The Dnieper Hydroelectric Station (Ukrainian: ДніпроГЕС, romanized: DniproHES), also known as the Dnipro Dam, is a hydroelectric power station in the city of Zaporizhzhia, Ukraine. Operated by Ukrhydroenergo, it is the fifth and largest station in the Dnieper reservoir cascade, a series of hydroelectric stations on the Dnieper river that supply power to the Donets–Kryvyi Rih industrial region. Its dam has a length of 760 metres (2,490 ft), a height of 60 metres (200 ft).
The dam elevates the Dnieper river by 37.5 metres (123 ft) and maintains the water level of the Dnieper Reservoir, which has a volume of 3.3 km3 and stretches 129 kilometres (80 mi) upstream to the nearby city of Dnipro. The reservoir's two shipping canals—the disused original one with three staircase locks and a newer one with one staircase lock—allow ships to bypass the dam at its eastern end and sail upstream as far as the Pripyat River. A highway on the dam and bridge over the shipping canals enable vehicles to cross the Dnieper.
The electric station was built by the Soviet Union from 1927 to 1932. After being destroyed during World War II to make it harder for advancing German forces to cross the river and to hamstring their occupation by removing 19% of regional network capacity, it was rebuilt from 1944 to 1950. An expansion built from 1969 to 1980 quadrupled the station's output, with further modernization renovations conducted in the 1990s. In 2024, after being hit by Russian missiles, power output at the Dnieper Hydroelectric Station came to a halt.
In the lower reaches of the Dnieper River, there was an almost 100-kilometre (62 mi)-long stretch that was filled with the Dnieper Rapids. This is approximately the distance between the modern cities Dnipro and Zaporizhzhia. During the 19th century, engineers worked on the projects to make the river navigable. Projects for flooding the rapids were proposed by N. Lelyavsky in 1893, V. Timonov in 1894, S. Maximov and Genrikh Graftio in 1905, A. Rundo and D. Yuskevich in 1910, I. Rozov and L. Yurgevich in 1912, Mohylko.
While the main objective of these projects was to improve navigation, hydroelectric power generation was developed concurrently, in terms of the "utilization of the freely flowing water". G. Graftio's 1905 project included three dams with a small area of flooding.
The Dneprostroi Dam was built on vacated land in the countryside at the old river crossing known as Kichkas just north of Khortytsia island. The reason for building it was to stimulate Soviet industrialization. A special company was formed called Dniprobud or Dneprostroi (hence the dam's alternative name) that later built other dams on the Dnieper and exists to this day. The design for the dam that was accepted dates back to the USSR GOELRO electrification plan which was adopted in the early 1920s. The station was designed by a group of engineers headed by Prof. Ivan Alexandrov, a chief expert of GOELRO, who later became a head of the RSFSR State Planning Commission. The station was planned to provide electricity for several aluminium production plants and a high quality iron and steel plant that were also to be constructed in the area.
The DniproHES project used the experience gained from the construction of the Sir Adam Beck Hydroelectric Power Stations at Niagara Falls, Ontario, the Hydroelectric Island Maligne, Quebec, and the La Gabelle Generating Station on the St. Maurice River. On 17 September 1932, the Soviet government awarded six American engineers (including Hugh Cooper, William V. Murphy, and G. Thompson, engineers of General Electric) with the Order of the Red Banner of Labour for "the outstanding work in the construction of DniproHES".
Soviet industrialization was accompanied by a wide propaganda effort. Leon Trotsky, by then out of power, campaigned for the idea within the ruling Politburo in early 1926. In a speech to the Komsomol youth movement, he said:
Hub AI
Dnieper Hydroelectric Station AI simulator
(@Dnieper Hydroelectric Station_simulator)
Dnieper Hydroelectric Station
The Dnieper Hydroelectric Station (Ukrainian: ДніпроГЕС, romanized: DniproHES), also known as the Dnipro Dam, is a hydroelectric power station in the city of Zaporizhzhia, Ukraine. Operated by Ukrhydroenergo, it is the fifth and largest station in the Dnieper reservoir cascade, a series of hydroelectric stations on the Dnieper river that supply power to the Donets–Kryvyi Rih industrial region. Its dam has a length of 760 metres (2,490 ft), a height of 60 metres (200 ft).
The dam elevates the Dnieper river by 37.5 metres (123 ft) and maintains the water level of the Dnieper Reservoir, which has a volume of 3.3 km3 and stretches 129 kilometres (80 mi) upstream to the nearby city of Dnipro. The reservoir's two shipping canals—the disused original one with three staircase locks and a newer one with one staircase lock—allow ships to bypass the dam at its eastern end and sail upstream as far as the Pripyat River. A highway on the dam and bridge over the shipping canals enable vehicles to cross the Dnieper.
The electric station was built by the Soviet Union from 1927 to 1932. After being destroyed during World War II to make it harder for advancing German forces to cross the river and to hamstring their occupation by removing 19% of regional network capacity, it was rebuilt from 1944 to 1950. An expansion built from 1969 to 1980 quadrupled the station's output, with further modernization renovations conducted in the 1990s. In 2024, after being hit by Russian missiles, power output at the Dnieper Hydroelectric Station came to a halt.
In the lower reaches of the Dnieper River, there was an almost 100-kilometre (62 mi)-long stretch that was filled with the Dnieper Rapids. This is approximately the distance between the modern cities Dnipro and Zaporizhzhia. During the 19th century, engineers worked on the projects to make the river navigable. Projects for flooding the rapids were proposed by N. Lelyavsky in 1893, V. Timonov in 1894, S. Maximov and Genrikh Graftio in 1905, A. Rundo and D. Yuskevich in 1910, I. Rozov and L. Yurgevich in 1912, Mohylko.
While the main objective of these projects was to improve navigation, hydroelectric power generation was developed concurrently, in terms of the "utilization of the freely flowing water". G. Graftio's 1905 project included three dams with a small area of flooding.
The Dneprostroi Dam was built on vacated land in the countryside at the old river crossing known as Kichkas just north of Khortytsia island. The reason for building it was to stimulate Soviet industrialization. A special company was formed called Dniprobud or Dneprostroi (hence the dam's alternative name) that later built other dams on the Dnieper and exists to this day. The design for the dam that was accepted dates back to the USSR GOELRO electrification plan which was adopted in the early 1920s. The station was designed by a group of engineers headed by Prof. Ivan Alexandrov, a chief expert of GOELRO, who later became a head of the RSFSR State Planning Commission. The station was planned to provide electricity for several aluminium production plants and a high quality iron and steel plant that were also to be constructed in the area.
The DniproHES project used the experience gained from the construction of the Sir Adam Beck Hydroelectric Power Stations at Niagara Falls, Ontario, the Hydroelectric Island Maligne, Quebec, and the La Gabelle Generating Station on the St. Maurice River. On 17 September 1932, the Soviet government awarded six American engineers (including Hugh Cooper, William V. Murphy, and G. Thompson, engineers of General Electric) with the Order of the Red Banner of Labour for "the outstanding work in the construction of DniproHES".
Soviet industrialization was accompanied by a wide propaganda effort. Leon Trotsky, by then out of power, campaigned for the idea within the ruling Politburo in early 1926. In a speech to the Komsomol youth movement, he said: