NHPC Limited (erstwhile National Hydroelectric Power Corporation) is an Indian public sector hydropower company that was incorporated in 1975 to plan, promote and organise an integrated and efficient development of hydroelectric power. Recently it has expanded to include other sources of energy like solar, geothermal, tidal, and wind.
Key Information
At present, NHPC is a Navaratna enterprise of the Government of India and among the top ten companies in the country in terms of investment base. Baira Suil Power station in Salooni tehsil of Chamba district was the first project undertaken by NHPC.
Public Limited Company
[edit]NHPC is listed on the National Stock Exchange and Bombay Stock Exchange on 1 September 2009. The government of India and State Governments have 67.40% share as a promoter of the Company while remaining 32.6% is public shareholding. The total number of shareholders are 191,337 and share capital is ₹12,300,742,773.
Market value
[edit]At present, NHPC is a schedule 'A' Enterprise of the Govt. of India with an authorised share capital of ₹150 billion, with an investment base of over ₹552 billion Approx. In 2015–16 NHPC made a profit after tax of ₹24.40 billion. An increase of 15% than the previous year profit of ₹21.24 billion. NHPC is among the top 10 companies in India in terms of investment.
Initially, on incorporation, NHPC took over the execution of Salal Stage-I, Bairasiul and Loktak Hydro-electric Projects from Central Hydroelectric Projects Control Board. Since then, it has executed 22 hydro projects with an installed capacity of 6717 MW on ownership basis including projects taken up in a joint venture. One wind project of 50 MW has also been commissioned in October 2016. NHPC has also executed 5 projects with an installed capacity of 89.35 MW on turnkey basis. Two of these projects have been commissioned in neighbouring countries i.e. Nepal and Bhutan at a capacity of 14.1 &60 MW.
Ongoing Projects (as of Feb 2023)
[edit]Presently NHPC is engaged in the construction of 3 projects aggregating to a total capacity of 3130 MW. NHPC has planned to add 1702 MW during 12th Plan period of which 1372 MW has been completed. 5 projects of 4995 MW are awaiting clearances/Govt. approval for their implementation. Detailed Projects reports are being prepared for 3 projects of 1130 MW. Besides, 3 projects of 1230 MW are under development through its JV, Chenab Valley Power Projects Pvt. Ltd. in J&K.
In late 2016, NHPC commissioned a 50 MW wind Power Project in Jaisalmer, Rajasthan.[2]
In April 16th 2025 with commission of its 4th Unit NHPC fully commissioned 800MW Parbati-II H.E. Project. [1] [2]
Since its inception in 1975, NHPC has grown to become one of the largest organisations in the field of hydropower development in the country. With its present capabilities, NHPC can undertake all activities from concept to commissioning of hydroelectric projects.[3]
Subsidiaries
[edit]- Chenab Valley Power Projects Ltd.
- NHDC Limited
- Bundelkhand Saur Urja Limited
- Ratle Hydroelectric Power Corporation (RHPC) Ltd.
- Loktak Downstream Hydroelectric Corporation Limited
- Jal Power Corporation
- NHPC Renewable Energy Limited (NREL)
Power stations
[edit]Total – 8032.9MW (As on April 2025)


*Joint Venture with Madhya Pradesh (M.P.) Government through NHDC
Hydro Power Projects Under construction
[edit]Total – 18399 MW (As on April 2025)
| S.no. | Power Projects | State | Total Capacity (MW) | Completion Schedule |
|---|---|---|---|---|
| 1 | Subansiri (Lower) | Arunachal Pradesh | 2000 | 2020[5] |
| 2 | Pakal Dul* | Jammu & Kashmir | 1000 | 2024 |
| 3 | Kiru* | Jammu & Kashmir | 625 | 2024 |
| 4 | Ratle* | Jammu & Kashmir | 850 | |
| 5 | Kwar*[3] | Jammu & Kashmir | 540 | 2026 |
| 6 | Subansiri Upper Project | Arunachal Pradesh | 2000 | 2031 |
| 7 | Dibang Multipurpose Project | Arunachal Pradesh | 2880 | 2034 |
| 8 | Rangit-IV Project | Sikkim | 120 | 2026 |
| 9 | Teesta-VI Project | Sikkim | 500 | 2026 |
| 10 | Kamala H.E. Project | Arunachal Pradesh | 1800 | 2031 |
| 11 | Dulhasti Stage-II | Jammu & Kashmir | 258 | 2030 |
| 12 | Uri-I Stage-II | Jammu & Kashmir | 240 | 2030 |
| 13 | Sawalkote Project | Jammu & Kashmir | 1856 | 2035 |
| 14 | Kirthai Stage-II* | Jammu and Kashmir | 930 | 2032 |
| 15 | West Seti H.E. Project | Nepal | 750 | 2029 |
| 16 | Seti River-6 (SR-6) Project | Nepal | 450 | 2029 |
| 17 | Phukot Karnali H.E. Project | Nepal | 480 | 2029 |
| 18 | Teesta-IV H.E. Project | Sikkim | 520 | 2030 |
| 19 | Solar Power Project at Khavda-1 | Gujrat | 200 | 2026 |
| 20 | Rajasthan Solar Power Project | Rajasthan | 300 | 2026 |
| 21 | 1000MW CPSUs Scheme Solar Project, Andhra Pradesh | Andhra Pradesh | 100 | 2026 |
*Under JV through Chenab Valley Power Projects (P) Limited, in Kishtwar District of J&K.
