The East London line is a railway line running north to south through the East, Docklands and South areas of London. It is used by London Overground services. It was previously a line of the London Underground.

Built in 1869 by the East London Railway Company, which reused the Thames Tunnel intended for horse-drawn carriages, the line became part of the London Underground network in 1933. After nearly 75 years as part of that network, it closed on 22 December 2007 for an extensive refurbishment and expansion, reopening as part of the Overground network in April 2010. Phase 2, which links the line to the South London line with a terminus at Clapham Junction, opened on 9 December 2012, creating an orbital railway around inner London.

In 2024, London Overground services on the line were rebranded the Windrush line.

The East London Railway (ELR) was created by the East London Railway Company, a consortium of six railway companies: the Great Eastern Railway (GER), the London, Brighton and South Coast Railway (LB&SCR), the London, Chatham and Dover Railway (LCDR), the South Eastern Railway (SER), the Metropolitan Railway, and the District Railway. The latter two operated what are now the Metropolitan, Circle, District and Hammersmith & City lines of the London Underground. The incorporation of the East London Railway took place on 26 May 1865 with the aim of providing a link between the LB&SCR, GER and SER lines.

The companies reused the Thames Tunnel, built by Marc and Isambard Kingdom Brunel between 1825 and 1843 for horse-drawn carriages. The tunnel, with generous headroom and two carriageways separated by arches, connected Wapping on the north bank of the Thames with Rotherhithe on the south bank. A triumph of civil engineering, it was a commercial failure and by the 1860s it had become an unpleasant and disreputable place.

The tunnel was the most easterly land connection between the north and south banks of the Thames, close to the docks on both banks of the river, and was not far from mainline railways at either end. Converting the tunnel for railway use thus offered a means of providing a cross-Thames rail link. On 25 September 1865 the East London Railway Company took ownership of the tunnel at a cost of £800,000. Over the next four years the company built a railway through the tunnel to connect with the existing lines. The company's engineer was Sir John Hawkshaw, who was also responsible for the major re-design and completion of I K Brunel's long-abandoned Clifton Suspension Bridge at Bristol. The section of the railway construction work from Wapping to Bishopsgate, which was very difficult, was carried out by the firm "T. & C. Walker and Co." (Thomas Andrew Walker and his younger brother Charles).

The line opened in stages as financing became available:

The East London Railway Company owned the infrastructure but it was operated by its controlling railways. Steam trains were initially operated by the GER, LB&SCR and the SER. The LB&SCR used its LBSCR A1 Class Terrier locomotives, which William Stroudley designed partly with this line in mind. It carried both passenger and goods trains; the LB&SCR operated between Liverpool Street and Croydon, the SER running between Addiscombe and Liverpool Street from April 1880 until March 1884. From March to September 1884 the SER service ran from Addiscombe to St Mary's (MR & MDR Joint Station). Metropolitan Railway services from St Mary's to New Cross (SER) and Metropolitan District Railway services from St Mary's to New Cross Gate (LB&SCR) commenced on 1 October 1884. On 6 October through services started from Hammersmith (Hammersmith & City) to New Cross (SER) and from Hammersmith (MDR) to New Cross (LB&SCR).