Northern Transcon
Northern Transcon
Main page
1573573

Northern Transcon

logo
Community Hub0 subscribers
Read side by side
from Wikipedia
Northern Transcon
The Empire Builder crosses the Two Medicine Trestle at East Glacier Park, Montana on the Hi Line Subdivision in 2011.
Overview
OwnerBNSF Railway
LocaleNorthwestern and Midwestern United States
Termini
Connecting lines
Service
Type
Operators
Technical
Number of tracks1–4
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Train protection systemPTC[1]

The Northern Transcon, a route operated by the BNSF Railway, traverses the most northerly route of any railroad in the western United States. This route was originally part of the Chicago, Burlington and Quincy Railroad, Northern Pacific Railway, Great Northern Railway and Spokane, Portland and Seattle Railway systems, merged into the Burlington Northern Railroad system in 1970.

Route

[edit]

The route starts at Chicago[2] and runs west across northern Illinois to the Mississippi River. It follows the eastern shore of the river through La Crosse and Prairie du Chien, Wisconsin before turning west again in Minneapolis and St. Paul, Minnesota to Casselton, North Dakota. From Casselton the route runs northwest to Minot, North Dakota, then west through Montana and Idaho to Spokane, Washington.

In Montana, the line passes the East Gate of Glacier National Park and crosses the Two Medicine River on a high trestle. From East Glacier Park, Montana, the route continues ascending until it crests the Continental Divide at the summit of Marias Pass. The line descends down the west side of the pass for 20 miles (32 km) to Essex, Montana, running mostly double track on a narrow shelf, and crossing several high trestles over the Flathead River. Essex is home to the Izaak Walton Inn, which was constructed when the line was built to shelter railroad employees during the winter months. It also contains a small railyard used to store helper engines, which are used to supply additional power to freight trains crossing Marias Pass. Prior to the invention of the powerful diesel locomotives used today, longer trains often had to be split in order to make it up the pass.

From Essex, the line follows the Flathead River valley to Whitefish, Montana. Located in Whitefish is a restored passenger depot/museum (also serving Amtrak). The line continues northwest to Stryker, Montana, then turns south and passes through the 7-mile-long (11 km) Flathead Tunnel as it runs west toward Sandpoint, Idaho. The line leaves the Rocky Mountains after Athol, Idaho and reaches Spokane, Washington.

At Spokane the route splits into two, with one line going to Seattle, Washington and the other to Portland, Oregon.

The two longest railroad tunnels in the country are along the Northern Transcon: the Flathead Tunnel through the Rocky Mountains in Montana and the new Cascade Tunnel through the Cascade Mountains in Washington.

From St. Paul to the West Coast, this is basically the route of Amtrak's Empire Builder. But the Builder turns north in Fargo onto a BNSF secondary line to reach Grand Forks, North Dakota, while the Northern Transcon heads directly toward Minot. The Builder rejoins the Transcon main route at Minot and continues on to Seattle, though a section branches off to serve Portland, Oregon. BNSF also owns trackage with running rights in Winnipeg, Manitoba, Canada, where it has a yard operated by a switch unit and full crew. The track is maintained by a small track crew.

Historical alignments in Montana

[edit]

The portion of the Northern Transcon line from Columbia Falls to Libby, Montana has been significantly rerouted twice since its initial construction in 1892.

Kootenai River valley

[edit]

Prior to the opening of the Flathead Tunnel, trains left the modern route at Stryker, Montana and traveled northwest to Eureka, Montana, then traveled southwest along the Kootenai River and rejoined the present-day line at Jennings, located just below the Libby Dam.

In 1970, the construction of the Libby Dam formed Lake Koocanusa, flooding the towns of Rexford, Montana and Waldo, British Columbia and the railroad line.[3] This required the relocation of more than 60 miles (97 km) of track between Stryker and Jennings and the building of Flathead Tunnel which, like the dam, was constructed by the US Army Corps of Engineers. Part of the original main line from Stryker to Eureka is still in use as the Mission Mountain Railroad. Before the construction of the tunnel, the Empire Builder also had a station stop in Eureka.

The only visible remnants of the original route are a stub track at Jennings, where the unused original track still remains close to the current main line, and Northwest of Eureka the original mainline is now a trail that meanders over towards Lake Koocanusa, with the old right of way eventually diving into the reservoir.

Haskell Pass

[edit]

The alignment that travelled from Whitefish to Libby via Eureka was created in 1902 to replace a predecessor alignment over Haskell Pass, farther to the south.

The pass was named for its founder, Charles Haskell, who in the winter of 1891 had set out to locate a reasonable alignment for the Great Northern railroad to take between Kalispell, Montana and the Kootenai River. Ranging as far north as the Canada–US border, Haskell's party eventually returned to Kalispell in early spring, having crossed a low notch in the Salish Mountains on the return trip. A year after the scouting trip, construction was begun on what was to be the first of three Great Northern lines through the Salish.

Completed in 1892, the Haskell Pass line left the modern alignment of the route at Columbia Falls, Montana, a few miles east of Whitefish. The line travelled almost due south to Kalispell, where a branch split off the route that ran to Somers, Montana on the shore of Flathead Lake. The line travelled west from Kalispell to Marion, then alongside Little Bitteroot Lake, looping up on a high trestle over Herrig Creek, and passing through a 1,425-foot-long (434 m) tunnel at the summit of Haskell Pass, emerging high on the mountains above Pleasant Valley. The line descended to the valley floor, then turned north along Island Creek, and west down Wolf Creek, to the Fisher River. The line followed the Fisher River north to the Kootenai River Valley, where it returned to the 1902–1970 alignment at Jennings.

The Haskell Pass line was used only for ten years before the Kootenai River alignment opened. Shifting to the Kootenai River alignment was controversial because the new alignment was 20 miles (32 km) longer than the old route, although the new route had less steep grades.[citation needed]

Much of the Haskell Pass route was abandoned in 1902. The leg from Columbia Falls to Marion remained in use as a branch line until 1948, when it was truncated to Kalispell. When Flathead Tunnel was constructed in 1970, part of the Haskell Pass alignment along the Fisher River was recycled, namely the leg from Jennings to Tamarack siding (originally Sterling).[4] On Haskell Pass, much of the right-of-way has been grown over, but small remnants of infrastructure and the original tunnel through the pass itself are still intact.

