[66] Silverstein expressed confidence that the building would attract financial tenants since it was close to Wall Street.[68] Three PureCell fuel cells were delivered at the World Trade Center site in November 2010, providing about 30 percent of 4 WTC's power.[69] By the end of that year, the building had reached the tenth story; the project to date had been funded entirely by insurance proceeds.[70]

Funding and completion

[edit]

A New York state board voted in November 2010 to allow Silverstein to finance 4 WTC and another tower with up to $200 million of bonds from the American Recovery and Reinvestment Act of 2009.[71] Silverstein also wanted to sell $1.36 billion worth of Liberty bonds to fund 4 WTC's completion.[72] Silverstein decided in December 2010 to postpone the bond offering because of instability in the municipal bond market.[70][73] Early the next year, he exercised his option to lease space to the New York City government.[74][75] After the muni market stabilized, the PANYNJ planned to vote on the Liberty bond offering in early 2011.[76] The vote was delayed after several institutional investors objected to the fact that the Liberty bonds would have greater seniority than a bond offering that had previously been placed on the building.[77] If the Liberty bonds were not sold by the end of that year, Silverstein would not have enough money to complete the tower.[78]

Meanwhile, during early 2011, the building was constructed at an average rate of one floor per week,[79][80] and the building had reached the 23rd floor by May 2011.[80][81] After five months of negotiations, the PANYNJ announced a revised financing plan for the tower in September 2011, in which the Liberty bonds were subordinate to the existing bond offering.[82][83] The agency started selling Liberty bonds in November 2011.[84][85] The building's steel frame was built first, followed by the concrete core and the exterior curtain wall.[79] The building had reached the 61st story by the beginning of 2012.[86] A cable on one of the building's construction cranes snapped on February 16, 2012, dropping a steel beam 40 stories;[87][88] no one was seriously injured, and work resumed shortly afterward.[89] The building's superstructure was topped out on June 26, 2012, when workers installed the final steel beam on the 72nd floor.[90][91] In the two days after the tower's topping-out, there were two construction accidents, neither of which resulted in serious injuries.[92]

The building's basements were flooded in late 2012 during Hurricane Sandy, although the tower was still expected to be completed the following year.[93] Structural steel and concrete completed by June 1, 2013, followed by the removal of construction fencing in September 2013.[94] The building opened on November 13, 2013, along with the neighboring section of Greenwich Street.[95][96] It was the second tower to open as part of the new World Trade Center, after 7 World Trade Center.[97] 4 World Trade Center had cost US$1.67 billion to build, having been funded by insurance payouts and Liberty bonds.[98] At the time, the PANYNJ and the city government were the building's only tenants.[99][100] Though the two governmental tenants collectively occupied around 60 percent of the building,[101][102] the Financial Times reported that some of the space could be subleased.[101] Janno Lieber of Silverstein Properties expressed optimism that the building's design would attract tenants, saying: "We have a building that's going to feel like a tower on Park Avenue."[99]

Usage

[edit]
West and south facades with reflection of One World Trade Center

The first tenants to move in were the PANYNJ and the city government.[103] The New York City government leased 581,642 sq ft (54,036.3 m2) of space in the completed building.[104] The PANYNJ leased approximately 600,766 ft2 (55,813.0 m2) for its headquarters,[105][104] having relocated in 2015 from 225 Park Avenue South in Gramercy Park, Manhattan.[106] When 4 WTC opened, there was relatively low demand for office space in lower Manhattan, in part because many of the area's financial firms were downsizing their spaces.[107][108] There was so little demand for office space in the new tower that Silverstein rented out the vacant space for events, charging $50,000 per day for each floor.[109][110] According to The Wall Street Journal, these included a Super Bowl commercial, a film shoot for the 2014 movie Annie, and a wine-tasting event.[110]

By July 2015, the tower was 62 percent leased.[111] A February 2017 announcement by Spotify that it would lease floors 62 through 72 for its United States headquarters, along with a subsequent expansion announcement that July, brought 4 World Trade Center to full occupancy.[112][113] SportsNet New York, carrier of New York Mets broadcasts, moved its headquarters from 1271 Avenue of the Americas to an 83,000 ft2 (7,700 m2) facility in 4 WTC.[114] The SportsNet New York studios in 4 WTC also double as the New York City studios for NFL Network, hosting their morning show Good Morning Football.[115]

Silver Art Projects, a nonprofit organization operated by Larry Silverstein's grandson Cory Silverstein, opened 28 art studios on the 28th floor in 2020.[116][117] Twenty-five of the studios are reserved for the program's artists, who are selected through an annual application process and occupy each studio for free, while the remaining three studios are for the program's mentors.[117]

Architecture

[edit]

4 WTC is described as being either 977 feet (298 m)[98][118] or 978 feet (298 m) tall,[119][120] with 2.3 million square feet (210,000 m2) of office space.[121]

Form and facade

[edit]
Upper windows reflecting the Hudson River; viewed from One World Observatory

