USS Constellation (CVA-64/CV-64) was a Kitty Hawk-class supercarrier and the third ship of the United States Navy to be named in honor of the "new constellation of stars" on the flag of the United States. One of the fastest ships in the Navy, as proven by her victory during a battlegroup race held in 1985, she was nicknamed "Connie" by her crew and officially as "America's Flagship".
The contract to build Constellation was awarded to the New York Naval Shipyard on 1 July 1956, and her keel was laid down 14 September 1957 at the New York Navy Yard. She was christened and launched 8 October 1960, sponsored by Mary Herter (wife of Secretary of State Christian Herter). Constellation was delivered to the Navy 1 October 1961, and commissioned on 27 October 1961, with Captain T. J. Walker in command. At that time, she had cost about US$264.5 million. Constellation was the last conventional U.S. aircraft carrier (as of January 2021) to be built at a yard other than Newport News Shipbuilding & Drydock Company. Constellation was scrapped at Brownsville, Texas, in 2015–2017.
The keel of Constellation was laid down at New York Naval Shipyard in 1957.
USS Constellation was heavily damaged by fire while under construction on 19 December 1960. The carrier was in the final stages of construction at the Brooklyn Navy Yard in Brooklyn, New York when the fire began.
The fire broke out when a forklift operating on the hangar deck accidentally pushed its cargo into a steel plate knocking it over. The plate then broke off the plug of a 500 US gallons (1,900 L; 420 imp gal) tank of diesel fuel which spilled from the container reaching the lower levels of the ship. The fuel was ignited perhaps by a cutting torch of a fitter, and then moved to a wooden scaffolding. The flames spread quickly, filling the passageways of the ship with smoke. A Navy commander commented on the nature of the ship's design at an inquiry, "Ships of this class are the most complex structures ever designed by man."
It took 17 hours for firefighters to extinguish the fire, some of whom had been "driven to the raw edge of exhaustion" after being called into service in the Park Slope air accident. The firefighters saved hundreds of lives without losing any of their own; however, 50 shipyard workers were killed. The extensive damage cost $75 million to repair, and delayed the commissioning date by seven months, leading to a rumor that the ship that had burned in New York was Kitty Hawk (CV-63) and the fire caused the Navy to change the names and hull number designations between the two sister ships that were being built simultaneously in separate shipyards in separate states. An abstract of a New York Times article from the day after the fire, 20 December 1960, refers to the ship as USS Constellation.
Constellation was launched 8 October 1960, and she was delivered to the Navy 1 October 1961. She was commissioned on 27 October 1961, with Captain T. J. Walker in command. Another fire occurred aboard Constellation on 7 November 1961, while she was being tested at sea, killing four and injuring nine others.
Following fitting out and acceptance trials, Constellation departed her home port of Norfolk, Virginia, on 7 February 1962 for initial air operations off the Virginia Capes. She conducted her first catapult launch and arrested landing the same day with Commander George C. Watkins, air group (CVG) 13 commander, at the controls of an A4D-2 Skyhawk of Attack Squadron 34. After a month of operating locally, Connie (as the carrier became known) conducted a two-month shakedown cruise in the Caribbean Sea.
Hub AI
USS Constellation (CV-64) AI simulator
(@USS Constellation (CV-64)_simulator)
USS Constellation (CV-64)
USS Constellation (CVA-64/CV-64) was a Kitty Hawk-class supercarrier and the third ship of the United States Navy to be named in honor of the "new constellation of stars" on the flag of the United States. One of the fastest ships in the Navy, as proven by her victory during a battlegroup race held in 1985, she was nicknamed "Connie" by her crew and officially as "America's Flagship".
The contract to build Constellation was awarded to the New York Naval Shipyard on 1 July 1956, and her keel was laid down 14 September 1957 at the New York Navy Yard. She was christened and launched 8 October 1960, sponsored by Mary Herter (wife of Secretary of State Christian Herter). Constellation was delivered to the Navy 1 October 1961, and commissioned on 27 October 1961, with Captain T. J. Walker in command. At that time, she had cost about US$264.5 million. Constellation was the last conventional U.S. aircraft carrier (as of January 2021) to be built at a yard other than Newport News Shipbuilding & Drydock Company. Constellation was scrapped at Brownsville, Texas, in 2015–2017.
The keel of Constellation was laid down at New York Naval Shipyard in 1957.
USS Constellation was heavily damaged by fire while under construction on 19 December 1960. The carrier was in the final stages of construction at the Brooklyn Navy Yard in Brooklyn, New York when the fire began.
The fire broke out when a forklift operating on the hangar deck accidentally pushed its cargo into a steel plate knocking it over. The plate then broke off the plug of a 500 US gallons (1,900 L; 420 imp gal) tank of diesel fuel which spilled from the container reaching the lower levels of the ship. The fuel was ignited perhaps by a cutting torch of a fitter, and then moved to a wooden scaffolding. The flames spread quickly, filling the passageways of the ship with smoke. A Navy commander commented on the nature of the ship's design at an inquiry, "Ships of this class are the most complex structures ever designed by man."
It took 17 hours for firefighters to extinguish the fire, some of whom had been "driven to the raw edge of exhaustion" after being called into service in the Park Slope air accident. The firefighters saved hundreds of lives without losing any of their own; however, 50 shipyard workers were killed. The extensive damage cost $75 million to repair, and delayed the commissioning date by seven months, leading to a rumor that the ship that had burned in New York was Kitty Hawk (CV-63) and the fire caused the Navy to change the names and hull number designations between the two sister ships that were being built simultaneously in separate shipyards in separate states. An abstract of a New York Times article from the day after the fire, 20 December 1960, refers to the ship as USS Constellation.
Constellation was launched 8 October 1960, and she was delivered to the Navy 1 October 1961. She was commissioned on 27 October 1961, with Captain T. J. Walker in command. Another fire occurred aboard Constellation on 7 November 1961, while she was being tested at sea, killing four and injuring nine others.
Following fitting out and acceptance trials, Constellation departed her home port of Norfolk, Virginia, on 7 February 1962 for initial air operations off the Virginia Capes. She conducted her first catapult launch and arrested landing the same day with Commander George C. Watkins, air group (CVG) 13 commander, at the controls of an A4D-2 Skyhawk of Attack Squadron 34. After a month of operating locally, Connie (as the carrier became known) conducted a two-month shakedown cruise in the Caribbean Sea.