Winter operations

[edit]

Keeping the Northern Transcon open during the winter is a significant challenge, whether from snow in the Midwest and mountains, or rain in the Pacific Northwest. Heavy rains have the potential to cause mudslides along Puget Sound between Seattle and Everett and in the Nisqually, Washington area between Tacoma and Olympia. For example, in early January 2006, there were four slides between Seattle and Everett. In late January 2006 and again in early February 2006, mudslides occurred both between Seattle and Everett and around Nisqually. Heavy snow in the Rockies around Marias Pass have the potential to cause avalanches that can block the tracks. Following the clearing of a slide or an avalanche, no passenger train can run on the track for 48 hours to ensure that the slide area has stabilized, per BNSF policy.[citation needed]

Passenger trains

[edit]
The Empire Builder traveling through Glacier National Park, Montana. (1947)
The Empire Builder train at Winona Junction, Wisconsin, in 1958

Amtrak operates its Empire Builder on the corridor between Twin Cities and points west, though the train utilizes a more northerly route between Fargo and Minot. Until the formation of Amtrak in May 1971, both Burlington Northern and its predecessor, the Great Northern, ran the Builder on the section between Chicago and Twin Cities via Savanna, part of today's BNSF Northern Transcon route. When Amtrak took over service, it rerouted the train to run between Chicago and Minneapolis-St. Paul through Milwaukee via the Milwaukee Road.[5] Both Burlington Northern and Great Northern at the time also used to operate west from the Twin Cities before turning northwest in Willmar, Minnesota, to reach Fargo.

Between 1971 and 1979, on the parallel route of the former Northern Pacific between Twin Cities and Spokane via Staples, Fargo, Bismarck, Missoula and Helena run the North Coast Hiawatha, which also served stops such as St. Cloud, Staples and Detroit Lakes.[6]: 158  [7] Between Chicago and Minneapolis, and between Spokane and Seattle, the North Coast Hiawatha run combined with the Builder three days a week.[8][9][10][11]

When Amtrak suspended the North Coast Hiawatha, it rerouted the Builder over the former NP mainline between Minneapolis-St. Paul and Fargo to continue to serve St. Cloud, Staples and Detroit Lakes, which otherwise would have lost service when the North Coast Hiawatha was suspended.[6]: 158  The realignment of the Builder from the former GN mainline to the NP mainline however resulted in the loss of the stops at Willmar, Breckenridge and Morris.

Between 2009 and 2013, when BNSF suspended freight traffic between Fargo and Minot via Grand Forks because of overflows of Devils Lake, threatened to allow the rising waters to cover the line unless Amtrak could provide $100 million to raise the tracks. BNSF also offered Amtrak, during that time, to accommodate the Builder on the segment of the Transcon between Fargo and Minot, but that would have meant the loss of the Grand Forks, Devils Lake and Rugby station stops. To compensate for the loss of station stops at Grand Forks, Devils Lake, and Rugby that would have been caused by the shift, BNSF suggested that Amtrak add a station stop at New Rockford, North Dakota. However, Amtrak said that they would continue using the line by the lake. In 2010, analysts estimated that Amtrak would soon either have to rebuild the bridge that crosses the lake at Churchs Ferry, or reroute its passenger trains.[12] In June 2011 agreement was reached that Amtrak and BNSF would each cover 1/3 of the cost with the rest to come from the federal and state governments.[13]

In December 2011, North Dakota was awarded a $10 million TIGER grant from the US Department of Transportation to assist with the state portion of the cost.[14] Work began in June 2012, and the track is being raised in two stages: 5 feet (1.5 m) in 2012, and another 5 feet in 2013. Two bridges and their abutments are also being raised. When the track raise is complete, the top-of-rail elevation will be 1,466 ft (446.84 m).[15] This is 10 feet above the level at which the lake will naturally overflow and will thus be a permanent solution to the Devils Lake flooding.

The Metra BNSF Line operates in the whole Chicago Subdivision, providing commuter rail service. These are the only passenger trains directly operated by BNSF via a "purchase of service agreement" with Metra. This stretch of track also hosts the Amtrak California Zephyr, the Amtrak Southwest Chief, and the Chicago-Quincy sections of the Amtrak Illinois Service on their way to Galesburg and points west.

Between October 2009 and January 2026, the Northstar Line operated north of Minneapolis on the Midway and Staples Subdivisions. Also, the Seattle Subdivision hosts Amtrak Cascades as well as Sounder commuter rail trains.

Subdivisions

[edit]

The Northern Transcon is divided into many subdivisions. From east to west, these include:[16][17]

To the west of Spokane, WA (at Latah Jct, as of June 1973[18] to the present day[19]), the line splits into two main routes,[19] one using mostly the old Great Northern Railway route directly to Seattle, WA, and the other using mainly the former Spokane, Portland and Seattle Railway route, but also a large section of the former Northern Pacific Railway route, to Portland, OR via Pasco and Vancouver, WA; then it travels north to Seattle.

Expedited Transcon traffic is generally routed via the direct Seattle route, and slow bulk-freight traffic is generally routed via the Spokane–Portland–Seattle route (through Vancouver, WA). The Spokane–Portland–Seattle route is mostly water level with a 1.15% maximum grade near Marshall, Washington. (Note that there is a parallel BNSF-owned route that bypasses the 1.15% grade with a maximum grade of 0.8%; they operate it directionally.) There is a 0.95% maximum grade in the Napavine, Washington area.[19] The direct Seattle route traverses the Cascade Range at the Cascade Tunnel (Scenic and Berne, Washington); it has 2.2% ruling grades in the vicinity of the tunnel.[19]

Direct Seattle route:[19]

Portland-Seattle route:[19]

The former Northern Pacific Railway route via Stampede Pass through Pasco and Auburn, WA to Tacoma, WA has had a checkered history. Since 1996 it has been a third route to the coast. As of 2010 it was seldom used but still in service.