Hydropower & Pump Storage (PSP) Projects Under Investigation
[edit]| Sl. No. | Projects | State | Total Capacity (MW) | Completion Schedule |
|---|---|---|---|---|
| 1 | Siang Upper Project | Arunachal Pradesh | 11000 | 2035 |
| 2 | Kengadi PSP | Maharashtra | 1550 | 2035 |
| 3 | Savitri PSP | Maharashtra | 2250 | 2035 |
| 4 | Kalu PSP | Maharashtra | 1150 | 2034 |
| 5 | Jalond PSP | Maharashtra | 2400 | 2035 |
| 6 | Masinta PSP | Odisha | 1000 | 2035 |
| 7 | Yaganti PSP* | Andhra Pradesh | 1000 | 2035 |
| 8 | Rajupalem PSP* | Andhra Pradesh | 800 | 2034 |
*Under Joint Venture with Andhra Pradesh Power Generation Corp. Ltd (APGENCO)
Solar, Wind & Hydrogen Power Projects
[edit]| Sl.No. | Project | State | Total Capacity (MW) | Completion Schedule |
|---|---|---|---|---|
| 1 | Mirzapur Jagir Solar PV Park* | Uttar Pradesh | 100 | 2027 |
| 2 | Madhogarh Solar Power Project* | Uttar Pradesh | 600 | 2028 |
| 3 | Jalaun Solar Park Project* | Uttar Pradesh | 1200 | 2028 |
| 4 | Floating Solar Project Rengali | Odisha | 300 | 2026 |
| 5 | Hydrogen Mobility Station Kargil | Ladakh | 500KW | 2026 |
- Under Joint Venture with Uttar Pradesh Government BUNDELKHAND SAUR URJA LIMITED (BSUL)
Scheduling and Dispatch
[edit]The Scheduling and dispatch of all the generating stations owned by National Hydro Power Corporation is done by the respective Regional Load Dispatch Centres which are the apex body to ensure the integrated operation of the power system grid in the respective region. All these load dispatch centres come under Power System Operation Corporation Limited (POSOCO).
Awards and recognition
[edit]- Winner at Dun & Bradstreet-Everest Infra Awards 2015 in the Power Generation (Renewable Energy) category recognising its performance under the category.
- 'Gold Shield' for the year 2013–14 in the category of 'Early Completion of Hydro Power Projects' for Unit −3 (15 MW) of its Nimoo Bazgo Hydro Electric Project, Jammu & Kashmir, at a function held in Vigyan Bhawan, New Delhi on 3 June 2015.
- "CBIP Award for Best Performing Utility in Power Sector" at CBIP Awards on CBIP Day on 1 January 2015 in New Delhi.
- "Most Valuable PSU under Mini Ratna Category" at the India Today Group PSU Awards on 21 August 2014 in New Delhi.
- "Most Eco-Friendly Award" and "Most Valuable Company Award" in the Mini Ratna Category at the second India Today Group PSU Awards held on 14 December 2015.
- "Best Performing Utility in Hydro Power Sector" at the CBIP Award held at New Delhi on 29 December 2015.
- "Award for excellence in cost management" held at New Delhi on 28 May 2016. The award – instituted by The Institute of Cost Accountants of India – recognises NHPC's efforts in implementing effective cost management practices.
- "Best Hydropower Enterprise Award" by Hydropower Forum of India under the aegis of Enertia Foundation and Renewable Energy Promotion Association at the 2nd India Hydro Awards 2016 held at New Delhi on 10 June 2016.
- "Best Mini Ratna" at Dun & Bradstreet PSU Awards 2016.
- Awarded Second Prize by Ministry of Home Affairs, Govt. of India for the year 2015–16 under "Rajbhasha Kirti Puruskar" scheme for commendable work in the implementation of Rajbhasha amongst Public Sector Undertakings located in Region 'A'.
