Extended Duration Orbiter
The Extended Duration Orbiter (EDO) program was a project by NASA to prepare for long-term (months) microgravity research aboard Space Station Freedom, which later evolved into the International Space Station. Scientists and NASA needed practical experience in managing progressively longer times for their experiments. The original Space Shuttle configuration usually provided a week to ten days of spaceflight. Several research projects and hardware components were part of the project, of which the EDO-pallet was one of the most visible, contracted by Rockwell International.
The first orbiter outfitted with the EDO hardware configuration was Endeavour, during its construction, and its last EDO flight was STS-67, in 1995. Endeavour's EDO modifications were removed in 1996 as part of routine maintenance, to reduce the orbiter's weight prior to STS-89. Columbia was outfitted for EDO flight during its maintenance period from August 10, 1991, through February 9, 1992, prior to STS-50, which was the first EDO flight. From 1992, through 1994, Atlantis went through a maintenance period, during which Atlantis was modified to have the provisions needed for EDO capability, but NASA chose not to proceed with the final modifications, and Atlantis never had EDO capability. The EDO-pallet used in these orbiter configurations was destroyed in the 2003 Columbia disaster.
The Extended Duration Orbiter Cryogenic kit (EDO-pallet or CRYO) was a 15-foot-diameter (4.6 m) equipment assembly which attached vertically to the payload bay rear bulkhead of an orbiter, and allowed the orbiter to support a flight of up to 16 days duration. The equipment included cryogenic tanks, associated control panels, and avionics equipment. Although Atlantis was partially upgraded to accommodate the EDO, only Columbia and Endeavour actually flew with the pallet. The pallet made its debut on STS-50, and was lost on STS-107 in 2003.
Initially, NASA considered adding a second EDO pallet to Endeavour, placed in front of the first, for a total of thirteen tank sets, that would have allowed an orbiter to remain in space for 28 days, but managers decided against it when the International Space Station assembly began, and instead removed the EDO capability from the orbiter, to reduce its weight and allow it to carry more cargo to the ISS.
No replacement for the pallet was planned, since the Station-to-Shuttle Power Transfer System provided much of the same abilities, and the 2011 retirement of the shuttle fleet made it unnecessary.
The EDO tanks stored 368 pounds (167 kg) of liquid hydrogen at −418 degrees Fahrenheit (−250.0 °C), and 3,124 pounds (1,417 kg) of liquid oxygen at −285 degrees Fahrenheit (−176.1 °C). Total empty weight of the system was 3,571 pounds (1,620 kg). When filled with cryogens, the system weight was approximately 7,000 pounds (3.2 t).
The EDO pallet was designed to augment the orbiter's endurance for prolonged missions by supplying additional hydrogen and oxygen for its fuel cells. These fuel cells, in turn, converted hydrogen and oxygen into electrical energy essential for the orbiter's operations. For instance, during STS-80, 5,856 kWh was produced from 3,989 lb of oxygen and 502 lb of hydrogen. For STS-50, 6,204.7 kWh was generated from 4,367 lb of oxygen and 550 lb of hydrogen. In comparison, STS-77, a mission without the EDO pallet, yielded 3,924 kWh from 2,745 lb of oxygen and 346 lb of hydrogen.
Another byproduct of the fuel cell operation was potable water. STS-77 produced 3,091 lb, while missions utilizing the EDO pallet, such as STS-50 and STS-80, yielded 4,914.6 lb and 4,492 lb, respectively.
Hub AI
Extended Duration Orbiter AI simulator
(@Extended Duration Orbiter_simulator)
Extended Duration Orbiter
The Extended Duration Orbiter (EDO) program was a project by NASA to prepare for long-term (months) microgravity research aboard Space Station Freedom, which later evolved into the International Space Station. Scientists and NASA needed practical experience in managing progressively longer times for their experiments. The original Space Shuttle configuration usually provided a week to ten days of spaceflight. Several research projects and hardware components were part of the project, of which the EDO-pallet was one of the most visible, contracted by Rockwell International.
The first orbiter outfitted with the EDO hardware configuration was Endeavour, during its construction, and its last EDO flight was STS-67, in 1995. Endeavour's EDO modifications were removed in 1996 as part of routine maintenance, to reduce the orbiter's weight prior to STS-89. Columbia was outfitted for EDO flight during its maintenance period from August 10, 1991, through February 9, 1992, prior to STS-50, which was the first EDO flight. From 1992, through 1994, Atlantis went through a maintenance period, during which Atlantis was modified to have the provisions needed for EDO capability, but NASA chose not to proceed with the final modifications, and Atlantis never had EDO capability. The EDO-pallet used in these orbiter configurations was destroyed in the 2003 Columbia disaster.
The Extended Duration Orbiter Cryogenic kit (EDO-pallet or CRYO) was a 15-foot-diameter (4.6 m) equipment assembly which attached vertically to the payload bay rear bulkhead of an orbiter, and allowed the orbiter to support a flight of up to 16 days duration. The equipment included cryogenic tanks, associated control panels, and avionics equipment. Although Atlantis was partially upgraded to accommodate the EDO, only Columbia and Endeavour actually flew with the pallet. The pallet made its debut on STS-50, and was lost on STS-107 in 2003.
Initially, NASA considered adding a second EDO pallet to Endeavour, placed in front of the first, for a total of thirteen tank sets, that would have allowed an orbiter to remain in space for 28 days, but managers decided against it when the International Space Station assembly began, and instead removed the EDO capability from the orbiter, to reduce its weight and allow it to carry more cargo to the ISS.
No replacement for the pallet was planned, since the Station-to-Shuttle Power Transfer System provided much of the same abilities, and the 2011 retirement of the shuttle fleet made it unnecessary.
The EDO tanks stored 368 pounds (167 kg) of liquid hydrogen at −418 degrees Fahrenheit (−250.0 °C), and 3,124 pounds (1,417 kg) of liquid oxygen at −285 degrees Fahrenheit (−176.1 °C). Total empty weight of the system was 3,571 pounds (1,620 kg). When filled with cryogens, the system weight was approximately 7,000 pounds (3.2 t).
The EDO pallet was designed to augment the orbiter's endurance for prolonged missions by supplying additional hydrogen and oxygen for its fuel cells. These fuel cells, in turn, converted hydrogen and oxygen into electrical energy essential for the orbiter's operations. For instance, during STS-80, 5,856 kWh was produced from 3,989 lb of oxygen and 502 lb of hydrogen. For STS-50, 6,204.7 kWh was generated from 4,367 lb of oxygen and 550 lb of hydrogen. In comparison, STS-77, a mission without the EDO pallet, yielded 3,924 kWh from 2,745 lb of oxygen and 346 lb of hydrogen.
Another byproduct of the fuel cell operation was potable water. STS-77 produced 3,091 lb, while missions utilizing the EDO pallet, such as STS-50 and STS-80, yielded 4,914.6 lb and 4,492 lb, respectively.