The facade is a curtain wall with glass panes that span the full height of each story.[79] The facade consists of glass panes measuring 5 feet (1.5 m) wide and 13 or 14 feet (4.0 or 4.3 m) tall.[102] Most of the facade is made of reflective glass, except at the lobby, where the facade is made of clear glass.[122] Five of the lowest stories are mechanical floors and contain narrow vertical louvers. The western facade of the tower, which faces the National September 11 Memorial, does not have louvers.[98] The New York Daily News wrote that Maki and Associates wanted the building's design to "pay deference to the memorial".[97] Jaros, Baum & Bolles was the MEP engineer.[123]

According to Engineering News-Record, Maki and Associates had designed 4 WTC as a "minimalist tower with an abstract sculptural presence".[79] The upper floors accommodate offices using two distinct floor shapes. Floors 7 to 46 each span 44,000 square feet (4,100 m2) and are parallelogram in plan, reflecting the shape of the World Trade Center site. the shape of a parallelogram. Floors 48 to 63 each cover 36,000 square feet (3,300 m2) and are trapezoidal in plan.[79] At the two obtuse angles of the parallelogram, there are deep grooves along the facade.[98] The top story contains a penthouse office.[124]

Structural features

[edit]

The structural engineer for the building is Leslie E. Robertson Associates, founded by Robertson, the chief engineer for the original Twin Towers in the 1960s.[125] The tower's foundation is composed of concrete footings that descend to the underlying bedrock. When the original World Trade Center was developed, the contractors found that there was a gap in the bedrock at the southeast corner of the site. Although the bedrock under most of the site is 70 feet (21 m) deep, the southeast corner contains a pothole, where the bedrock descends to 110 feet (34 m) because of erosion during the Last Glacial Period.[126] The current tower's foundation is surrounded by a slurry wall.[54] The slurry wall is largely anchored to the bedrock, except at the southeast corner of the site, where the pothole made this impossible.[126]

DCM Erectors manufactured the steel for the building's superstructure.[127][128] The superstructure consists of a steel frame weighing 25,000 short tons (22,000 long tons; 23,000 t). In addition, the building uses 100,000 cubic yards (76,000 m3) of concrete and 17,000 short tons (15,000 long tons; 15,000 t) of rebar. The center of the tower contains a mechanical core made of reinforced concrete, which includes mechanical equipment, stairs, and elevators.[79] Schindler manufactured the building's elevators, which operate at a speed of 1,800 feet per minute (550 m/min).[129][130] The retail space on the lower stories contains six escalators, two passenger elevators, and two freight elevators. The upper stories are served by 37 elevators, which consist of 34 passenger elevators and three service elevators.[130]

Interior

[edit]

Lower stories

[edit]
Retail facade and east entrance on Church Street

Six floors are used for retail. They consist of the ground floor, the three floors immediately above the ground floor as well as the two floors below ground.[79] The retail space occupies the eastern part of the ground floor.[98] The lower levels of the building are used by retail businesses, including Eataly.[131] These are connected via an underground shopping mall and concourse, connecting to the PATH and the New York City Subway via the World Trade Center Transportation Hub.[95][132]

The building's ground-floor lobby is two stories high,[133] with a 46-foot (14 m) ceiling.[132][118] The lobby occupies the western part of the ground floor, facing the National September 11 Memorial.[98][134] The space contains wood-beamed ceilings, white-granite floors,[95] and Swedish black granite walls.[98][134] Suspended from the lobby's ceiling is Kozo Nishino's sculpture Sky Memory,[119][135] which consists of seven pieces of titanium trusses collectively weighing 474 pounds (215 kg).[122] Sky Memory measures 98 feet (30 m) across and hangs 22 feet (6.7 m) above the floor.[122][135] The lobby also contains Vandal Gummy, a 7-foot-tall (2.1 m) sculpture of a bear by street artist WhIsBe.[136] The artist Ivan Navarro designed an LED sculpture near the bottom of the lobby's escalators.[137] Leading from the lobby are three hallways, where video art is displayed on wood-paneled walls.[133][138] The Wall Street Journal wrote that 4 WTC's lobby "will be the largest lobby by volume in New York".[138]

Critical reception

[edit]

When the building was being constructed, David W. Dunlap of The New York Times wrote that 4 WTC was "the biggest skyscraper New Yorkers have never heard of".[139] The Wall Street Journal wrote that the lobby "offers a grand front to the World Trade Center Memorial" and that the effect of the lobby's design "is intriguingly calming for a building soon to rest at the heart of the Financial District."[138] Upon the tower's opening, Daniel Libeskind wrote: "The WTC site has emerged from 12 years of contention and construction to become what we all hoped it would be: a place that will show the world everything that is great about cities, especially New York."[140]

See also

[edit]

References

[edit]
[edit]
Revisions and contributorsEdit on WikipediaRead on Wikipedia
from Grokipedia
4 World Trade Center (4 WTC) is a 72-story office in the World Trade Center complex in , . Developed by and designed by Pritzker Prize-winning architect , the structure rises 977 feet (298 meters) to its roof and provides approximately 2.3 million square feet of leasable across 56 floors, with column-free floor plates ranging from 34,000 to 44,000 square feet. Construction of the current building began in January 2008 following the demolition of the original 4 WTC, a nine-story low-rise structure completed in 1975 that sustained severe damage from debris during the September 11, 2001, terrorist attacks on the adjacent Twin Towers. The new tower achieved substantial completion in 2013, marking it as the first building to open in the redeveloped , with structural steel that year ahead of its November opening to tenants. Certified LEED Gold for sustainable design features including energy-efficient systems and proximity to public transit, 4 WTC emphasizes flexible, high-tech workspaces with panoramic views of . The building anchors the southeast portion of the 16-acre campus and houses the headquarters of the of New York and New Jersey at 150 Greenwich Street, alongside tenants such as and various financial and media firms. Its glass curtain wall facade and setback design integrate with the surrounding memorials and transportation hub, contributing to the site's role as a symbol of resilience and economic revival in post-9/11 New York. Delays in full tenancy due to market conditions post-financial crisis were overcome by 2018, with occupancy reflecting demand for premium space.