- NHPC has been conferred with CBIP Awards 2020 for “Outstanding performing utility in hydro power sector” on 19.02.2020.[6]
References
[edit]- ^ "NHPC Limited : Contact : NHPC Contact".
- ^ "NHPC commissions 50 MW wind power project in Rajasthan". Business Line. PTI. 1 November 2016. Retrieved 7 March 2018.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 11 February 2017. Retrieved 9 February 2017.
{{cite web}}: CS1 maint: archived copy as title (link) - ^ "Baira Siul". NHPC. Retrieved 7 March 2018.
- ^ "Panel call to resume Subansiri dam work". Archived from the original on 2 July 2016. Retrieved 22 July 2016.
- ^ "NHPC Limited : Investor Corner : Performance Highlights".
References to New Project
[edit]- Subansiri Upper Project Allotted to NHPC Ltd. PIB Link
- Kamala Hydroelectric Project Allotted to NHPC Ltd.
- Dulhasti Stage-II Project
- Uri-I Stage-II Project
- Sawalkote Hydroelectric Project
- Kirthai Stage-II Hydroelectric Project
- West Seti Hydroelectric Project
- Seti River-6 (SR-6) Hydroelectric Project
- Phukot Karnali Hydroelectric Project
- Siang Upper Hydroelectric Project NHPC Submitted Pre feasibility Report of Siang Upper Project [1] [2] [3]
- NHPC completes takeover of Rangit Stage-IV HE Project NHPC signs Definitive Agreement for implementation of ... NHPC completes takeover of Rangit Stage-IV HE Project
- NHPC to complete Teesta VI hydropower project in Sikkim [1] Patel-Engineering-bags-rs-1251-cr-order-for-500-mw-Teesta-VI [1] NHPC Board Approve merger of Lanco Teesta
- NHPC-Signs-MOU-with-maharashtra-govt-for-7350-mw-Pumped-Storage-Projects [1] [2] [3]
- NHPC signs MoU with GRIDCO Odisha, for developing 2 GW Pumped Storage Projects and 1 GW Solar Energy Projects in Odisha.[1] [2] [3] [4]
- NHPC and APGENCO signs JVA to set up 1.8 GW PSP [1] [2] [3] [4] [5]
- Construction starts on 2.88GW Dibang hydropower project [1] [2] [3] [4] BHEL wins contract for 2.8GW Dibang Multipurpose
- NHPC to build India’s 520-MW Teesta 4 hydro Project [1]
- Hydro-mechanical contract tendered for Teesta VI in India [1] [2] [3]
- NHPC Mirzapur Jagir Solar PV Park, India [1] [2]
- NHPC Invites Bids for 600 MW Solar Park in Madhogarh, Uttar Pradesh [1] [2]
- NHPC Invites Bids For EPC Contract To Develop 1,200 MW Solar Power Park [1] [2] [3]
- NHPC Rengali Reservoir Floating Solar PV Park, India [1] [2] [3]
- Omkareshwar Floating Solar Power Plant (FSPV) [1] [2] [3]
- Sanchi Solar Power Project [1] [2] [3] [4] [5]
- NHPC signs MoU to develop pilot green hydrogen projects [1] [2] [3] [4] [5]
- NHPC to develop 200 MW Solar Power Project at Khavda,[1] [2] [3] [4] [5]
- Rajasthan Solar Power Project-NHPC Connects 300MW Solar Power Project [1] [2] [3] [4]
- NHPC Awards Contracts For CPSU 1000 MW Solar Projects [1] [2] [3] [4] [5] [6]
- Kalpi Saur Urja Power Project Commissioned [1] [2] [3] [4] [5]
External links
[edit]Overview
Company Profile
NHPC Limited is a Navratna public sector undertaking under the Ministry of Power, Government of India, incorporated on November 7, 1975, as National Hydroelectric Power Corporation Private Limited and later converted to a public limited company with CIN L40101HR1975GOI032564.[7] Its registered office is located at NHPC Office Complex, Sector-33, Faridabad, Haryana 121003.[8] The company's founding purpose centers on planning, promoting, and organizing the integrated development of hydroelectric power resources to bolster India's power infrastructure.[7] NHPC's mandate encompasses the full lifecycle of hydropower projects, from conceptualization and construction to operation and maintenance, thereby contributing to national energy security and sustainable economic development.[7] As India's premier hydropower organization, NHPC has expanded beyond traditional hydroelectric focus to include solar and wind energy initiatives, aligning with the escalating demand for diversified renewable sources in the country's energy mix.[7] This evolution supports broader goals of clean energy adoption while maintaining hydropower as its core competency.[9]Core Operations and Capacity
NHPC's core operations focus on the generation of hydroelectric power, leveraging river systems primarily in the Himalayan region and northern India for run-of-the-river and storage-based projects. As of October 2025, the company's total installed capacity stands at 8,332.9 MW, encompassing 23 operational hydroelectric stations that form the backbone of its portfolio.[10] This includes 7,771.2 MW from wholly owned hydro assets and approximately 1,681.7 MW from joint ventures, enabling consistent output suited to variable water flows and seasonal monsoons.[11] The stations are interconnected with India's regional grids—northern, western, northeastern, and southern—facilitating real-time scheduling and dispatch coordinated by Regional Load Despatch Centres (RLDCs) under the Power System Operation Corporation (POSOCO). This integration allows NHPC to supply dispatchable baseload and peaking power, with hydroelectric generation offering high efficiency (up to 90% plant load factor in optimal conditions) and rapid ramp-up capabilities compared to thermal alternatives.