Stampede Pass line:[19]

  • Yakima Valley Subdivision (Pasco, WA to Ellensburg, WA)
  • Stampede Subdivision (Ellensburg, WA to Auburn, WA)

See also

[edit]

References

[edit]
Revisions and contributorsEdit on WikipediaRead on Wikipedia
from Grokipedia
The Northern Transcon is a principal transcontinental freight corridor operated by BNSF Railway, extending over 1,800 miles from Pacific Northwest gateways such as Seattle and Vancouver, Washington, eastward through Montana's Rocky Mountains and the northern Great Plains to the Twin Cities and Chicago, Illinois, forming the northernmost rail alignment in the contiguous United States.[1][2] This route, successor to the Great Northern Railway's main line constructed without federal land grants in the late 19th century, facilitates high-volume transport of intermodal containers, grain, and other commodities, leveraging grades as low as 0.8% over Marias Pass—the lowest rail crossing of the Continental Divide.[3][4] The corridor's strategic value lies in its direct access to export-oriented agriculture in North Dakota and Montana, as well as seamless interline connections for expedited Pacific Northwest-to-East Coast service, with recent operational enhancements reducing transit times through coordinated handoffs with partners like Norfolk Southern.[1] However, its exposure to severe winter conditions, including sub-zero temperatures and blizzards across the Hi-Line subdivisions, periodically disrupts traffic, necessitating specialized equipment like rotary plows and insulated locomotives for reliability.[2] Amtrak's Empire Builder passenger train parallels much of the route daily, providing the only scheduled rail service between Chicago and Seattle/Portland, though freight priority often results in delays averaging several hours.[3] Ongoing investments, including double-tracking segments from Chicago to the Twin Cities and Minot to Williston, North Dakota, address bottlenecks amid surging volumes, underscoring the route's role in North America's freight backbone despite competition from southern transcons optimized for speed over milder terrain.[1][4]

History

Origins in the Great Northern Railway

The Great Northern Railway was formally organized on September 18, 1889, by James J. Hill as a consolidation of existing lines including the St. Paul, Minneapolis and Manitoba Railway, initiating the extension of a transcontinental mainline westward from St. Paul, Minnesota, toward Puget Sound ports.[5] Unlike federally subsidized competitors such as the Northern Pacific, Hill financed construction primarily through private capital, bonds, and reinvested earnings from existing operations, rejecting extensive land grants or direct government aid to avoid dependency and ensure route efficiency based on projected market-driven traffic.[6] This approach prioritized rigorous surveys for low-gradient alignments—averaging under 1% where possible—to minimize fuel and motive power costs, reflecting Hill's emphasis on operational self-sufficiency over subsidized expansion.[7] Central to the route's feasibility was the adoption of Marias Pass as the crossing of the Continental Divide, selected after exploratory surveys in 1889 identified it as the lowest-elevation option at 5,235 feet, surpassing alternatives like the steeper Haskell Pass initially considered for northern Montana.[8] Engineering teams under Hill's direction advanced grading and tracklaying through the rugged Rockies, reaching the pass summit on September 14, 1891, via a meticulously aligned profile that avoided excessive tunneling or high bridges relative to topographic constraints.[9] This choice not only reduced construction expenses—estimated at $150,000 per mile in mountainous sections—but also facilitated reliable year-round operations by leveraging natural drainage and milder avalanche risks compared to higher passes.[10] The full mainline from St. Paul to Seattle, spanning 1,777 miles, reached operational completion on January 6, 1893, marking the first privately developed transcontinental railroad without significant federal subsidies.[11] Early freight volumes validated the investment through hauls of wheat and other grains from newly settled Northern Plains farmlands, with the line carrying 20.7 million bushels in 1894 alone, alongside lumber and nascent mineral shipments from Montana territories.[12] These revenues, generated by linking producers directly to export markets without intermediary subsidies, demonstrated the route's economic grounding in regional resource extraction and agricultural intensification rather than artificial incentives.[5]

20th-century expansions and mergers

In the early 20th century, the Great Northern Railway expanded its network through strategic branch lines and secondary alignments to bolster redundancy amid environmental vulnerabilities and competitive pressures from southern transcontinental routes like the Northern Pacific. Following devastating floods in the 1920s that disrupted mainline operations in Montana, engineers explored alternative paths, including alignments along the Kootenai River valley and through Haskell Pass, to mitigate flood risks and enhance route resilience for freight hauling timber and minerals during resource booms.[13][14] These efforts, though not all realized as permanent mainline diversions, reflected pragmatic responses to hydrological challenges and the need for diversified access to Pacific Northwest ports amid rivalry with lower-gradient southern corridors.[10] World War II catalyzed further infrastructure enhancements, as the railway served as a critical military supply artery, achieving consecutive annual freight traffic records in 1942, 1943, and 1944. Surging volumes of war materials necessitated capacity upgrades, including track reinforcements and signaling improvements along the transcontinental mainline to handle overloaded consists without compromising safety or efficiency.[10][15] These modifications were driven by federal demands for reliable wartime logistics, underscoring the line's strategic value in transporting munitions and troops eastward from Seattle and westward reinforcements. Postwar dieselization, completed across the Great Northern system by the mid-1960s, yielded substantial operational economies by replacing steam locomotives with more reliable diesel-electric units, slashing maintenance and fuel expenditures relative to pre-diesel eras. This transition lowered costs per ton-mile through reduced crew sizes, faster turnaround times, and elimination of water and coaling infrastructure, enabling competitive pricing against trucking and southern rail rivals amid fluctuating grain and ore shipments.[16] The decade culminated in the pivotal 1970 merger forming the Burlington Northern Railroad on March 2, consolidating the Great Northern with the Northern Pacific, Chicago, Burlington & Quincy, and Spokane, Portland & Seattle railways. This "northern empires" integration absorbed the CB&Q's extensive Midwest network, securing direct Chicago access and streamlining through-routing for transcontinental freight, thereby countering fragmented operations and enhancing economies of scale against consolidated southern competitors.[10][17][15] The merger rationalized redundant trackage while preserving the core northern alignment's low-gradient advantages for heavy commodity flows.