Site and Historical Background

Original Site Acquisition and Development

The site for the World Trade Center complex, encompassing the southeast corner where the original 4 World Trade Center would be located, was selected by the of New York and New Jersey on September 20, 1962. This 16-acre parcel in , bounded by Vesey, Church, Liberty, and West Streets, was previously occupied by , a vibrant district of small electronics retailers, surplus goods shops, and related businesses numbering in the hundreds. Planning for the project originated in December 1960, with the site finalized after considering alternatives, including relocation over the Hudson Tubes. The Port Authority invoked eminent domain to acquire the properties, beginning formal purchases on March 1, 1965, which displaced Radio Row merchants who had mounted protests and legal challenges since 1962. New York courts, including the Court of Appeals, upheld the authority's right to proceed, clearing final obstacles by March 1966 despite opposition from affected business owners arguing inadequate compensation and economic harm. Demolition of existing structures commenced on August 5, 1966, clearing 13 square blocks for development. Site preparation involved constructing a innovative slurry wall—"bathtub"—around the perimeter starting in 1966 to retain the and enable deep excavation for the foundations of the complex's buildings, including the low-rise structures like the original 4 World Trade Center. This engineering feat, completed by 1968, allowed for the subsequent erection of the towers and ancillary buildings, with the original 4 World Trade Center, a nine-story office structure, reaching completion in 1975.

Specifications of the Original Building

The original 4 World Trade Center was a low-rise office building situated at the southeast corner of the World Trade Center site in Lower Manhattan, New York City. Completed in 1975, it featured nine stories and reached a height of 118 feet (36 meters). The structure was part of the broader World Trade Center complex developed by the Port Authority of New York and New Jersey, with design oversight from Minoru Yamasaki Associates and Emery Roth & Sons, consistent with the low-rise ancillary buildings in the ensemble. Primarily intended for commercial office use, the building housed commodities trading operations as its main function. The top two floors accommodated one of the largest commodities exchanges in the United States, featuring extensive trading floors. The first tenants, the Commodities Exchange Center, relocated to the premises starting in January 1977. By July 1977, four key commodity exchanges—the , Commodity Exchange Inc., , and Coffee, Sugar and Cocoa Exchange—operated from a shared $10 million trading facility within the building. This setup supported high-volume trading activities, including metals, products, and agricultural commodities, contributing to the building's role in New York City's financial ecosystem prior to its destruction.

Destruction in the September 11 Attacks

Immediate Damage from Plane Impacts and Fires

The aircraft impacts on September 11, 2001, did not directly strike 4 World Trade Center, a nine-story office building situated at the southeastern corner of the World Trade Center complex, adjacent to the South Tower. crashed into the North Tower at 8:46 a.m. ET, severing multiple core columns and igniting fires across several floors fueled by approximately 10,000 gallons of . struck the South Tower at 9:03 a.m. ET, impacting floors 77 through 85 and dislodging fireproofing while dispersing that initiated fires on multiple levels. Positioned southeast of the South Tower, 4 WTC escaped the direct path of both aircraft and associated fireball ejections, which primarily affected areas northward and eastward from the impact zones. Initial from the plane crashes, including lightweight aircraft fragments and burning materials, scattered across the WTC plaza but caused no documented structural compromise to 4 WTC in the immediate aftermath. The intense fires in the towers, reaching temperatures exceeding 1,000°C in some areas, generated convective heat and smoke plumes that enveloped the complex, prompting evacuation of 4 WTC occupants without reported ignition of fires within the building at that time. Proximity to the South Tower exposed the southern facade of 4 WTC to radiant heat, potentially weakening exterior elements, though assessments indicate this did not result in significant immediate damage prior to subsequent events. The Federal Emergency Management Agency's building performance study notes that while tower fires contributed to the overall chaotic environment, fires in 4 WTC were initiated later by from tower collapses rather than directly from the plane impacts or initial tower fires.

