Oshkosh M-ATV
The Oshkosh M-ATV is a mine-resistant ambush protected (MRAP) vehicle developed by the Oshkosh Corporation for the MRAP All Terrain Vehicle (M-ATV) program. Intended to replace M1114 HMMWVs (Humvee), it is designed to provide the same levels of protection as the larger and heavier previous MRAPs, but with improved mobility.
In the summer of 2008, the U.S. Department of Defense (DoD) began to examine the possibility of developing and procuring a lighter-weight, all-terrain capable MRAP variant to address the poor roads and difficult terrain of Afghanistan. Source selection activity considered responses from more than 20 companies to a Request for Information (RFI)/market survey dated 21 August 2008 and in mid-November 2008 the U.S. government issued a pre-solicitation for an M-ATV. In early December 2008 the M-ATV formal Request for Proposals (RFP) was issued. The original M-ATV program requirement was for between 372 and 10,000 vehicles, with the most probable production quantity stated as 2,080.
In March 2009, it became known that two each of six different vehicle types (from five manufacturers) had been delivered to the U.S. Army for two months of evaluation, at the conclusion of which up to five ID/IQ (Indefinite Delivery/Indefinite Quantity) contracts would be awarded. In addition to Oshkosh's proposal, BAE Systems submitted two proposals: a Joint Light Tactical Vehicle (JLTV) derived design and an FMTV-based Caiman derivative. Force Dynamics (a Force Protection/General Dynamics Land Systems (GDLS) joint venture) offered the Cheetah, GDLS-C (Canada) offered an RG-31 MRAP derivative, and Navistar offered an MXT-based solution.
After GDLS-C's RG-31 was eliminated from the competition in May 2009, it was announced that the five remaining bidders had been awarded ID/IQ contracts, and were each to deliver three production-ready test vehicles for the next stage of the competition. At the completion of testing, the U.S. DoD stated that it planned to select a single M-ATV producer but could, at its discretion, place production orders with multiple producers as it had done with the initial MRAP procurement. On 30 June 2009, the M-ATV contract award was announced with a single ID/IQ contract award to Oshkosh. Brigadier General Michael Brogan, United States Marine Corps program officer for MRAP, stated that the Oshkosh M-ATV was chosen because it had the best survivability and Oshkosh had the best technical and manufacturing capabilities of all the competitors. The Oshkosh bid was also the second cheapest.
The initial M-ATV delivery order was valued at over $1 billion and included 2,244 M-ATVs. The overall M-ATV requirement had increased in early June from 2,080 to 5,244 M-ATVs, these split 2,598 (Army), 1,565 (Marines), 643 (U.S. Special Operations Command), 280 (Air Force), 65 (Navy), and 93 for testing.
In July 2009, the first 46 M-ATVs were delivered, and in November the 1,000th M-ATV was handed over. Oshkosh reached its contractual obligation to produce 1,000 M-ATVs per month ahead of schedule in December 2009, and by using its existing manufacturing facilities in Oshkosh, WI (50%), and making use of its recession-hit JLG telescopic handler facility in McConnellsburg, PA (50%). The first vehicles arrived in Afghanistan in October 2009 and were to be all delivered by March 2010.
In total 8,722 M-ATVs were delivered to the U.S. Army, U.S. Marine Corps, U.S. Air Force, and U.S. Special Operations Command (SOCOM). M-ATVs were delivered in two main variants. The base model is designated M1240 with the Objective Gunner Protection Kit [OGPK] manned turret; it is designated M1240A1 when fitted with the Underbody Improvement Kit (UIK). The second main variant is designated M1277 and is fitted with M153 CROWS remote-controlled weapon station (RCWS). Produced in smaller numbers, the SOCOM-specific variant is designated M1245; M1245A1 with UIK fitted.
As part of the overall divestiture of the MRAP fleet, the U.S. Government will keep about 80% (around 7,000) of the M-ATV fleet, 5,651 of these (inc. 250 for SOCOM) to be retained by the Army. Work is currently underway at Oshkosh's Wisconsin facility and the Red River Army Depot to reset the around 7,000 M-ATVs retained to a common build standard. Oshkosh was awarded an initial 500-vehicle M-ATV Reset contract in August 2014. Three additional contract options for 100 vehicles each were awarded in December 2014. Total contract value is in excess of US$77 million. Deliveries were scheduled to continue through September 2015.
