Tehri Dam

The Tehri Dam is a multi-purpose rock and earth-fill embankment dam on the Bhagirathi River in New Tehri, Tehri Garhwal district in Uttarakhand, India. With a height of 260.5 m (855 ft), it is the tallest dam in India and the 13th-tallest dam in the world. It is the primary dam of THDC India Ltd. and the Tehri hydroelectric complex. The dam begun construction in 1978 and was completed in 2006. It withholds a reservoir for irrigation, municipal water supply and the generation of 1,000 megawatts (1,300,000 hp) of hydroelectricity. The dam's 1,000 MW variable-speed pumped-storage scheme is currently under construction, with the commissioning of the first two units was expected to be completed in 2023, which got finished in March 2024, and the rest to be done by 2025.

A preliminary investigation for the Tehri Dam Project was completed in 1961 under Jawahar lal Nehru's ministry's and its design was completed in 1972 with a 600 MW capacity power plant based on the study. Construction began in 1978 after feasibility studies but was delayed due to financial, environmental and social impacts.

In 1986, technical and financial assistance was provided by the USSR, but this was interrupted years later with political instability. India was forced to take control of the project and at the first, it was placed under the direction of the Irrigation Department of Uttar Pradesh. However, in 1988 the Tehri Hydro Development Corporation was formed to manage the dam and 75% of the funding would be provided by the federal government, 25% by the state. Uttar Pradesh would finance the entire irrigation portion of the project.

Tehri Dam is a 260.5 m (855 ft) high rock and earth-fill embankment dam. Its length is 575 m (1,886 ft), crest width 20 m (66 ft), and base width 1,128 m (3,701 ft). The dam creates a reservoir of 3.54 cubic kilometres (2,870,000 acre⋅ft) with a surface area of 52 km2 (20 sq mi). The installed hydrocapacity is 1,000 MW along with an additional 1,000 MW of pumped storage hydroelectricity. The lower reservoir for the pumped-storage plant is created by the Koteshwar Dam downstream.

The Tehri Dam and the Tehri Pumped Storage Hydroelectric Power Plant are part of the Tehri Hydropower Complex which also includes the 400 MW Koteshwar Dam. Tehri pumped storage plant (4 X 250 MW) has variable speed features which can optimize the round trip efficiency under varying water levels in its reservoirs. Power is distributed to Uttar Pradesh, Uttarakhand, Punjab, Delhi, Haryana, Jammu and Kashmir, Chandigarh, Rajasthan and Himachal Pradesh . The complex will afford irrigation to an area of 270,000 hectares (670,000 acres), irrigation stabilization to an area of 600,000 hectares (1,500,000 acres), and a supply of 270 million imperial gallons (1.2×10^6 m3) of drinking water per day to the industrialized areas of Delhi, Uttar Pradesh and Uttarakhand.

The total expenditure for this project was US$1 billion.

The scheduling and dispatch of the Tehri Hydro Power plant is done by Northern Regional Load Dispatch Center (NRLDC), which is the apex body to ensure the integrated operation of the power system grid in the Northern region and comes under Power System Operation Corporation Limited (POSOCO). At present, THDC India Ltd. is generating around 3,000 GWh annually from this dam.

The Tehri Dam has been the object of protests by environmental organizations and local people of the region. Virendra Dutt Saklani, lawyer and founder of the Anti-Tehri Dam Struggle Committee, was quick to point out the consequences associated to the large project. Environmental activist Sunderlal Bahuguna led the Anti-Tehri Dam movement from 1980s till 2004. The protest was against the displacement of town inhabitants and environmental consequence of the weak ecosystem.