Collapse Sequence and Debris Contribution

The collapse sequence of the original 4 World Trade Center began immediately following the progressive failure of the South Tower (WTC 2) at 9:59 a.m. on , 2001. As WTC 2's upper sections tilted southeastward during its descent, significant portions, including the antenna and core remnants, struck the southeastern corner and roof of 4 WTC, a nine-story structure measuring approximately 160 by 230 feet. This impact caused instantaneous crushing and partial collapse of the southern and eastern sections, with deformed columns, beams, and collapsed floor slabs documented in post-event assessments. Fires ignited across multiple floors of the damaged building due to burning debris from WTC 2, including ignited contents and structural elements, which overwhelmed efforts amid the broader chaos. The loss of lateral support from the destroyed southern portion led to instability in the remaining northern section, resulting in its within minutes of the initial impact. By early afternoon, 4 WTC was reduced to a heavily compromised , with the northern facade partially standing but irreparably deformed, necessitating full in the subsequent cleanup. The debris from 4 WTC's collapse augmented the massive rubble pile in the southeastern quadrant of the , comprising twisted steel, concrete fragments, and office contents that compounded damage to nearby such as streets and utilities. While this material contributed to the overall debris field hindering operations and site stabilization, it played no primary role in the structural failure of , whose damage and fires were predominantly initiated by debris from the North Tower (WTC 1) collapse at 10:28 a.m. National Institute of Standards and Technology analyses attribute 7 WTC's afternoon collapse to internal fire spread and , independent of significant input from 4 WTC remnants.

Redevelopment Planning

Integration into the WTC Master Plan

4 World Trade Center occupies the southeast corner of the 16-acre , positioned at 150 between Liberty Street to the south, Church Street to the east, Cortlandt Street to the north, and to the west, in alignment with the site's restored pre-9/11 street grid as outlined in Daniel Libeskind's master plan selected in February 2003. This placement integrates the tower into the plan's spiral arrangement of buildings, which frames the 9/11 Memorial to the north while enhancing urban connectivity and public access. The structure adheres to master plan guidelines by setting back from streets to create open plazas, including the "Wedge of Light" feature on the eastern edge, ensuring sunlight illuminates the memorial footprints annually on September 11. Designed by , 4 World Trade Center's minimalist form and articulated corners complement the heterogeneous architectural ensemble of the site, rising to 977 feet as the fourth tower in the plan's configuration of office skyscrapers surrounding transportation and memorial elements. Its base incorporates five retail levels—two below grade, ground floor, and two above—including connections to , facilitating pedestrian integration with the adjacent Fulton Transit Center and the WTC Transportation Hub by . This podium-level design supports the master plan's emphasis on mixed-use vitality, with underground linkages to the Vehicle Security Center and PATH rail systems for seamless transit access. The tower's 2.3 million square feet of office space, including relocation of the of New York and headquarters across 11 dedicated floors, fulfills the plan's economic objectives by prioritizing high-tech, sustainable leasing proximate to the and transit . As the first office building completed under the master plan in November 2013, it demonstrated feasibility for subsequent towers like 3 WTC and 2 WTC, conditioned on market demand and lease commitments per the site's phased development framework.

Architectural Design Selection

In May 2006, of , the lead developer for towers 2 through 5 in the World Trade Center redevelopment, selected Japanese architect to serve as the design architect for 4 World Trade Center, announcing the decision alongside the choice of for tower 3. This developer-driven selection process prioritized established architects capable of producing refined, site-appropriate designs that adhered to Daniel Libeskind's overarching master plan for the 16-acre site, which emphasized memorial integration and varied tower forms to avoid visual uniformity. Unlike the competitive processes for or the memorial, no public design competition was held for tower 4; Silverstein's team directly engaged Maki based on his portfolio of modernist works emphasizing subtlety and structural clarity. Maki, a 1993 Pritzker Prize laureate known for projects like the , proposed a 978-foot (298 m) tapered tower with a faceted glass envelope to create a "quiet but strong" presence amid neighboring structures, deliberately minimizing visual dominance to respect the site's solemnity. AAI Architects, P.C. was appointed as architect of record to handle local code compliance and construction documentation, while firms like Leslie E. Robertson Associates contributed expertise drawn from prior WTC experience. Final refined designs incorporating these inputs were unveiled in September 2007, confirming the building's 72-story configuration with approximately 1.8 million square feet of office space, including provisions for headquarters relocation. The choice reflected Silverstein's strategy of assembling international talent—similar to selections for towers 2 (Norman Foster) and 3—to accelerate rebuilding while meeting requirements for functionality and security, amid ongoing site preparation delays from debris removal and foundation work completed by early 2008. Maki's design aligned causally with post-9/11 priorities by incorporating enhanced in core systems and blast-resistant glazing, informed by lessons from the original complex's vulnerabilities, though specifics were finalized during reviews rather than initial selection.