[10] Annual generation averages exceed 30 billion units, prioritizing grid stability through firm power commitments under long-term power purchase agreements with state utilities.[12] While NHPC has initiated diversification into non-hydro renewables, solar and wind capacities remain marginal at around 369 MW as of mid-2025, underscoring hydroelectricity's superior reliability as a controllable resource amid the intermittency challenges of solar and wind.[12] [1] Hydro operations emphasize water resource management, including reservoir regulation for flood control and irrigation benefits, with environmental monitoring to mitigate ecological impacts in sensitive terrains.[1]History
Formation and Initial Development (1975–1990)
The National Hydroelectric Power Corporation (NHPC) was incorporated on November 7, 1975, initially as the National Hydro Electric Power Corporation Private Limited, a government-owned entity under the Ministry of Power aimed at systematically developing India's vast hydroelectric resources to support national energy needs.[13] This formation aligned with India's broader energy strategy following the 1973 oil crisis, which exposed vulnerabilities in fossil fuel imports and prompted a shift toward indigenous renewable sources like hydropower for long-term self-reliance.[14] Early operations focused on surveying, planning, and executing projects in the Himalayan regions, where abundant water resources offered high potential but demanded rigorous site-specific assessments.[15] NHPC's initial development emphasized takeover and completion of inherited projects, including the Loktak Downstream Hydroelectric Project (105 MW) in Manipur, which involved integrating existing infrastructure with enhanced engineering for reliable output.[15] The corporation prioritized foundational hydroelectric stations, addressing the era's limited grid connectivity and technological constraints through phased construction of dams, reservoirs, and powerhouses. By the late 1970s, annual reports highlighted progress on multiple fronts, with investments in geological mapping and material procurement to mitigate risks inherent in rugged terrains.[16] A pivotal milestone came with the commissioning of the Baira Siul Hydroelectric Project (180 MW) in Himachal Pradesh on April 23, 1982, marking NHPC's first fully operational station and demonstrating proficiency in overcoming Himalayan challenges such as unstable rock formations and high-altitude logistics for tunnel boring, penstock installation, and turbine deployment.[17] This project, spanning a 22 km headrace tunnel and a 180-meter-high dam, required innovative adaptations to seismic activity and water flow variability, setting precedents for subsequent developments while contributing initial megawatts to the northern grid.[18] Through these efforts, NHPC established core competencies in run-of-the-river schemes, laying the groundwork for scaled hydro infrastructure amid India's push for decentralized power generation.[19]Expansion and Key Milestones (1990–2010)
During the 1990s, NHPC expanded its portfolio with the commissioning of the 94.2 MW Tanakpur run-of-the-river hydroelectric project on the Sharda River in Uttarakhand, operationalized in 1992–93 as the corporation's initial major development in the region.[20] This was followed by the 480 MW Uri-I project on the Jhelum River in Jammu and Kashmir, fully commissioned in 1997, which featured four 120 MW Francis turbine units and contributed significantly to northern grid stability through peaking capacity.[21] The 60 MW Rangit project in Sikkim, a run-of-the-river scheme with pondage on the Rangit River, entered commercial operation in 2000, enhancing power supply to eastern states and demonstrating NHPC's capability in challenging Himalayan terrains.[22] Into the 2000s, NHPC accelerated capacity additions with the 300 MW Chamera-II project in Himachal Pradesh, commissioned progressively from 2003 to 2004 across three 100 MW units, boosting cumulative installed capacity and supporting industrial load growth in the north.[23][24] The 280 MW Dhauliganga-I project in Uttarakhand followed in 2005, with all four 70 MW units synchronized by November, providing dispatchable hydro output that mitigated seasonal variability in fossil fuel-dependent generation.[24] Culminating the decade's efforts, the 390 MW Dulhasti project in Jammu and Kashmir achieved full commissioning in 2007, featuring three 130 MW Pelton turbine units operationalized sequentially from February to March, adding robust high-head power to the national grid amid regional security challenges.