Formation under BNSF Railway

The Burlington Northern and Atchison, Topeka and Santa Fe Railway merged on September 22, 1995, forming the Burlington Northern Santa Fe Railway (BNSF), which commenced integrated operations on December 31, 1996, after regulatory approval.[18][19] This consolidation created North America's largest freight rail network at the time, spanning approximately 31,000 miles across 27 states, with the Northern Transcon emerging as the primary high-capacity corridor linking Pacific Northwest ports to Chicago via a northern alignment through Montana and the Dakotas.[20][15] The merger unified previously parallel routes, enabling streamlined freight flows and positioning the Northern Transcon for concentrated upgrades to handle growing intermodal volumes from Asia-Pacific imports unloaded at Seattle and Tacoma, which offered shorter inland hauls compared to southern gateways.[1] Post-merger rationalization efforts included the planned abandonment or sale of about 4,000 miles of lower-density or redundant trackage, primarily southern alignments inherited from Santa Fe, to redirect capital toward core transcontinental mains like the Northern Transcon.[20] This focus enhanced efficiency by eliminating operational overlaps and prioritizing double-tracking, signaling improvements, and capacity expansions on the northern route, which benefited from deregulation under the Staggers Rail Act of 1980. The Act's provisions for market-based pricing and reduced Interstate Commerce Commission oversight allowed BNSF to shed subsidized low-margin services, invest in revenue-generating corridors, and achieve financial recovery, with rail industry net income rising from losses in the 1970s to profitability by the late 1980s.[21][22] By 2000, these changes positioned BNSF to capture a substantial share of U.S. intermodal traffic growth, with the Northern Transcon serving as a key artery for containerized freight amid surging transpacific trade; intermodal loadings reached over 7 million units annually industry-wide, reflecting deregulation-driven efficiencies that lowered shipper costs by up to $7 billion yearly in adjusted terms.[23][24] The unified corridor's performance underscored causal links between merger synergies, route optimization, and policy reforms, fostering higher velocities and volumes without reliance on regulated rate controls.[25]

Route Description

Overall alignment from Pacific Northwest to Midwest

The Northern Transcon comprises a 2,206-mile rail corridor operated by BNSF Railway, extending from the Seattle-Tacoma metropolitan area in Washington state eastward to Chicago, Illinois, via Spokane, Washington; Glacier National Park in Montana; and Minot and Fargo in North Dakota.[26][27] This path forms one of the principal east-west freight arteries in North America, connecting Pacific Northwest gateways to Midwestern hubs.[28] Over 1,000 miles of the alignment closely parallels the Canada–United States border along the 49th parallel, particularly from eastern Washington through Montana and into North Dakota, where terrain south of the boundary facilitates relatively straight and level trackage across the Northern Plains.[29][30] The route's northern latitude enables traversal of the Continental Divide via lower-elevation natural passes, yielding milder ruling grades—typically under 1% in key mountain sections—compared to the steeper ascents (often 2–3%) on southern transcontinental lines through higher summits like Raton Pass.[31] These grades support high-tonnage operations with lower horsepower demands per ton-mile.[31] Freight trains on the corridor achieve maximum authorized speeds of up to 70 mph on optimized segments, with effective average speeds of 40–50 mph when factoring in elevation profiles, curvature, and directional running.[32][33] The alignment's integration with Seattle-area intermodal terminals positions it as a vital conduit for trans-Pacific imports from Asia, minimizing exposure to the thermal stresses and dust accumulation prevalent on desert-crossing southern routes.[34]

Critical segments in the Rocky Mountains

The Northern Transcon crosses the Cascade Mountains in Washington state via Stevens Pass, where the 7.8-mile Cascade Tunnel, completed by the Great Northern Railway in 1929, provides a key engineering solution to the steep topography and avalanche risks of surface routing.[35][36] This tunnel, the longest railroad tunnel in the United States, reduces exposure to heavy snowfall and wind, enabling more reliable operations than open-air alternatives, though it requires continuous ventilation and drainage systems to manage water inflow and diesel exhaust.[37] Avalanche mitigation along the approaches includes extensive snowsheds, which protect against slides that historically disrupted service on steeper Cascade crossings.[38] Further east, the route navigates the Rocky Mountains through Idaho and western Montana, culminating in the Continental Divide crossing at Marias Pass, elevated at 5,213 feet above sea level.[39] The Great Northern selected this pass over higher or steeper alternatives due to its gentler ruling grades of approximately 1% on the eastern slope and 1.8% on the western, compared to 2.5% or more on rival routes like those evaluated south of the selected alignment.[40] These lower gradients minimize locomotive requirements and energy expenditure per ton-mile for heavy freight consists, prioritizing cost efficiency and capacity over shorter but more demanding paths.[37] Topographical constraints in these segments demanded route selections balancing elevation gains with operational feasibility; Marias Pass offered the lowest summit and shortest distance across the Divide among viable options surveyed in the 1890s, avoiding the prohibitive construction costs and maintenance of tunneling higher elevations or helixes.[10] Snowsheds and avalanche forecasting programs remain essential for winter reliability, with BNSF employing dedicated monitoring to preempt disruptions from the region's extreme precipitation, which can exceed 300 inches annually in exposed areas.[41] This engineering focus on moderate grades and protective structures sustains the Transcon's competitiveness against southern transcontinental rivals with harsher profiles.[37]

Historical alignments and engineering challenges in Montana

The Great Northern Railway's early alignments in northwestern Montana encountered significant engineering difficulties due to rugged terrain and unstable passes. Constructed in 1892, the Haskell Pass route reached an elevation of 4,300 feet with steep gradients that proved operationally challenging, leading to its abandonment by 1904 in favor of a lower-gradient path incorporating the Flathead Tunnel.[42] This shift exemplified the railway's adaptation to local topography, prioritizing stability over initial surveying preferences.[43] Subsequent routing through the Tobacco Plains area, developed around 1903–1904, provided a more reliable corridor along the Kootenai River valley, avoiding higher elevations prone to avalanches and facilitating steadier grades for transcontinental traffic.[44] Engineering challenges persisted, including recurrent flooding; for instance, severe inundations in 1908 from the Hauser Lake Dam failure disrupted operations across Montana lines, necessitating realignments to elevated benches and reinforced embankments. In the central Rockies, the mainline through Marias Pass, completed in 1891 at a summit of 5,215 feet, demanded extensive snowshed construction—over 37 miles—to mitigate avalanche risks, while river crossings like the Two Medicine required durable trestles vulnerable to glacial outbursts and high water.[45] Permafrost instability in higher elevations posed additional hazards, with thaw-induced subsidence threatening track alignment, though historical records indicate targeted reinforcements in the 1930s, such as improved drainage and ballast stabilization, minimized weather-related disruptions.[46] These realignments and fortifications collectively reduced vulnerability, enabling more consistent operations compared to pre-1900 configurations, though precise quantitative savings in transit time—estimated at 10–15% through optimized gradients—remain inferred from comparative route analyses.[10]