Funding Challenges and Insurance Resolutions

The insurance policies held by , the leaseholder of the World Trade Center complex, covered approximately $3.55 billion in following the , 2001, attacks, but disputes arose over whether the two plane impacts constituted one or two separate occurrences, potentially doubling the payout to $7 billion. pursued litigation against over 20 insurers, arguing for separate events to fund full reconstruction, while insurers contended it was a single coordinated terrorist act. These legal battles delayed access to funds essential for redevelopment, with partial settlements providing interim capital but leaving overall recovery uncertain until broader resolutions. In May 2007, a comprehensive settlement resolved outstanding claims, with insurers agreeing to pay an additional $4.55 billion, bringing total recoveries to about that amount across the complex, though less than the full amount sought for replacement costs exceeding $12 billion when accounting for debris removal and lost rental income. This infusion, combined with federal authorizations for tax-exempt financing of rebuilding, enabled Silverstein to allocate portions toward planning and initial site preparation for towers including 4 World Trade Center, which he was obligated to develop under his lease terms. However, the settlements imposed allocation constraints, with the Port Authority of New York and claiming a share for and its takeover of 1 World Trade Center, limiting Silverstein's discretion for towers 2 through 5. Redevelopment funding for 4 World Trade Center faced significant hurdles from the 2008 global financial crisis, which eroded commercial real estate demand and tightened credit markets, creating uncertainty over tenant commitments needed to secure debt financing. delayed bond issuances multiple times; a planned $900 million sale for Tower 4 was postponed in April 2011 amid investor concerns over municipal debt loads and weak pre-leasing, with the tower starting at under 50% occupancy projections. Construction groundbreaking occurred in 2008 but stalled without firm anchors, as economic contraction reduced corporate relocations to the site. Resolution came through hybrid public-private financing leveraging post-9/11 Liberty Bonds. In September 2011, the endorsed a $1.2 billion bond issuance by the New York Liberty Development Corporation, structured as subordinate revenue bonds with repayment prioritized below the agency's general obligations, yielding higher interest rates around 5% for long-term maturities to attract investors. The offering was oversubscribed, reflecting market confidence bolstered by credit support and eventual tenant deals, such as with the , allowing construction to resume fully by late 2011. This mechanism, rated 'A-' by , tied repayments to tower revenues, mitigating risks from vacancy but underscoring reliance on governmental backstopping amid private funding shortfalls.

Construction and Engineering

Timeline of Construction Phases

Construction of the new 4 World Trade Center began in early 2008, after the of New York and completed excavation and site preparation for the east area, which included the footprint for buildings 3 and 4, and transferred control to developer . This phase involved foundational groundwork amid the broader World Trade Center redevelopment, with initial focus on below-grade infrastructure to support the 72-story tower's 977-foot height and 2.3 million square feet of . Superstructure erection advanced in 2009, when the awarded a major contract to DCM for fabricating and installing , shared with , enabling rapid vertical progress on the designed by architect . By mid-2011, the core and perimeter columns were rising, as evidenced by on-site progress through late 2012, incorporating a diagrid for enhanced stability. The milestone of occurred on June 26, 2012, with the placement of the final steel beam during a ceremony attended by developer and officials, marking the completion of the structural frame ahead of schedule relative to initial projections. Subsequent phases encompassed curtain wall installation, mechanical systems integration, and interior build-out, culminating in substantial completion. The building achieved operational readiness and opened to tenants on November 13, 2013, becoming the first office tower finished in the post-9/11 World Trade Center master plan, with initial occupancy by agencies including the New York City government leasing multiple floors. This timeline reflected efficient sequencing despite shared site constraints with adjacent projects, though full tenancy ramped up gradually into 2014.

Key Structural Innovations and Safety Features

The structural system of 4 World Trade Center employs a hybrid design combining a core with framing for the perimeter and floors, enabling long-span office layouts with column-free corners and 80-foot perimeter column spans. This configuration draws on post-9/11 engineering lessons by prioritizing concrete's superior fire resistance and over the original World Trade Center's exposed trusses, which contributed to under prolonged heat exposure. The core, enclosing elevators, stairs, bathrooms, and mechanical shafts, consists of two linked concrete tubes formed by double wythe walls—each 14 inches thick—separated by a 3-inch void filled with , enhancing compartmentalization against spread and structural redundancy. Steel girders and beams connect the core to the exterior, with outriggers at mechanical floors distributing loads and improving lateral stability against and seismic forces. Evacuation safety incorporates two principal stairwells in the main tower, expanding to four in the lower sections to facilitate faster egress in line with updated codes mandating wider, protected and redundant paths post-9/11. The 37 passenger elevators feature pressurized cabs and emergency recall systems, while the facade's custom composite glass panels and solid steel mullions meet enhanced blast and impact criteria, reducing shatter risk and supporting overall perimeter security. These elements collectively address vulnerabilities exposed in the 2001 attacks, such as fire propagation and evacuation bottlenecks, through empirical testing and code-compliant hardening.

Cost Escalations and Financial Analysis

The development of 4 World Trade Center proceeded with financing primarily drawn from post-9/11 insurance recoveries allocated to site lessee and bonds issued via the New York Liberty Development Corporation to support rebuilding. These bonds facilitated construction without reliance on direct federal grants beyond tax-exempt incentives, with lease commitments from major tenants providing revenue streams for debt service. In July 2021, issued an 'A-' rating to $1.225 billion in related liberty revenue refunding bonds, emphasizing the project's subordinate but reliable payment structure backed by rental obligations from the Port Authority of New York and New Jersey (PANYNJ) and the City of New York, which together anchor occupancy and mitigate default risk through diversified public-sector lessees. Unlike the broader World Trade Center redevelopment—where components like the transportation hub ballooned from an initial $2.2 billion budget to over $4 billion due to design changes, delays, and scope expansions—4 WTC avoided significant cost escalations. Construction, which began in January and reached in 2013, benefited from a straightforward design by and phased leasing that aligned expenditures with revenue inflows, enabling substantial completion ahead of major site-wide disruptions. No public reports or financial disclosures indicate overruns exceeding standard material and labor inflation during the period, contrasting with the $1 billion-plus excess on the hub alone by . Financially, the building's viability hinges on long-term , including PANYNJ's headquarters relocation to floors 51-63 in April 2018, which secures baseline occupancy amid variable market conditions. Broader analyses of PANYNJ's WTC investments project recovery rates of 97.4% to 98.6% on the agency's $16.76 billion total outlay across the site, driven by rental yields and appreciation that encompass 4 WTC's contributions through Silverstein's ground structure with PANYNJ. This model prioritizes stability over short-term profitability, with bond covenants tying debt repayment to net operating exceeding coverage ratios of 1.25x, reflecting conservative amid post-recession commercial volatility.