[25] These milestones collectively augmented NHPC's installed capacity by over 1,600 MW during the period, shifting contributions toward India's evolving power mix where hydroelectricity's inherent flexibility—enabling rapid ramp-up for peak demand—outweighed intermittency issues in non-hydro renewables and complemented coal's baseload reliability, thereby reducing vulnerability to fuel import fluctuations.[24] Concurrently, NHPC ventured into joint initiatives, such as deepening ties with state entities exemplified by NHDC Limited's Indira Sagar advancements, fostering shared risk in large-scale developments while prioritizing technical feasibility over expedited timelines.[17] By 2010, these expansions had elevated NHPC's role in national energy security, with hydroelectric dispatch aiding grid frequency control and averting shortages during monsoonal surpluses versus dry-season deficits.Modern Era and Diversification (2010–Present)
In the period following 2010, NHPC prioritized the advancement of major hydroelectric initiatives to bolster India's energy security, exemplified by the Subansiri Lower Hydroelectric Project (2,000 MW), where construction commenced in 2005 but encountered repeated delays due to geological challenges, local opposition, and regulatory hurdles.[26] The project's first unit (250 MW) achieved wet commissioning on October 24, 2025, marking a pivotal step toward operationalization amid national commitments to low-carbon baseload power generation that supports grid stability, unlike intermittent sources requiring extensive backup infrastructure.[27] This focus aligned with empirical evidence favoring hydroelectricity's dispatchable capacity for meeting peak demand and integrating renewables, as hydro reservoirs enable flexible output to compensate for solar and wind variability without relying solely on costly battery systems.[1] NHPC initiated diversification into non-hydro renewables to adapt to policy emphases on solar and wind expansion, commissioning a 300 MW solar photovoltaic project in Bikaner, Rajasthan, on October 16, 2025, as part of broader efforts to tap government incentives for hybrid energy models.[28] Ventures into green hydrogen included pilot-scale production facilities, such as a 25 kWe unit in Leh, aimed at leveraging excess renewable output for electrolysis, though these remain experimental and secondary to hydro's proven reliability in providing firm power.[1] Such pilots reflect responsiveness to India's green hydrogen mission, yet first-principles analysis underscores hydro's causal advantages in energy density and storage via reservoirs, mitigating the intermittency risks inherent in solar and wind that necessitate overbuild and curtailment to maintain system inertia.[29] Facing 2020s regulatory reforms promoting private participation in power distribution and renewables implementation, NHPC, as a Navratna public sector undertaking, preserved its operational autonomy through strategic partnerships rather than full divestment, including memoranda of understanding with entities like Indian Oil Corporation for pumped storage and a power purchase agreement with ACME Solar for 250 MW firm dispatchable renewable energy.[30][31] These collaborations enabled NHPC to leverage private sector efficiencies in execution while retaining public oversight, countering broader sector privatization pressures that have targeted discoms and retail markets without directly impairing hydro-focused PSUs' mandate for national infrastructure development.[32] This approach sustained NHPC's role in delivering cost-effective, large-scale hydro capacity, empirically demonstrated by lower levelized costs for established hydro plants compared to unsubsidized intermittent alternatives dependent on policy-driven tariffs.[33]Corporate Structure
Ownership and Governance
NHPC Limited operates as a Navratna public sector undertaking under the administrative control of the Ministry of Power, Government of India, which holds a majority promoter stake of 67.40% alongside state governments, with the remaining 32.60% comprising public shareholding.[34] This structure ensures direct governmental oversight while incorporating market accountability through its listing on the National Stock Exchange (NSE) and Bombay Stock Exchange (BSE) effective September 1, 2009.[1] The board of directors includes government nominees such as Indian Administrative Service (IAS) officers, executive directors with domain expertise in finance, projects, and technical operations, and independent directors to enhance decision-making diversity. Shri Bhupender Gupta serves as Chairman and Managing Director, providing strategic leadership.[35] Recent executive transitions underscore ongoing efforts to maintain operational continuity; on October 17, 2025, Shri Mahesh Kumar Sharma assumed charge as Director (Finance) for a five-year term, bringing prior experience in financial management within public sector entities.[36] Governance mechanisms prioritize cost efficiency, return on investment, and project execution integrity, with accountability enforced through ministerial reviews and performance audits. This is reflected in NHPC's sustained high plant availability factors, such as 88.75% achieved across its hydroelectric portfolio in prior fiscal years, outperforming typical public sector benchmarks and countering broader critiques of inefficiency in state-owned enterprises by demonstrating reliable asset utilization amid variable hydrological conditions.[29]Subsidiaries and Joint Ventures