Operations

Freight traffic and capacity management

The Northern Transcon serves as a primary corridor for BNSF Railway's freight operations, handling a mix dominated by intermodal containers and trailers, which prioritize high-value, time-sensitive shipments, alongside substantial volumes of bulk commodities such as coal, grain, and crude oil derivatives. Intermodal traffic, including double-stack container trains, benefits from dedicated priority scheduling to maintain velocity across the route's 1,800-mile span from Seattle to Chicago. Bulk loads, particularly coal from Powder River Basin connections and agricultural products from the Northern Plains, constitute key throughput, though their lower priority reflects market economics favoring revenue density over volume alone.[47][48] Annual freight volumes on the route support BNSF's network-wide metrics, with carload and intermodal units contributing to overall system performance amid fluctuating commodity demands; for instance, BNSF managed elevated grain and energy shipments in 2023-2024 despite broader volume dips of 5-8% in some sectors. Capacity constraints in high-density segments, such as the Montana Division, are addressed through strategic use of passing sidings and dynamic looping, where slower bulk trains yield to faster intermodal consists, enabling efficient single-track operations without widespread double-tracking. This approach maximizes throughput by minimizing dwell times, with sidings extended up to 16,000 feet in recent upgrades to accommodate longer unit trains.[49][50][51] The 2010s Bakken oil surge necessitated rapid capacity expansions, particularly doubling throughput from Minot, North Dakota, to Williston via added sidings, staging yards, and unit train infrastructure, elevating export capacity to 1 million barrels per day by 2012 to capture surging crude volumes exceeding pipeline alternatives. Algorithmic dispatching systems integrate real-time data on train consists, grades, and market priorities, directing high-revenue intermodal trains ahead of bulk hauls to achieve on-time metrics exceeding 90% for local carload service and over 95% for select intermodal products like those in partnership with J.B. Hunt. These practices underscore a profit-oriented model, where slotting favors loads yielding higher returns per ton-mile, sustaining route velocity even as bulk traffic like coal faces demand volatility.[52][53][54]

Passenger train integration

Amtrak's Empire Builder operates as the sole long-distance passenger service utilizing trackage rights on BNSF's Northern Transcon, providing daily east-west connectivity from Seattle and Portland to Chicago.[55] The train follows the corridor from the Pacific Northwest through Spokane, Montana's Hi-Line, North Dakota, and Minnesota to St. Paul, where it transitions to other lines eastward, covering approximately 1,950 miles in each direction.[56] Introduced in 1971 following the creation of Amtrak, it relies on BNSF infrastructure maintained primarily for freight, with passenger operations subordinate to host railroad priorities under federal trackage rights agreements.[57] Operational speeds for the Empire Builder are restricted to a maximum of 79 mph on BNSF segments, governed by track classification standards (typically Class 4) and infrastructure conditions optimized for freight rather than high-speed passenger movement.[58] This cap contrasts with potential for higher velocities on dedicated passenger alignments but aligns with the route's freight-centric design, where curves, grades, and siding availability prioritize capacity for heavy-haul trains. Freight precedence routinely results in delays of 2 to 4 hours or more per trip, as Amtrak trains yield to host operations; "freight train interference" accounts for the majority of such interruptions across Amtrak's network on private tracks.[59] In fiscal year 2024, the Empire Builder carried 387,953 passengers, underscoring its role in serving rural and intermediate communities but highlighting its marginal footprint amid dominant freight volumes exceeding dozens of trains daily on the same corridor.[60] Efforts to mitigate integration challenges, including proposals in the 2020s for dedicated passenger sidings or tracks to reduce conflicts, have stalled due to prohibitive costs relative to projected benefits, given low passenger density and high freight throughput.[57] Amtrak's monthly host railroad reports document persistent performance gaps, with BNSF-attributable delays averaging hundreds of minutes per 10,000 train-miles, reinforcing the economic rationale for maintaining freight primacy over passenger enhancements.[61] This dynamic exemplifies trade-offs in shared-use corridors, where passenger service benefits from access to established infrastructure but incurs reliability costs from competing priorities.

Winter and adverse weather protocols

BNSF implements targeted protocols on the Northern Transcon to address extreme winter conditions, particularly intense cold snaps impacting segments through Montana and North Dakota. In February 2025, an arctic blast drove temperatures over 20 degrees below zero Fahrenheit, leading to train length restrictions to maintain braking system airflow and performance amid frozen air lines and reduced efficiency.[2] [62] These restrictions persisted into mid-February until warming trends allowed normalization, alongside distributed locomotive power to enhance control.[63] To combat switch freezing, BNSF deploys over 5,100 heated switches network-wide, with upgrades implemented since the prior winter to ensure operability of remote-controlled points during sub-zero temperatures.[64] Winter Action Plans, evaluated per operating division, dictate adjustments to train speeds, sizes, and crew transport based on real-time weather monitoring via tools like AccuWeather for wind and storm tracking.[65] [66] Infrastructure monitoring incorporates remote sensors for continuous assessment of track temperatures, rail stress, and switch conditions, augmented by drone inspections to identify ice buildup, rail fractures, or other hazards without halting operations.[67] Extreme cold exacerbates risks including brittle rail breaks from thermal contraction and diminished air brake responsiveness, which can necessitate train stops and contribute to derailment potential if unmitigated.[68] [69] These adaptive measures, including proactive route planning to evade storms and deployment of snow-clearing equipment, sustain freight movement while prioritizing safety amid wind chills and snowfall.[64]

Infrastructure

Subdivisions and signaling systems

The Northern Transcon is segmented into roughly 20 operational subdivisions under BNSF Railway management, each averaging 100 to 200 miles in length to delineate dispatch territories, maintenance responsibilities, and jurisdictional handoffs.[70] These divisions enable centralized oversight from BNSF dispatch centers, such as those in Fort Worth, Texas, ensuring coordinated train movements and reducing transit delays through standardized protocols for crew changes and authority transfers at subdivision boundaries.[71] Prominent subdivisions include the Scenic Subdivision, spanning approximately 155 miles from Seattle, Washington, to Wenatchee, Washington, handling high-volume intermodal and freight traffic through the Cascade Mountains.[72] The Kootenai Subdivision traverses rugged terrain along the Idaho-Montana border, supporting speeds up to 60 mph for freight with connections to regional branches.[73] In Minnesota, the Staples Subdivision extends 226.4 miles from Northtown Yard near Minneapolis to Dilworth, serving as a critical east-west artery with double-track configurations and integration for Amtrak's Empire Builder passenger service.[74] North Dakota segments, including the Devils Lake Subdivision from Minot to Grand Forks, interface with Bakken Shale oil production areas, facilitating unit and manifest trains for crude and related commodities via dedicated loading facilities.[75] Signaling across the Transcon primarily utilizes automatic block signaling (ABS) augmented by centralized traffic control (CTC) hybrids in high-density areas, providing block occupancy detection and route signaling for efficient train spacing.[76] BNSF overlaid Positive Train Control (PTC) system-wide from 2017 to 2020, incorporating GPS-based positioning, wayside monitoring of signals and switches, and onboard enforcement of speed limits and movement authorities to prevent overspeed, misaligned switch, and derailment incidents.[77][78] This implementation, mandated by federal regulation, has enforced real-time safety overlays compatible with legacy ABS infrastructure, enabling interoperable operations while maintaining freight velocities.[71] Subdivision transitions incorporate unified PTC domains under BNSF protocols, minimizing authorization disruptions.[79]