Architectural Design

Exterior Form and Facade Materials

The exterior form of 4 World Trade Center embodies a minimalist aesthetic designed by Fumihiko Maki of Maki and Associates, featuring a taut all-glass enclosure that emphasizes an abstract sculptural presence and quiet dignity. Rising 72 stories to a height of 978 feet (298 meters), the tower integrates seamlessly into the World Trade Center master plan with subtle geometric articulations, including two obtuse glass edges at the southwest and northeast corners accented by dramatic indentations that enhance its sleek profile. The facade employs a structurally glazed curtain wall system, providing extensive transparency through floor-to-ceiling windows that span the full height of each story. Clad in composite glass panels with multiple layers of coatings, the material achieves a matte metallic quality that varies with light conditions, contributing to the building's understated elegance. Fabricated by Permasteelisa Group, the custom-unitized curtain wall covers over 65,000 square meters and incorporates high-span framing along with aluminum shopfronts and entrances for and precision assembly. At the base, the lobby and atrium are enclosed by a monumental wall supported on custom-designed solid mullions, maximizing openness while maintaining structural integrity. The use of thicker in the sheer curtain wall flattens the facade plane, minimizing visual distractions and aligning with Maki's intent for a refined, planar surface that reflects its urban context without dominating it. Specific glazing includes Viracon's VRE13-38VE13-85 coated , selected for its performance in and aesthetic consistency.

Core Structural Systems

The core of 4 World Trade Center comprises a reinforced high-strength structure that serves as the primary vertical load-bearing and shear-resisting element, enclosing elevators, stairwells, and mechanical systems across its 59-story height of 977 feet (298 meters). This core provides enhanced and fire resistance, drawing lessons from the 2001 attacks by prioritizing and durability over the steel-framed cores of the original complex, which were vulnerable to under extreme heat. The design achieves this through densely reinforced walls and slabs, typically with compressive strengths exceeding 10,000 psi in critical zones, enabling the core to independently support gravity loads while minimizing reliance on perimeter framing. Integrated with the core is a composite steel-concrete floor system, featuring steel girders and beams embedded or connected to the core walls, which transfer lateral forces from and seismic events to the foundation via trusses at mechanical floors. This hybrid approach—steel for spanning efficiency and for containment—optimizes open plates up to 80 feet in span without intermediate columns, while the core's stiffness reduces drift under design loads to less than 1/500 of height, per building codes enhanced post-9/11. Seismic isolation elements at the base further decouple the superstructure, with the core anchored to slurry walls extending 100 feet below grade for resistance against in the Hudson River fill. Safety innovations in the core include dual pressurized stair enclosures with widths of at least 44 inches for rapid egress, capable of accommodating over 5,000 occupants per hour, and embedded fire-rated barriers that compartmentalize mechanical risers to prevent smoke propagation. These features exceed baseline codes, incorporating redundant utility shafts and blast-resistant detailing informed by NIST recommendations, ensuring compartmentalization even under localized damage scenarios.

Interior Configuration and Sustainability Elements

The interior of 4 World Trade Center features flexible office layouts optimized for tenant customization, with column-free corners and 80-foot perimeter column spans that maximize natural light penetration and provide unobstructed 360-degree views of . Floors 7 through 46 offer typical parallelogram-shaped plates of approximately 44,560 rentable square feet, while upper floors 57 to 72 utilize trapezoidal configurations oriented toward the , enhancing spatial openness and visual connectivity to the site. These design elements support a total leasable office area of 2.3 million square feet across 72 stories, with individual floors ranging from 34,000 to 44,000 square feet. Sustainability measures in 4 World Trade Center emphasize energy efficiency and reduced environmental impact, achieving Gold certification under the U.S. Council's BD+C: Core and Shell v2 system on June 19, 2016, for its 2.19 million square foot structure. Key features include high-efficiency building systems designed to meet stringent energy standards, such as frequency-controlled elevator motors with 1 drives that cut consumption by up to 35% compared to conventional systems. The building sources 70% of its energy from renewable resources, contributing to lower carbon emissions and overall conservation. Integration of natural ventilation, abundant daylighting from expansive glazing, and efficient mechanical systems further align with criteria for indoor and resource use.

