Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Hub AI
Point Defiance Bypass AI simulator
(@Point Defiance Bypass_simulator)
Hub AI
Point Defiance Bypass AI simulator
(@Point Defiance Bypass_simulator)
Point Defiance Bypass
The Point Defiance Bypass (officially the Lakeview Subdivision) is a 14.5-mile-long (23.3 km) rail line between the cities of DuPont and Tacoma in Pierce County, Washington. It was originally built by the Northern Pacific Railway – the Tacoma–Lakewood segment in 1874 as part of the Prairie Line, and the Lakewood–DuPont section in 1891. Passenger service on the lines declined after the 1914 completion of a flatter route along Puget Sound, and ended entirely in 1956.
The route was identified as a passenger rail bypass in 1992. Sounder commuter rail service to Lakewood began in 2012. The $181.1 million improvement of the remaining section began construction in 2015 as part of general improvements to the Amtrak Cascades corridor to eliminate the slow and winding route along the Puget Sound shoreline that included single-track tunnels. It was opened for Amtrak service on December 18, 2017, but the first Cascades train derailed at speed on a bridge over Interstate 5 while traveling southbound near DuPont. Amtrak service was rerouted to the old line until passenger service resumed on November 18, 2021.
The Point Defiance Bypass begins at a junction with the BNSF mainline near the Nisqually River bridge, east of Lacey. The railway crosses over Interstate 5 and travels along the freeway's north side through DuPont and Joint Base Lewis–McChord (JBLM). In Lakewood, it stops at a train station and turns north, merging with the Tacoma Rail mainline. Trains continue north through South Tacoma station and follow South Tacoma Way as it makes a gradual turn to the east. The bypass passes under State Route 16 and over Pacific Avenue while approaching Tacoma Dome Station. The railway travels over the Dome District area of Tacoma along a high trestle bridge and rejoins the BNSF mainline near the Puyallup River bridge.
The project included the construction of five upgraded at-grade crossings and several grade-separated overpasses and underpasses along Interstate 5 in Dupont and near JBLM.
The Northern Pacific Railway (NP) opened the Prairie Line – part of its planned transcontinental mainline – through Yelm and Lakewood on January 5, 1874. On May 1, 1891, the NP-owned Tacoma, Olympia & Grays Harbor Railroad completed a 24.7-mile-long (39.8 km) branch of the Northern Pacific between Lakeview (near modern Lakewood) and Lacey, passing through the Fort Lewis military base. By 1914, the NP (plus the GN and UP under trackage rights) operated 11 daily round trips over the Prairie Line, plus 3 daily round trips to Grays Harbor over the newer branch.
Just south of Tacoma, the Prairie Line had a 2.2-mile (3.5 km) section of difficult 2.2% grade. In 1914, the NP opened the Point Defiance Line along the coast of Puget Sound and around Point Defiance. Part of the line to Grays Harbor was used by the new line; the section between DuPont and Lakewood became the American Lake Branch. Most NP and UP passenger and freight service moved to the newer, flatter line. On August 8, 1943, the GN moved its remaining Seattle–Portland round trip to the Point Defiance Line, leaving only NP trains to Grays Harbor on the old line. Those trains were discontinued in February 1956, leaving the American Lake Branch and the Tacoma–Tenino section of the Prairie Line used only by freight service. The GN and NP were merged into the Burlington Northern Railway (BN) in 1970. In 1973, the BN increased clearances on the Point Defiance Line, allowing trains carrying Boeing aircraft parts to use that line. Long-distance freight service was removed from the Prairie Line, and it was abandoned south of Yelm in 1986.
The Point Defiance Line, however, proved not to be ideal for Amtrak passenger service. Mudslides frequently closed the line, and the 1988 conversion of two tunnels to single track to further increase freight clearances limited capacity. In 1992, the Washington State Department of Transportation (WSDOT) identified the American Lake Branch and the northern section of the Prairie Line as a potential alignment for a new Amtrak bypass of Point Defiance. In April 2003, the BNSF Railway (the successor to the BN) removed the remaining 2.1 miles (3.4 km) of the Prairie Line in Tacoma from service, thus allowing Sound Transit to build the Tacoma Link without an expensive level crossing. In return, Sound Transit funded repairs to the American Lake Branch for continued BNSF freight service to Fort Lewis, while Tacoma Rail took over freight service on the line in Tacoma. BNSF sold the Tacoma–Lakewood section to Sound Transit for commuter rail use in 2004 for $13.4 million, with BNSF retaining a freight easement. This sale was part of a larger, $32 million purchase of 21 miles of BNSF track between Tacoma and the Nisqually River (at the border between Pierce County and Thurston County).
WSDOT published a long-range plan for the Amtrak Cascades corridor in 2006, outlining a series of projects needed before reactivating passenger rail service on the line. The projects, known collectively as the Point Defiance Bypass, included rebuilding of tracks and ties, a new signal system, improvements to at-grade crossings, and a $230 million bridge to replace a viaduct crossing Interstate 5 on a tight curve near the Nisqually River. The project ultimately did not include the Nisqually bridge, which became the site of the 2017 derailment.