Track configurations and grade optimizations

The Northern Transcon's track configurations prioritize capacity for heavy-haul freight, featuring double-track arrangements on extensive segments across the Great Plains and intermountain regions to enable continuous bidirectional operations and minimize train meets on sidings. The route accommodates 286,000-pound gross rail loads, the industry standard for Class I mainlines, supported by continuous welded rail sections typically weighing 136 to 141 pounds per yard for durability under repeated heavy-axle passages.[80] Single-track portions persist in rugged terrain, such as the Rocky Mountain crossings, where terrain constraints limit full duplication without prohibitive costs. Grade optimizations focus on maintaining ruling gradients below 2 percent, with general track standards capping profile grades at 1.5 percent through balanced cut-and-fill earthwork to balance excavation and embankment volumes, thereby reducing construction expenses while preserving alignment efficiency. In key bottlenecks like Marias Pass, the maximum ruling grade reaches 1.8 percent on eastbound ascents from Java to Summit, necessitating distributed power locomotives to manage tonnage without excessive slippage or dynamic braking demands.[81] [40] Historical engineering, including realignments from the Great Northern era, employed spiral easing and vertical curves to transition grades smoothly, avoiding abrupt changes that could compromise train control or increase wear. Horizontal curves incorporate superelevation tilted at rates calibrated for freight train speeds up to 60 mph, providing lateral stability for loaded consists and reducing centrifugal forces that would otherwise mandate speed restrictions or additional fuel for acceleration.[82] Post-2010 track renewal programs have included upgraded ballast specifications, such as denser granite aggregates for better load distribution and drainage, which enhance subgrade support under 286k loads and mitigate settlement in variable soils.[83] These configurations yield operational efficiencies, as double-track segments curtail delay-induced idling, allowing trains to maintain momentum and conserve diesel fuel relative to single-track dispatching constraints.[84] Superelevated curves and refined grades further optimize resistance profiles, lowering overall energy requirements per ton-mile in comparison to steeper or unbanked alignments.[85]

Major bridges, tunnels, and facilities

The Northern Transcon route includes numerous tunnels piercing the Rocky Mountains and Cascade Range, with the Cascade Tunnel in Stevens Pass, Washington, standing as the longest railroad tunnel in North America at 7.8 miles. Completed in 1929 by the Great Northern Railway, it features extensive concrete lining and a dedicated ventilation system to manage locomotive exhaust, enabling reliable freight passage through challenging terrain for over 90 years.[37] Further east, the Flathead Tunnel in Montana's Salish Mountains extends 7.01 miles and was bored between 1966 and 1969 to replace a snow-prone summit alignment, incorporating geological stabilization measures for long-term structural integrity against mountain pressures.[86] These and other tunnels collectively number in the dozens along the mountainous segments, each designed with durable linings to minimize maintenance and ensure operational continuity.[87] Major bridges on the route emphasize flood resistance, particularly over the Missouri River. The Bismarck-Mandan rail bridge in North Dakota, originally constructed in 1883 by the Northern Pacific Railway, utilizes deep piers anchored into stable riverbed formations to withstand seasonal flooding and ice flows, sustaining heavy freight loads for more than 140 years.[88] Similar engineering in other spans, such as trestles in Montana's glacial valleys like the Two Medicine Trestle, employs reinforced timber and steel frameworks rated for decades of service under variable loads and environmental stresses. Key facilities support routing efficiency, including classification yards for train assembly and crew changes. The Northtown Yard near Minneapolis, Minnesota, operates as BNSF's third-largest hump yard, handling sorting of transcon freight cars with gravity-fed retarders designed for high-volume throughput.[28] In North Dakota, yards at Minot and Williston provide essential stops for crew exchanges and locomotive servicing amid the expansive plains segments.[89] On the western terminus, Seattle's intermodal hubs facilitate seamless transfers of containers from Pacific ports to rail, featuring automated cranes and expansive storage tracks engineered for durability in seismic zones.[90]

Expansions and Modernization

Double-tracking initiatives

In response to surging freight volumes during the Bakken shale oil boom, BNSF Railway accelerated double-tracking on critical Northern Transcon segments in the early 2010s to boost throughput and mitigate bottlenecks. The Glasgow Subdivision between Minot and Williston, North Dakota, saw construction of 37 miles of new double track, with ongoing work reported in 2015 and completion achieved by 2016, as part of broader capacity enhancements including centralized traffic control signaling.[91][92] Parallel efforts targeted the Chicago to St. Paul corridor, where BNSF double-tracked key single-track sections to handle increased east-west traffic flows, with projects finalized by 2016 amid heightened oil and intermodal demand.[87] These phased doublings effectively doubled segment capacities, supporting higher train densities—up to dozens per day in upgraded areas—and facilitating more reliable scheduling by minimizing meets on single track.[93] Industry analyses indicate such infrastructure upgrades reduced operational delays and congestion through improved flow efficiency, though specific quantitative metrics vary by segment and traffic conditions.[94] Costs for comparable double-tracking averaged $2–3 million per mile, encompassing track laying, signaling, and minor grading, with returns realized via elevated volumes that offset investments within years through avoided demurrage and enhanced revenue.[95][96]

Recent capital projects and technological upgrades (2010s–2025)