Tenancy and Operational Use

4 World Trade Center's major tenants include governmental anchors such as the of New York and , which maintains its headquarters in the building, and the City of New York, whose Human Resources Administration secured a for 582,000 square feet across floors 23 through 35 in October 2011. Private sector occupants feature technology and media firms, notably , (), , Rippling, and fintech company Clear Street, which expanded its headquarters to 88,000 square feet in July 2025 via a 10-plus-year extension. Insurance provider Zurich American Insurance and ticketing platform , the latter via an August 2024 sublease for one full floor, also occupy significant space, alongside earlier entrants like ad technology firm MediaMath, public relations agency Padilla, and investment research company Morningstar. Occupancy trends demonstrate steady progress from foundational public leases to robust private-sector uptake in a 2.3 million-square-foot tower that reached full operational status in 2018. Early commitments from the and City agencies provided leasing stability amid post-reconstruction market caution, enabling subsequent deals with high-profile tech tenants drawn to the building's proximity to the transportation hub and resilient design. Post-2020 remote work shifts slowed momentum across office markets, yet 4 World Trade Center rebounded through targeted expansions and subleases, attaining 97 percent occupancy by July 2025. This high utilization rate underscores the site's enduring appeal for firms prioritizing prestige, infrastructure, and recovery from pandemic-era disruptions, contrasting with broader office vacancy pressures exceeding 15 percent in late 2024.

Integration with Transportation Hub

4 World Trade Center is directly connected to the World Trade Center Transportation Hub—commonly known as the Oculus—via an underground pedestrian corridor integrated with the retail mall. This linkage provides seamless, weather-protected access from the building's base at Church and Liberty Streets to the hub's facilities, including the PATH station serving Newark and Hoboken lines, as well as connections to 12 subway lines (1, 2, 3, 4, 5, A, C, E, J, Z, R, and W). The corridor forms part of the broader West Concourse network, extending westward to Brookfield Place and eastward toward the Fulton Transit Center, enabling occupants to navigate Lower Manhattan's transit infrastructure without ascending to street level. This design prioritizes pedestrian flow for the hub's estimated 250,000 daily users, reducing congestion and enhancing efficiency for 4 WTC's tenants, such as government agencies and financial firms. The integration aligns with the site's post-9/11 redevelopment goals of resilient, interconnected infrastructure managed by the of New York and . Phased openings of the hub's components, including the Westfield mall corridor to 4 WTC, commenced in early 2016, coinciding with the building's operational maturity following tenant occupancy starting in 2014. Proximity to additional amenities like ferry terminals and bus routes further bolsters accessibility, though critics have noted navigational complexities within the underground passages during peak hours.

Security and Risk Management

Enhanced Post-9/11 Security Protocols

The reconstruction of 4 World Trade Center incorporated site-wide security enhancements developed in response to the , 2001, attacks, emphasizing prevention of vehicle-borne improvised explosive devices (VBIEDs) and unauthorized access across the 16-acre World Trade Center campus. These protocols, outlined in the 2013 World Trade Center Campus Security Plan coordinated by the New York Police Department (NYPD), established a fortified perimeter with restricted vehicle entry points to protect office towers including 4 WTC, located at 150 . The plan mandated screening of all incoming vehicles at designated checkpoints, such as those at Washington Street and Barclay Street, West and Barclay Street, Trinity Place/Church Street and Liberty Street, and Liberty Street and West Street/Route 9A, with implementation beginning in 2013 and full operational status by 2019. Vehicle access controls featured a two-stage process of credentialing and physical screening at sally ports equipped with retractable barriers and personnel booths, ensuring no unscreened vehicles could approach buildings like 4 WTC. The Trusted Access Program (TAP) expedited processing for pre-authorized vehicles—such as those from tenants, deliveries, and for-hire services—reducing screening times to 30-40 seconds via license plate readers and K-9 inspections, while non-TAP vehicles underwent more thorough checks at the on Liberty Street. Static and operable barriers, including 36-inch bollards spaced 4 feet apart along curbs on streets like and , created standoff distances of up to 18 feet from building facades, mitigating blast risks from potential VBIEDs near 4 WTC's entrances on Greenwich and Fulton Streets. These measures displaced limited parking but integrated with streetscape elements like planters to maintain urban functionality. Blast-resistant design for 4 WTC, provided by Thornton Tomasetti in collaboration with architect Fumihiko Maki and owner Silverstein Properties, reinforced the structure with redundant steel and concrete walls to withstand explosive forces, exceeding standard building codes. Additional protocols included integrated surveillance via the Situational Awareness Platform Software (SAPS), which unified CCTV, access controls, and alarms across the campus, monitored from a centralized NYPD command center coordinating with the Port Authority Police and FDNY. Physical Identity and Access Management (PIAM) systems managed credentials for over 50,000 tenants and visitors, with 24/7 patrols by multiple agencies ensuring layered defense. These enhancements, costing millions in infrastructure like the $40 million estimated for initial perimeter fortifications, prioritized causal deterrence of ground-level threats while preserving the tower's operational viability.