Point Defiance Bypass
The Point Defiance Bypass (officially the Lakeview Subdivision) is a 14.5-mile-long (23.3 km) rail line between the cities of DuPont and Tacoma in Pierce County, Washington. It was originally built by the Northern Pacific Railway – the Tacoma–Lakewood segment in 1874 as part of the Prairie Line, and the Lakewood–DuPont section in 1891. Passenger service on the lines declined after the 1914 completion of a flatter route along Puget Sound, and ended entirely in 1956.
The route was identified as a passenger rail bypass in 1992. Sounder commuter rail service to Lakewood began in 2012. The $181.1 million improvement of the remaining section began construction in 2015 as part of general improvements to the Amtrak Cascades corridor to eliminate the slow and winding route along the Puget Sound shoreline that included single-track tunnels. It was opened for Amtrak service on December 18, 2017, but the first Cascades train derailed at speed on a bridge over Interstate 5 while traveling southbound near DuPont. Amtrak service was rerouted to the old line until passenger service resumed on November 18, 2021.
The Point Defiance Bypass begins at a junction with the BNSF mainline near the Nisqually River bridge, east of Lacey. The railway crosses over Interstate 5 and travels along the freeway's north side through DuPont and Joint Base Lewis–McChord (JBLM). In Lakewood, it stops at a train station and turns north, merging with the Tacoma Rail mainline. Trains continue north through South Tacoma station and follow South Tacoma Way as it makes a gradual turn to the east. The bypass passes under State Route 16 and over Pacific Avenue while approaching Tacoma Dome Station. The railway travels over the Dome District area of Tacoma along a high trestle bridge and rejoins the BNSF mainline near the Puyallup River bridge.
The project included the construction of five upgraded at-grade crossings and several grade-separated overpasses and underpasses along Interstate 5 in Dupont and near JBLM.
The Northern Pacific Railway (NP) opened the Prairie Line – part of its planned transcontinental mainline – through Yelm and Lakewood on January 5, 1874. On May 1, 1891, the NP-owned Tacoma, Olympia & Grays Harbor Railroad completed a 24.7-mile-long (39.8 km) branch of the Northern Pacific between Lakeview (near modern Lakewood) and Lacey, passing through the Fort Lewis military base. By 1914, the NP (plus the GN and UP under trackage rights) operated 11 daily round trips over the Prairie Line, plus 3 daily round trips to Grays Harbor over the newer branch.
Just south of Tacoma, the Prairie Line had a 2.2-mile (3.5 km) section of difficult 2.2% grade. In 1914, the NP opened the Point Defiance Line along the coast of Puget Sound and around Point Defiance. Part of the line to Grays Harbor was used by the new line; the section between DuPont and Lakewood became the American Lake Branch. Most NP and UP passenger and freight service moved to the newer, flatter line. On August 8, 1943, the GN moved its remaining Seattle–Portland round trip to the Point Defiance Line, leaving only NP trains to Grays Harbor on the old line. Those trains were discontinued in February 1956, leaving the American Lake Branch and the Tacoma–Tenino section of the Prairie Line used only by freight service. The GN and NP were merged into the Burlington Northern Railway (BN) in 1970. In 1973, the BN increased clearances on the Point Defiance Line, allowing trains carrying Boeing aircraft parts to use that line. Long-distance freight service was removed from the Prairie Line, and it was abandoned south of Yelm in 1986.
The Point Defiance Line, however, proved not to be ideal for Amtrak passenger service. Mudslides frequently closed the line, and the 1988 conversion of two tunnels to single track to further increase freight clearances limited capacity. In 1992, the Washington State Department of Transportation (WSDOT) identified the American Lake Branch and the northern section of the Prairie Line as a potential alignment for a new Amtrak bypass of Point Defiance. In April 2003, the BNSF Railway (the successor to the BN) removed the remaining 2.1 miles (3.4 km) of the Prairie Line in Tacoma from service, thus allowing Sound Transit to build the Tacoma Link without an expensive level crossing. In return, Sound Transit funded repairs to the American Lake Branch for continued BNSF freight service to Fort Lewis, while Tacoma Rail took over freight service on the line in Tacoma. BNSF sold the Tacoma–Lakewood section to Sound Transit for commuter rail use in 2004 for $13.4 million, with BNSF retaining a freight easement. This sale was part of a larger, $32 million purchase of 21 miles of BNSF track between Tacoma and the Nisqually River (at the border between Pierce County and Thurston County).
WSDOT published a long-range plan for the Amtrak Cascades corridor in 2006, outlining a series of projects needed before reactivating passenger rail service on the line. The projects, known collectively as the Point Defiance Bypass, included rebuilding of tracks and ties, a new signal system, improvements to at-grade crossings, and a $230 million bridge to replace a viaduct crossing Interstate 5 on a tight curve near the Nisqually River. The project ultimately did not include the Nisqually bridge, which became the site of the 2017 derailment.