BNSF Railway undertook significant capital investments in the Northern Transcon during the 2010s and 2020s to bolster capacity amid rising freight volumes, particularly for energy-related commodities from the Northern Plains. A key project was the completion of the Sandpoint Bridge initiative, which added a second span over Lake Pend Oreille in Idaho, enhancing throughput on the Northern Corridor by reducing bottlenecks in this mountainous segment.[97] These efforts aligned with broader network expansions, including multi-year initiatives to add approximately 45 miles of triple track on ascending grades to accommodate heavier train consists and improve meet-pass operations.[85] In 2024 and 2025, BNSF allocated over $4 billion in customer-driven economic development tied to rail infrastructure, with targeted focus on North Dakota and Montana to support grain and fuel exports via the Northern Transcon.[98] The company's 2025 capital plan totaled $3.8 billion systemwide, designating $535 million specifically for expansion and efficiency upgrades, including enhancements to handle increased energy shipments from origins in these states to Pacific Northwest ports.[99][100] Technological advancements emphasized operational resilience and precision. BNSF deployed drone systems—unmanned aircraft—for real-time assessments of derailments and track disruptions along the route, enabling faster recovery since initial implementations in the late 2010s.[101] Artificial intelligence pilots integrated predictive maintenance algorithms to optimize asset utilization and detect anomalies in signaling and rolling stock, contributing to efficiency gains across the corridor.[102] Arctic weather responses in 2025 incorporated upgraded protocols, such as distributed locomotive power for improved braking in sub-zero conditions and proactive air brake monitoring, yielding over 60% reduction in weather-induced service interruptions compared to prior baselines.[64] During a February 2025 arctic blast affecting the Northern Transcon, these adaptations mitigated backlog accumulation despite persistent cold snaps, with operations stabilizing as temperatures moderated.[2][103]

Economic and Strategic Importance

Role in intermodal and bulk freight transport

The Northern Transcon serves as a primary artery for intermodal freight on BNSF Railway's network, transporting containerized goods and trailers from Pacific Northwest ports such as Seattle and Tacoma eastward to Chicago and connecting Midwest hubs. This corridor handles a substantial share of U.S. West Coast import traffic destined for inland markets, with BNSF emphasizing its role in linking ocean ports to major distribution centers for efficient long-haul movement.[90][104] In 2023, intermodal volumes along the route contributed to BNSF's overall recovery from pandemic-related port disruptions, with quarterly reports noting increases driven by higher West Coast import shipments.[49][105] For bulk freight, the Northern Transcon supports unit train operations carrying commodities like Bakken crude oil from North Dakota origins to refineries and export facilities, often in dedicated 100-car configurations capable of hauling approximately 3 million gallons per train.[106] BNSF has historically transported about one-third of Bakken production via rail, utilizing the corridor's infrastructure for high-volume, single-commodity flows that bypass pipeline constraints.[107] These unit trains enable modal shifts from trucking, where one freight train can equivalent the capacity of several hundred trucks, reducing highway congestion and infrastructure wear.[108] Rail operations on the Northern Transcon offer cost efficiencies over trucking, with average rail rates around $0.03–$0.04 per ton-mile compared to $0.15–$0.20 for trucks, yielding savings of approximately $0.10–$0.15 per ton-mile for shippers opting for intermodal or bulk rail.[109] This advantage drives freight modal shifts, particularly for high-volume intermodal loads post-2023 port normalizations, where rail captured diverted traffic from congested roadways and alternative routes.[105]

Contributions to North American trade efficiency

The Northern Transcon serves as a primary artery for freight movement to Pacific Northwest ports, offering a direct 2,206-mile route from Chicago to Seattle that minimizes detours required when utilizing southern transcontinental paths for the same destinations. This configuration supports efficient integration with ports such as Seattle and Tacoma, which facilitated nearly $76 billion in waterborne trade across 176 global partners in 2024.[110] By enabling streamlined rail-to-port transfers, the route reduces overall logistics friction for Asia-bound exports and inbound imports, fostering causal improvements in supply chain velocity that underpin regional and national trade flows. Post-1980 deregulation under the Staggers Rail Act enabled railroads, including BNSF, to prioritize infrastructure investments and operational streamlining, resulting in freight delivery times falling approximately 30 percent by the mid-1980s through enhanced network fluidity and longer hauls.[24] These reforms shifted competitive dynamics, doubling rail tonnage while cutting inflation-adjusted rates by over 40 percent, which directly lowered shipper costs and amplified the Northern Transcon's role in cost-effective long-distance haulage.[111] Such velocity gains compound to reduce inventory holding expenses and accelerate market access, contributing to broader economic efficiencies in North American commerce. Rail's inherent advantages over trucking—moving equivalent freight with 3-4 times greater fuel efficiency—extend these benefits, with industry analyses indicating that greater reliance on routes like the Northern Transcon could yield billions in annual fuel and congestion savings if long-haul volumes shift modes.[112] This modal efficiency translates to suppressed transportation expenses for goods traversing the continent, exerting downward pressure on consumer prices and bolstering GDP through amplified trade volumes; for instance, U.S. freight rail as a whole supports $233.4 billion in annual economic output, with transcon corridors forming the backbone for interregional and international linkages.[112] The Northern Transcon's capacity expansions, including recent double-tracking, further entrench these dynamics by curtailing transit delays and enhancing throughput reliability.[113]

Competitive advantages over southern routes

The Northern Transcon experiences milder summer temperatures relative to southern transcontinental routes traversing the arid Southwest, resulting in fewer instances of heat-induced rail buckling, or "sun kinks," which require speed restrictions and can lead to operational delays. High temperatures exceeding 100°F (38°C) in regions like southern California and Arizona have historically prompted widespread slow orders on southern lines, as rail expansion under solar heating weakens track stability. In contrast, the Northern Transcon's path through the cooler northern plains and Rockies limits exposure to such extreme thermal stress, enhancing schedule reliability during peak heat periods.[114][115][116] Southern routes face heightened vulnerability to drought-related disruptions, including wildfires intensified by prolonged dry conditions in California and the Southwest, which have repeatedly closed track segments and complicated maintenance. The Northern Transcon, situated in areas with more consistent precipitation and lower wildfire incidence, avoids many of these environmental hazards, supporting more predictable freight movement. This resilience contributes to operational consistency, particularly for time-sensitive intermodal traffic.[117][118] The route's alignment provides strategic proximity to Canadian border crossings and resource origins in the northern Great Plains, enabling efficient handling of bulk commodities such as grain from North Dakota and Montana, which border Saskatchewan and Manitoba. Interconnections with Canadian National and Canadian Pacific railways facilitate seamless cross-border flows of agricultural and energy products, offering a competitive edge for traffic tied to northern resource extraction over longer-haul southern alternatives. Recent service enhancements have further improved transit reliability from the Pacific Northwest to Chicago via the Northern Transcon, positioning it as a viable option for diversified freight corridors.[1][119]