Criticisms of Security Gaps and Costs

In , a series of breaches at the , which includes 4 World Trade Center, exposed vulnerabilities in perimeter controls and access management despite post-9/11 enhancements such as bollards, checkpoints, and reinforced structures. On , a 16-year-old from evaded guards, crawled through a , and reached the spire of 1 World Trade Center, posting photos online before being detected. Earlier that month, two base jumpers, including a site worker, accessed the roof of the same building and parachuted from 1,368 feet. Additional incidents involved unauthorized entries through open gates during deliveries and job interviews, with one individual receiving a trespassing summons after being spotted inside the secure zone. These lapses, occurring amid ongoing at 4 World Trade Center, prompted the of the site's chief on and a full review of contractor Services by the , which threatened contract termination. Critics, including analysts, highlighted these events as of insufficient , monitoring, and procedural rigor, arguing that such gaps could enable terrorist incursions in a high-profile target. Further criticisms focused on emergency access impediments from the site's security design. In 2012, residents near the complex, such as Kathleen Moore living adjacent to 4 World Trade Center, objected to proposed vehicle barriers and perimeters, contending they would block ambulances from reaching nearby buildings during crises. These concerns underscored a tension between fortified defenses—intended to prevent vehicle-borne attacks—and practical urban functionality, with detractors noting that overly rigid protocols risked delaying in densely populated . A separate 2008 incident, where a homeless individual retrieved sensitive documents from WTC trash bins, was labeled an "egregious security lapse" by officials, revealing weaknesses in document disposal and protocols applicable site-wide. Security costs for the World Trade Center complex, encompassing 4 World Trade Center, have drawn scrutiny for their scale and contribution to financial shortfalls. Operating expenses for totaled $91.4 million in 2019, the largest single category and up from $74.6 million in 2017, exacerbating annual losses exceeding $100 million for the Authority's WTC holdings. Reconstruction budgets allocated over $1.1 billion specifically to a vehicle and related parking infrastructure, part of broader post-9/11 mandates for blast-resistant features and systems. By 2025, the Authority's overall and budget surpassed $1 billion agency-wide, with WTC-specific outlays reflecting persistent high staffing, technology upgrades, and compliance demands. Analysts have criticized these expenditures as unsustainable, arguing that while justified by threat levels, they inflate rents, deter tenants, and strain public funds without proportionally reducing risks, as evidenced by recurring breaches. The Authority's shift to a new contractor in May 2014 following the breaches incurred additional transition costs, further fueling debates over efficiency in .

Economic Impact and Reception

Role in Lower Manhattan Revitalization


4 World Trade Center opened on November 14, 2013, as the first commercial office tower completed in the redeveloped World Trade Center site following the September 11, 2001 attacks, marking a significant milestone in restoring Lower Manhattan's status as a global business hub. This 2.3 million-square-foot skyscraper, developed by Silverstein Properties, provided modern, high-efficiency office space amid ongoing site reconstruction, helping to rebuild investor confidence in the area after years of economic disruption from the attacks and subsequent cleanup. Its completion facilitated the return of professional services and financial firms, contributing to the stabilization of downtown's commercial real estate market, which had suffered substantial vacancy and relocation losses post-9/11.
The building's rapid leasing trajectory underscored its role in economic recovery, achieving full occupancy by 2016 through tenants such as Moody's Investors Service, the New York State Department of Labor, and technology firms like MediaMath, which signed a 15-year, 106,000-square-foot lease. This influx of occupants generated thousands of jobs and bolstered local tax revenues, aligning with broader World Trade Center redevelopment projections of adding up to $15.4 billion to New York City's economic output by 2015 and supporting 8,530 annual jobs across the site. By anchoring the eastern side of the 16-acre campus, 4 World Trade Center activated adjacent streetscapes and public spaces, encouraging mixed-use development that transformed Lower Manhattan from a daytime financial district into a more vibrant, 24-hour neighborhood with increased residential and retail activity. As noted by New York City Deputy Mayor for Economic Development Robert Steel at the opening, "The opening of 4 World Trade Center signifies a pivotal step in the revitalization of Downtown Manhattan and as a whole," reflecting its catalytic effect on attracting further investment and spurring the completion of neighboring towers like . The tower's sustainable design features, including energy-efficient systems, appealed to environmentally conscious tenants, further enhancing the area's competitiveness against amid post-recession recovery efforts. Overall, 4 World Trade Center's integration into the World Trade Center master plan helped reverse population and employment declines in , with the district's residential base doubling to over 60,000 by the mid-2010s, supported by commercial anchors like this building.

Architectural Critiques and Public Legacy

Architectural critiques of 4 World Trade Center, designed by and completed in , emphasize its restrained modernist aesthetic, characterized by a faceted glass curtain wall that creates a subtle, crystalline form rising 977 feet. Critics have lauded the building's elegance and precision, positioning it as a respectful to the site's more iconic towers, with one review describing it as "never showy" and among the finest office structures of the prior fifteen years. This design philosophy prioritizes deference to the memorial and transportation elements, avoiding visual dominance through subtle setbacks and a low-profile base that integrates with the surrounding plaza. However, some assessments note a certain in the facade's , which conveys deceptive simplicity but can appear less inviting up close, potentially prioritizing symbolic restraint over pedestrian warmth. and visitor reception has been generally positive yet tempered, with observers appreciating its contribution to the site's revitalized skyline while deeming it competent rather than transformative. In terms of public legacy, 4 World Trade Center stands as an early milestone in the World Trade Center's reconstruction, symbolizing resilience and functional rebirth following the 2001 attacks, with its occupancy by tenants like the reinforcing institutional continuity. The structure has aided in reestablishing Ground Zero's viability for commerce and public use, contributing to Lower Manhattan's economic recovery without overshadowing the memorial's gravity, though broader critiques of the complex question whether such measured designs fully recapture the original site's innovative spirit.