NHPC Limited operates through a network of subsidiaries and joint ventures to facilitate project development, mitigate risks, and leverage regional partnerships, particularly in challenging terrains like Jammu & Kashmir and the Northeast. These entities enable specialized execution of hydroelectric, pumped storage, and renewable projects while sharing equity with state governments or partners, ensuring alignment with local regulatory and developmental needs. As of fiscal year 2023-24, NHPC holds controlling stakes in several such companies, contributing to an aggregated capacity under development exceeding 7,000 MW across these affiliates.[37][38] Key subsidiaries include NHDC Limited, where NHPC maintains a 51.08% stake alongside the Government of Madhya Pradesh, focusing on Narmada River basin projects such as Indirasagar and Omkareshwar to diversify NHPC's portfolio beyond core operations.[38][39] Chenab Valley Power Projects Private Limited, a fully controlled subsidiary, handles multiple hydroelectric initiatives in the Chenab basin, enhancing NHPC's presence in northern India through integrated project management.[38][40] Ratle Hydroelectric Power Corporation Limited (RHPC), with NHPC's 57.41% ownership and 49% from Jammu & Kashmir State Power Development Corporation (JKSPDC), targets the 850 MW Ratle project, exemplifying risk-sharing in geopolitically sensitive areas.[38][41] Joint ventures further support region-specific strategies, such as Bundelkhand Saur Urja Limited for solar energy in Uttar Pradesh, promoting diversification into renewables via state collaborations. Loktak Downstream Hydroelectric Corporation Limited aids Northeast hydro developments, while NHPC Renewable Energy Limited, a wholly owned arm, spearheads emerging solar and wind initiatives. These structures have empirically bolstered NHPC's revenue streams, with subsidiaries like NHDC adding over 1,500 MW to attributable capacity through efficient equity partnerships.[39][15]| Entity | Ownership by NHPC | Strategic Role |
|---|---|---|
| NHDC Limited | 51.08% | Narmada basin hydro projects; risk-sharing with Madhya Pradesh government.[38] |
| Chenab Valley Power Projects Pvt Ltd | 100% (subsidiary) | Chenab basin developments in Jammu & Kashmir.[38] |
| Ratle Hydroelectric Power Corporation Ltd | 57.41% | 850 MW Ratle project execution via JV with JKSPDC.[38][41] |
| Bundelkhand Saur Urja Limited | Majority (JV) | Solar projects in Bundelkhand region.[15] |
Power Generation Assets
Operational Hydroelectric Stations
NHPC Limited operates 21 hydroelectric power stations in India with a combined installed capacity of 7,771 MW, primarily comprising run-of-river schemes that harness river flows without extensive storage reservoirs, supplemented by a few storage-type projects for regulated output.[10] These facilities generate electricity at low operational costs due to the absence of fuel expenses, with mature hydro plants achieving generation costs as low as 27 paise per kWh after decades of operation, contrasting with thermal plants' fuel-dependent costs typically exceeding ₹3-5 per kWh.[42] The stations demonstrated engineering resilience, recording a plant availability factor (PAF) of 88.19% in FY 2021-22, the highest ever at the time, enabling reliable peaking power supply.[43] Key operational stations include:| Project Name | State/UT | Installed Capacity (MW) | Design Energy (MU) | Commissioning Year | Type |
|---|---|---|---|---|---|
| Salal | Jammu & Kashmir | 690 | 3,082 | 1987 | Storage-influenced |
| Chamera-I | Himachal Pradesh | 540 | 1,665 | 1994 | Run-of-river with pondage |
| Uri-I | Jammu & Kashmir | 480 | 2,587 | 1997 | Run-of-river |
| Teesta-V | Sikkim | 510 | 2,573 | 2008 | Run-of-river with diurnal storage |
| Parbati-III | Himachal Pradesh | 520 | 1,963 | 2014 | Run-of-river |
| Dulhasti | Jammu & Kashmir | 390 | 1,907 | 2007 | Run-of-river |
Projects Under Construction
