Recent from talks
Contribute something to knowledge base
Content stats: 0 posts, 0 articles, 1 media, 0 notes
Members stats: 0 subscribers, 0 contributors, 0 moderators, 0 supporters
Subscribers
Supporters
Contributors
Moderators
Siliguri Corridor
The Siliguri Corridor, often dubbed the "Chicken's Neck", is a stretch of land around the city of Siliguri in West Bengal, India. 20–22 kilometres (12–14 mi) at the narrowest section, this geopolitical and geoeconomical corridor connects the seven states of northeast India to the rest of India. The countries of Nepal and Bangladesh lie on each side of the corridor and the Kingdom of Bhutan lies at the northern end of the corridor. The Kingdom of Sikkim formerly lay on the northern side of the corridor, until its merger with India in 1975.
The city of Siliguri is the major city in the area and the central transfer point connecting Bhutan, Nepal, Bangladesh, Sikkim, Darjeeling, Northeast India and mainland India. According to the Indian Army, the Siliguri Corridor is the Army's strongest defensive line.
The partition of India led to the formation of the Siliguri Corridor through the creation of East Pakistan (now Bangladesh) after the partition of Bengal (into East Bengal and West Bengal) in 1947–1948.
The Kingdom of Sikkim formerly lay on the northern side of the corridor, until its union with India in 1975 via a publicly held referendum. From Sikkim, India consolidated its control of the Chumbi Valley, along with Bhutan.
The dimensions of the corridor are a matter of interpretation. Descriptions give it an area of 170 by 60 km (106 by 37 mi) with the narrowest section being 20–22 km (12–14 mi). Kamal Jit Singh places the length at 200 km (120 mi) with a width of 17 to 60 km (11 to 37 mi), giving it an area of approximately 12,200 km2 (4,700 sq mi). Another description places its dimensions as approximately 200 km (120 mi) in length and 20 to 60 km (12 to 37 mi) wide, also giving it an area of approximately 12,200 km2 (4,700 sq mi).
The corridor is located between Bangladesh to the southwest, Nepal on the northwest, and Bhutan to the north. Between Sikkim and Bhutan lies the Chumbi Valley Tibetan territory. The southern end of the Dolam plateau or Doklam tri boundary area slopes into the corridor. At the narrowest stretch, the corridor is generally formed by the Mechi River in the east; Nepal's Bhadrapur lies on the banks of the river. Further north the Mechi Bridge connects Mechinagar.
India has embarked on a slew of projects. These include the construction of India-China Border Roads, where, as of 2024, multiple phases of border roads have been constructed, and Advance Landing Grounds (ALGs), such as the Nyoma Advanced Landing Ground, which is nearing completion as of 2024. Other projects include Northeastern India connectivity and Look-East transnational connectivity projects including BIMSTEC and BBIN to create multiple alternatives to Silliguri corridor, including through Bangladesh and the sea.
All land transportation between the rest of India and its far northeastern states uses this corridor. The route has a major broad gauge railway line. Electrification of this double-track corridor is in progress with assistance from the Central Organization for Railway Electrification (CORE). Additionally, the old metre gauge line (recently converted to a 1.676 metres (5 ft 6.0 in) broad-gauge line) connects Siliguri Junction with Islampur in the North Dinajpur district of West Bengal, via Bagdogra (the only airport of national interest in the corridor) and the bordering towns of Adhikari, Galgalia, Thakurganj, Naxalbari and Taiabpur with Nepal. As of 2024, to reduce dependence on the Siliguri Corridor, India is planning to build railway lines through Jogbani in Bihar, which would enter Biratnagar in Nepal and then connect with New Mal Junction in West Bengal. India is also developing railway lines through Bangladesh, which includes constructing new railway tracks and the gauge conversion of existing railway tracks, in order to reduce dependance on the Siliguri Corridor, as of 2024.
Siliguri Corridor
The Siliguri Corridor, often dubbed the "Chicken's Neck", is a stretch of land around the city of Siliguri in West Bengal, India. 20–22 kilometres (12–14 mi) at the narrowest section, this geopolitical and geoeconomical corridor connects the seven states of northeast India to the rest of India. The countries of Nepal and Bangladesh lie on each side of the corridor and the Kingdom of Bhutan lies at the northern end of the corridor. The Kingdom of Sikkim formerly lay on the northern side of the corridor, until its merger with India in 1975.
The city of Siliguri is the major city in the area and the central transfer point connecting Bhutan, Nepal, Bangladesh, Sikkim, Darjeeling, Northeast India and mainland India. According to the Indian Army, the Siliguri Corridor is the Army's strongest defensive line.
The partition of India led to the formation of the Siliguri Corridor through the creation of East Pakistan (now Bangladesh) after the partition of Bengal (into East Bengal and West Bengal) in 1947–1948.
The Kingdom of Sikkim formerly lay on the northern side of the corridor, until its union with India in 1975 via a publicly held referendum. From Sikkim, India consolidated its control of the Chumbi Valley, along with Bhutan.
The dimensions of the corridor are a matter of interpretation. Descriptions give it an area of 170 by 60 km (106 by 37 mi) with the narrowest section being 20–22 km (12–14 mi). Kamal Jit Singh places the length at 200 km (120 mi) with a width of 17 to 60 km (11 to 37 mi), giving it an area of approximately 12,200 km2 (4,700 sq mi). Another description places its dimensions as approximately 200 km (120 mi) in length and 20 to 60 km (12 to 37 mi) wide, also giving it an area of approximately 12,200 km2 (4,700 sq mi).
The corridor is located between Bangladesh to the southwest, Nepal on the northwest, and Bhutan to the north. Between Sikkim and Bhutan lies the Chumbi Valley Tibetan territory. The southern end of the Dolam plateau or Doklam tri boundary area slopes into the corridor. At the narrowest stretch, the corridor is generally formed by the Mechi River in the east; Nepal's Bhadrapur lies on the banks of the river. Further north the Mechi Bridge connects Mechinagar.
India has embarked on a slew of projects. These include the construction of India-China Border Roads, where, as of 2024, multiple phases of border roads have been constructed, and Advance Landing Grounds (ALGs), such as the Nyoma Advanced Landing Ground, which is nearing completion as of 2024. Other projects include Northeastern India connectivity and Look-East transnational connectivity projects including BIMSTEC and BBIN to create multiple alternatives to Silliguri corridor, including through Bangladesh and the sea.
All land transportation between the rest of India and its far northeastern states uses this corridor. The route has a major broad gauge railway line. Electrification of this double-track corridor is in progress with assistance from the Central Organization for Railway Electrification (CORE). Additionally, the old metre gauge line (recently converted to a 1.676 metres (5 ft 6.0 in) broad-gauge line) connects Siliguri Junction with Islampur in the North Dinajpur district of West Bengal, via Bagdogra (the only airport of national interest in the corridor) and the bordering towns of Adhikari, Galgalia, Thakurganj, Naxalbari and Taiabpur with Nepal. As of 2024, to reduce dependence on the Siliguri Corridor, India is planning to build railway lines through Jogbani in Bihar, which would enter Biratnagar in Nepal and then connect with New Mal Junction in West Bengal. India is also developing railway lines through Bangladesh, which includes constructing new railway tracks and the gauge conversion of existing railway tracks, in order to reduce dependance on the Siliguri Corridor, as of 2024.