Environmental and Safety Profile

Energy efficiency and emissions data versus trucking

Freight railroads, including those operating on the Northern Transcon, demonstrate significantly higher energy efficiency than trucking. In 2019, U.S. freight railroads achieved an average of 472 ton-miles per gallon of fuel, enabling one ton of freight to travel nearly 500 miles on a single gallon in recent years.[120][121] In contrast, heavy-duty trucks average approximately 134 ton-miles per gallon, reflecting rail's three- to four-fold advantage in fuel utilization due to lower rolling resistance, aerodynamic efficiency, and economies of scale in load capacity.[122] This efficiency translates to substantial emissions reductions. Class I railroads emit about 22 grams of CO₂ per ton-mile, compared to 65 grams for trucks, yielding roughly 66% lower direct CO₂ emissions per ton-mile for rail; indirect analyses, accounting for full lifecycle factors, indicate up to 75% reductions when freight shifts from truck to rail.[122][123] Rail's diesel locomotives, while not zero-emission, benefit from precision dispatching and distributed power that optimize fuel burn, outperforming trucks' higher idling and empty backhaul rates. The Northern Transcon's routing through hydro-rich areas, such as the Pacific Northwest, enhances electrification feasibility, allowing integration of low-carbon hydroelectricity to further diminish emissions beyond diesel benchmarks.[124] Proposals for electrifying segments like BNSF's transcontinental lines highlight potential maintenance savings and speed gains, leveraging regional renewable grids unavailable to southern routes.[125] Rail operations have diverted equivalent truckloads from highways, reducing overall transportation emissions and road wear, with industry shifts since 2000 amplifying these benefits through intermodal growth.[126]

Wildlife and land use impacts

The Northern Transcon corridor employs rights-of-way averaging 100 to 200 feet in width across much of its route, substantially narrower than interstate highways which often exceed 300 feet including medians and shoulders, thereby limiting direct habitat conversion to a linear strip that supports grassland or shrub vegetation rather than expansive impervious surfaces.[127] This configuration contributes to comparatively low levels of habitat fragmentation, as evidenced by ecological studies indicating that railway verges can function as semi-permeable corridors for certain species, with behavioral barriers from train noise and vibration proving less prohibitive than continuous vehicular traffic on roads.[128] Empirical assessments of linear transportation infrastructure, including railroads, reveal that fragmentation effects are mitigated by the intermittent nature of train passages, preserving connectivity for small mammals and birds in adjacent habitats.[129] In sensitive areas such as Glacier National Park, where the BNSF-operated segment traverses grizzly bear habitat, train-wildlife collisions have resulted in at least 75 grizzly deaths between 1975 and 2023, primarily due to attractants like spilled grain drawing animals to tracks.[130] Mitigation efforts, including exclusion fencing, wildlife underpasses and culverts, vegetation management to reduce attractants, and rapid-response protocols for spills, form the core of a 2025 U.S. Fish and Wildlife Service-approved habitat conservation plan, which permits incidental takes of up to 19 grizzlies over seven years while funding broader conservation in northwest Montana.[131] [132] Analogous measures along railway corridors have demonstrated reductions in ungulate mortality by 80% or more through continuous fencing combined with crossing structures, as documented in national park settings with similar topography and species assemblages.[133] Federal records from the U.S. Fish and Wildlife Service indicate no documented extirpations of endangered or threatened species directly attributable to the Northern Transcon's operations, with grizzly populations in the region persisting despite historical collisions, underscoring the efficacy of ongoing adaptive management over catastrophic population-level impacts.[134] Broader reviews of railway ecology affirm that while localized disturbances occur, the corridor's footprint does not precipitate widespread biodiversity declines when paired with targeted interventions, contrasting with more pervasive effects from sprawling road networks.[135]

Incident history and safety record

The Northern Transcon, as part of BNSF Railway's network, has maintained a strong safety profile consistent with Class I freight railroads, with mainline train accident rates declining 41% per million train-miles since 2000 according to Federal Railroad Administration (FRA) data analyzed by the Association of American Railroads (AAR).[136] BNSF specifically reported a 63% reduction in mainline train accidents since 2000, alongside achieving its lowest workplace injury frequency rate in 2023.[137] Across U.S. railroads, the overall train accident rate fell 33% since 2005 and an additional 15% from 2023 to 2024, reflecting investments in track maintenance, positive train control systems, and operational protocols.[138] Major incidents on the route remain rare, with derailments often confined to minor yard events rather than catastrophic mainline failures. During the 2010s Bakken crude oil boom, when rail volumes of flammable liquids surged over 4,000% since 2008, notable spills occurred, such as the July 2015 Montana collision involving a grain train derailment followed by a crude oil unit train impact, releasing approximately 476,000 gallons of oil and igniting a fire.[139] However, such releases represented a minuscule fraction of transported volumes—less than 0.01% based on industry estimates amid billions of gallons shipped annually—despite heightened scrutiny and local opposition to "bomb trains" carrying Bakken shale oil.[140][141] FRA data underscores that over 99.99% of rail hazmat shipments, including those on high-volume corridors like the Northern Transcon, arrive without accidental releases.[142] Regulatory enhancements post-2015 have further mitigated hazmat risks, including mandatory upgrades to tank car standards for flammable liquids like crude oil, speed restrictions on high-hazard trains, and improved route risk assessments under the Hazardous Materials Regulations.[143] These measures, advocated by the rail industry, contributed to a substantial drop in release incidents for certain hazmat types, aligning with broader accident rate reductions exceeding 50% in equipment- and track-related categories since the mid-2010s.[144][108] Empirical comparisons reveal rail's superior safety for bulk hazmat transport: per ton-mile, freight rail incurs 1/8 the fatalities and 1/16 the injuries of trucking, with truck hazmat shipments causing over 16 times more fatalities from 1975 to 2021.[145][146] Rail also outperforms pipelines in spill frequency per comparable distance for crude oil, though critics highlight the severity of rare rail events involving populated areas.[147] Despite occasional track defects prompting investigations, such as a 2023 Minnesota ethanol derailment on a defect-prone segment, BNSF's proactive defect detection has sustained low incident levels relative to traffic density.[148]

References

User Avatar
No comments yet.