NHPC is advancing multiple hydroelectric projects under construction, with a focus on Himalayan run-of-the-river schemes that leverage advanced excavation techniques to address geological instabilities such as shear zones and high overburden pressures. These efforts have enabled progress on tunnels and dams through the deployment of tunnel boring machines (TBMs), which provide precise, mechanized boring over conventional drill-and-blast methods, reducing downtime and enhancing safety in seismically active regions.[1][45] The flagship 2,000 MW Subansiri Lower Hydroelectric Project, located on the Subansiri River straddling Arunachal Pradesh and Assam, comprises eight 250 MW Francis turbine units with a design energy of 7,418 GWh annually. Construction, initiated in 2005 but stalled from 2011 to 2019 due to technical and stakeholder halts, resumed in October 2019, culminating in the successful lowering of a 395-tonne generator stator for Unit 5 on August 8, 2025, followed by wet commissioning of Unit 1 via mechanical run on October 24, 2025.[46][47] Subsequent units are slated for phased commissioning starting late 2025, bolstering grid stability through peaking power capabilities.[48] In Jammu and Kashmir, the 624 MW Kiru Hydroelectric Project on the Chenab River, executed via joint venture, features four 156 MW units and a 41.5 million cubic meter reservoir. Progress includes the completion of 1 million cubic meters of dam concreting by October 2025, with the 12.94 km headrace tunnel excavation nearing completion ahead of the targeted 2026 full operations.[49][50] The 1,000 MW Pakal Dul Project, also a joint venture on the Marusudar River in Jammu and Kashmir, employs TBMs for its 14.7 km headrace tunnel with an 8.3-meter excavated diameter, achieving record advance rates to navigate fractured quartzite and mitigate risks from variable rock strengths.[51][52] Other active hydro builds, such as the 500 MW Teesta-VI in Sikkim and 850 MW Ratle in Jammu and Kashmir, incorporate similar mechanized tunneling to sustain momentum toward aggregate under-construction hydro capacity contributions exceeding 7,000 MW.[53]| Project | Capacity (MW) | Location | Key Milestone (2025) |
|---|---|---|---|
| Subansiri Lower | 2,000 | Arunachal Pradesh | Wet commissioning Unit 1 (Oct) |
| Kiru | 624 | Jammu & Kashmir | 1M m³ dam concreting (Oct) |
| Pakal Dul | 1,000 | Jammu & Kashmir | TBM tunnel advances |
| Teesta-VI | 500 | Sikkim | Ongoing tunnel and dam works |
| Ratle | 850 | Jammu & Kashmir | Diversion tunnel progress |
Renewable and Emerging Projects
NHPC Limited has initiated several non-hydroelectric renewable energy projects, primarily in solar power, though these remain limited in scale compared to its core hydroelectric portfolio of over 7,000 MW installed capacity. The company's Bundelkhand Saur Urja Limited joint venture with the Uttar Pradesh New and Renewable Energy Development Agency is developing a 1,200 MW solar park in Jalaun district, Uttar Pradesh, under the Union Ministry of New and Renewable Energy's Park scheme, with an estimated investment of ₹7,969 crore; tenders for 1.2 GW of solar plants (in 300 MW modules) were issued in July 2025, alongside bids for civil works at a 600 MW segment costing ₹40.27 crore.[54][55][56] A smaller operational component, the 65 MW Kalpi Solar Power Project in the same region, generates approximately 148 million units annually.[57] In solar procurement, the Maharashtra Electricity Regulatory Commission approved the Maharashtra State Electricity Distribution Company's long-term purchase of 1,475 MW from NHPC at a tariff of ₹2.60 per kWh for 25 years in September 2025, supporting state demand while highlighting NHPC's entry into utility-scale solar supply.[58] Additionally, NHPC has pursued hybrid projects, including a 250 MW solar-wind hybrid with Juniper Green Energy under a July 2025 power purchase agreement and a 300 MW solar-wind hybrid PPA with JSW Energy for Andhra Pradesh sites.[59][60] These efforts are channeled through the wholly owned subsidiary NHPC Renewable Energy Limited, established for solar, wind, and small hydro development.[61] Emerging initiatives include pilot green hydrogen projects for mobility. NHPC is establishing stations in Kargil, Ladakh, powered by 500 kWp solar with hydrogen generation for two fuel-cell buses, awarded to Gensol Engineering; and in Chamba, Himachal Pradesh, targeting 40 kg daily production and storage for bus operations.[62][63][64] These pilots test scalability amid India's green hydrogen push, but remain experimental with capacities under 25 kWe equivalent.[1] Relative to hydroelectric projects, these renewables exhibit lower practical viability due to intermittency; Indian hydroelectric capacity factors average 38-50%, enabling dispatchable output, whereas solar typically achieves 15-25% in regional conditions, necessitating storage or backups for reliability. NHPC's non-hydro pipeline, exceeding 27,000 MW including 8,193 MW solar, contrasts with current operational scales below 500 MW outside hydro, underscoring hydro's dominance for baseload stability.[65][66]Pipeline and Investigation Projects
NHPC's pipeline and investigation projects focus on the pre-construction evaluation of hydroelectric and pumped storage potential, involving detailed surveys for hydrological data, geological mapping, and seismic risk assessments to ensure project viability and safety. These stages prioritize sites with high hydraulic heads, which enable greater power density and higher returns on investment through efficient energy conversion and minimal land use per megawatt. Feasibility reports incorporate economic modeling of power tariffs, construction costs, and long-term revenue from dispatchable generation, particularly for pumped storage to support grid stability amid rising renewable integration.[53][67] A key example is the Siang Upper Multipurpose Project in Arunachal Pradesh, proposed at 11,200 MW, where investigations emphasize the river's steep gradients for optimized hydropower output alongside flood moderation storage of 14 billion cubic meters; pre-feasibility studies, initiated with local consultations in 2025, assess basin-wide hydrology and seismic stability to validate its strategic economic value.[68][69] The following table summarizes select projects under survey and investigation, aggregating over 10,000 MW across domestic and international sites:| Project Name | Location | Capacity (MW) | Type |
|---|---|---|---|
| Savitri PSP | Maharashtra | 2,400 | Pumped Storage |
| KALU PSP | Maharashtra | 1,800 | Pumped Storage |
| Gadikota | Andhra Pradesh | 1,200 | Hydro/PSP |
| Yaganti | Andhra Pradesh | 1,000 | Hydro/PSP |
| Masinta PSP | Odisha | 1,000 | Pumped Storage |
| Garba Tawaghat | Uttarakhand | 630 | Hydro |
| Indirasagar-Omkareshwar PSP | Madhya Pradesh | 640 | Pumped Storage |
| West Seti | Nepal | 800 | Hydro |
Financial and Market Performance
Revenue Generation and Economic Impact
NHPC derives the majority of its revenue from the sale of electricity generated by its hydroelectric projects to state distribution companies and regional grids, particularly the Northern Grid. For the financial year 2024-25, income from energy sales amounted to ₹8,920 crore, underpinning a net profit of ₹3,084 crore.[1] This revenue stream benefits from long-term power purchase agreements and tariff mechanisms that ensure stable returns, with hydroelectric power's low operational costs—primarily maintenance and minimal fuel expenses—enhancing profitability per megawatt generated at ₹56 lakhs in FY25.[37] Specific projects underscore NHPC's revenue contributions, such as those in Jammu and Kashmir, where facilities like Dulhasti and Uri generated approximately ₹19,400 crore for the company over the 15 years ending in 2016 through power sales and related allocations.[70] Dulhasti alone recorded the highest profit before tax among NHPC stations at ₹773 crore in FY25, highlighting the profitability of established assets in challenging terrains.[37] In the fourth quarter of FY25, NHPC achieved a revenue surge of 24.4% to ₹2,347 crore, coupled with a 52% increase in profit after tax to ₹919 crore, despite elevated costs from project escalations and prior impairments; this performance validated hydroelectricity's cost-effectiveness amid record generation levels from operational plants.[71][72] Overall FY25 revenue grew 7% year-over-year to ₹8,994 crore, driven by higher generation and tariff adjustments, though full-year profit dipped 15% due to one-time expenses.[73] NHPC's revenue model extends economic benefits to India by supplying affordable baseload and peaking power, which lowers average grid tariffs through its negligible marginal generation costs relative to coal or gas-based alternatives. This supports national energy affordability, with NHPC's output displacing higher-cost thermal generation and thereby aiding foreign exchange conservation by curtailing fuel import dependencies in the power sector. Project development and operations further stimulate local economies in remote Himalayan regions via direct employment for thousands during construction—often exceeding 5,000 workers per major site—and ancillary jobs in supply chains, though precise multipliers vary by project scale.[37]Stock Performance and Valuation
NHPC Limited's shares traded at approximately ₹84.79 on the National Stock Exchange as of October 24, 2025, reflecting a year-to-date decline amid broader market pressures on public sector utilities.[74] The company's market capitalization stood at around ₹85,242 crore on the same date, down 8.84% over the preceding year, influenced by subdued sales growth of 0.73% annually over the past five years and a return on equity averaging 9.20% in the last three years.[75][76][77] Valuation metrics indicate a trailing price-to-earnings ratio of 27.9 to 32.67, positioning NHPC at a premium relative to historical PSU peers but below the broader Indian renewable energy sector average of 83.2x, reflecting its stable hydroelectric revenue streams backed by long-term power purchase agreements.[77][78][79] Dividend yield remains attractive at 2.20-2.25%, supported by a payout ratio of 71.41% and consistent distributions, such as the ₹1.91 per share annual dividend, outperforming volatile renewable peers during periods of stable hydrological conditions.[80][77][81]| Metric | Value (as of Oct 2025) |
|---|---|
| Market Cap | ₹85,242 Cr |
| P/E Ratio (Trailing) | 27.9-32.67 |
| Dividend Yield | 2.20-2.25% |
| ROE (3-Year Avg) | 9.20% |
| Debt-to-Equity | 1.0 |