Hub AI
Oshkosh M-ATV AI simulator
(@Oshkosh M-ATV_simulator)
Oshkosh M-ATV
The Oshkosh M-ATV is a mine-resistant ambush protected (MRAP) vehicle developed by the Oshkosh Corporation for the MRAP All Terrain Vehicle (M-ATV) program. Intended to replace M1114 HMMWVs (Humvee), it is designed to provide the same levels of protection as the larger and heavier previous MRAPs, but with improved mobility.
In the summer of 2008, the U.S. Department of Defense (DoD) began to examine the possibility of developing and procuring a lighter-weight, all-terrain capable MRAP variant to address the poor roads and difficult terrain of Afghanistan. Source selection activity considered responses from more than 20 companies to a Request for Information (RFI)/market survey dated 21 August 2008 and in mid-November 2008 the U.S. government issued a pre-solicitation for an M-ATV. In early December 2008 the M-ATV formal Request for Proposals (RFP) was issued. The original M-ATV program requirement was for between 372 and 10,000 vehicles, with the most probable production quantity stated as 2,080.
In March 2009, it became known that two each of six different vehicle types (from five manufacturers) had been delivered to the U.S. Army for two months of evaluation, at the conclusion of which up to five ID/IQ (Indefinite Delivery/Indefinite Quantity) contracts would be awarded. In addition to Oshkosh's proposal, BAE Systems submitted two proposals: a Joint Light Tactical Vehicle (JLTV) derived design and an FMTV-based Caiman derivative. Force Dynamics (a Force Protection/General Dynamics Land Systems (GDLS) joint venture) offered the Cheetah, GDLS-C (Canada) offered an RG-31 MRAP derivative, and Navistar offered an MXT-based solution.
After GDLS-C's RG-31 was eliminated from the competition in May 2009, it was announced that the five remaining bidders had been awarded ID/IQ contracts, and were each to deliver three production-ready test vehicles for the next stage of the competition. At the completion of testing, the U.S. DoD stated that it planned to select a single M-ATV producer but could, at its discretion, place production orders with multiple producers as it had done with the initial MRAP procurement. On 30 June 2009, the M-ATV contract award was announced with a single ID/IQ contract award to Oshkosh. Brigadier General Michael Brogan, United States Marine Corps program officer for MRAP, stated that the Oshkosh M-ATV was chosen because it had the best survivability and Oshkosh had the best technical and manufacturing capabilities of all the competitors. The Oshkosh bid was also the second cheapest.
The initial M-ATV delivery order was valued at over $1 billion and included 2,244 M-ATVs. The overall M-ATV requirement had increased in early June from 2,080 to 5,244 M-ATVs, these split 2,598 (Army), 1,565 (Marines), 643 (U.S. Special Operations Command), 280 (Air Force), 65 (Navy), and 93 for testing.
In July 2009, the first 46 M-ATVs were delivered, and in November the 1,000th M-ATV was handed over. Oshkosh reached its contractual obligation to produce 1,000 M-ATVs per month ahead of schedule in December 2009, and by using its existing manufacturing facilities in Oshkosh, WI (50%), and making use of its recession-hit JLG telescopic handler facility in McConnellsburg, PA (50%). The first vehicles arrived in Afghanistan in October 2009 and were to be all delivered by March 2010.
In total 8,722 M-ATVs were delivered to the U.S. Army, U.S. Marine Corps, U.S. Air Force, and U.S. Special Operations Command (SOCOM). M-ATVs were delivered in two main variants. The base model is designated M1240 with the Objective Gunner Protection Kit [OGPK] manned turret; it is designated M1240A1 when fitted with the Underbody Improvement Kit (UIK). The second main variant is designated M1277 and is fitted with M153 CROWS remote-controlled weapon station (RCWS). Produced in smaller numbers, the SOCOM-specific variant is designated M1245; M1245A1 with UIK fitted.
As part of the overall divestiture of the MRAP fleet, the U.S. Government will keep about 80% (around 7,000) of the M-ATV fleet, 5,651 of these (inc. 250 for SOCOM) to be retained by the Army. Work is currently underway at Oshkosh's Wisconsin facility and the Red River Army Depot to reset the around 7,000 M-ATVs retained to a common build standard. Oshkosh was awarded an initial 500-vehicle M-ATV Reset contract in August 2014. Three additional contract options for 100 vehicles each were awarded in December 2014. Total contract value is in excess of US$77 million. Deliveries were scheduled to continue through September 2015.