View on WikipediaThe UNGG (Uranium Naturel Graphite Gaz) is an obsolete nuclear power reactor design developed in France. It was graphite moderated, cooled by carbon dioxide, and fueled with natural uranium metal. The first generation of French nuclear power stations were UNGGs, as was Vandellos unit 1 in Spain. Of the ten units built, all were shut down by the end of 1994, most for economic reasons due to staffing costs. A UNGG reactor is often simply referred to as an GCR in English documents.
Design
[edit]

The UNGG is along with the Magnox the main type of gas cooled reactor (GCR). It was developed independently of and parallel to the British Magnox design, both to meet similar requirements of simultaneous production of electric power and plutonium. Although the French and the British models both used natural uranium and the same moderator and coolant, there were differences in design. In France, each next built reactor had a different design. The first UNGG reactors at Marcoule used horizontal fuel channels and a concrete containment structure.[1] Chinon A1 used vertical fuel channels and a steel pressure-vessel.
The fuel cladding material was a magnesium-zirconium alloy in the UNGG, as opposed to magnesium-aluminium in Magnox. As both claddings react with water, they can be stored in a spent fuel pool only for short periods of time, making short-term reprocessing of fuel essential, which requires heavily shielded facilities.
The programme was a succession of units, with changes to the design increasing power output. In the experimental phase they were built by the Commissariat à l'Énergie Atomique (CEA), and later by Électricité de France (EDF).[1] The largest UNGG reactor built was Bugey 1 with a net electrical output of 540 MW.
Units
[edit]- G1, G2 and G3 at Marcoule. G1 was the first UNGG; a prototype for military use. G1 had a net output of 2 MWe and became critical in 1956.[2]
- Chinon Nuclear Power Plant A1, A2, and A3 in Indre-et-Loire (originally named EDF1, EDF2, EDF3).
- Saint-Laurent Nuclear Power Plant A1 and A2 in Loir-et-Cher, operated from 1969 and 1971 to April 1990 and June 1992.
- Reactor 1 at Bugey Nuclear Power Plant in Ain, the last UNGG built in France, first criticality 1972, closed in May 1994.
- Vandellòs Nuclear Power Plant Unit 1 in Spain, the only UNGG built outside France, closed in July 1990.
The earlier units, at Chinon and Marcoule, had heat exchangers outside the main pressure vessel; Later units (Saint-Laurent, Bugey and Vandellos) moved these heat exchangers to inside the pressure vessel.
See also
[edit]References
[edit]- ^ a b Ten Years of Nuclear Power. IAEA bulletin Vol. 6, no. 3, 1964. Via
- ^ Marcoule G1. INSC
- French activities on gas cooled reactors, D Bastien, IAEA-TECDOC—899, pp:51-53, 30 Oct - 2 Nov 1995
- Twenty-nine years of French experience in operating gas-cooled reactors, D Bastien, IWGGCR—19, pp:113-119 21-23 Sep 1988 Better copy archived
UNGG reactor
View on GrokipediaHistory
Development Origins
Following World War II, France pursued an ambitious nuclear program to achieve energy independence and develop military capabilities, driven by the need to rebuild national infrastructure and secure strategic autonomy amid Cold War tensions. The Commissariat à l'énergie atomique (CEA) was established on October 18, 1945, by General Charles de Gaulle to oversee research in atomic energy for both civilian and defense applications, marking France as the first nation to create a dedicated civil organization for nuclear development post-war.[4][5] This initiative was motivated by limited access to foreign technologies, such as uranium enrichment, and the desire to utilize domestic natural uranium resources for plutonium production, essential for potential nuclear weapons.[6] In the early 1950s, CEA researchers initiated studies on graphite-moderated, gas-cooled reactor designs fueled by natural uranium, aiming to bypass reliance on imported enriched uranium or scarce heavy water. These efforts prioritized technological sovereignty, with natural uranium selected for its abundance in France, graphite for its effective neutron moderation, and carbon dioxide gas for efficient cooling without chemical reactivity issues. The dual-purpose design supported both electricity generation and plutonium extraction for military needs, aligning with national security goals.[1] A pivotal milestone occurred in 1952 when French authorities decided to pursue the UNGG (Uranium Naturel Graphite Gaz) concept over water-cooled alternatives, formalizing the graphite-gas path based on resource availability and preliminary feasibility assessments. Initial experimental tests followed in 1954-1955 at CEA laboratories, validating criticality and operational parameters for the design. This development paralleled but proceeded independently from Britain's Magnox reactors, with France later emphasizing vertical fuel channels in iterations to enhance power density and maintenance.[1]Construction Timeline
The development of the UNGG reactor progressed from experimental prototypes in the mid-1950s to commercial-scale units through the 1970s, with a total of ten reactors built across France and Spain. The initial phase focused on prototypes at the Marcoule site managed by the Commissariat à l'énergie atomique (CEA), emphasizing plutonium production and basic power generation capabilities using natural uranium fuel in a graphite-moderated, gas-cooled design.[7] Construction of the first UNGG prototype, Marcoule G1, began in 1955 and achieved first criticality in January 1956, producing approximately 5 MWe for testing purposes, including plutonium production; it was shut down in 1968.[8][7] This was followed by the early power-producing units at the same site: Marcoule G2, with construction starting in March 1955 and reaching criticality in July 1958 at around 39 MWe capacity before operating until 1980;[9][10] and Marcoule G3, initiated in March 1956, critical in June 1959 with about 40 MWe output, and running until 1984.[11][8] These Marcoule reactors featured horizontal fuel channels and served as proofs-of-concept for scaling up the technology.[12] The transition to commercial units occurred at the Chinon site, where designs evolved to incorporate vertical fuel channels for improved efficiency and maintenance. Chinon A1 construction started in February 1957, achieving criticality in September 1962 and commercial operation in June 1963 at 70 MWe, before shutdown in 1973.[13] Chinon A2 followed, with building commencing in August 1959, criticality in August 1964, and operation from February 1965 to 1985 at 180 MWe.[14] Chinon A3 began construction in March 1961, went critical in March 1966, and operated from June 1966 to 1990 with 360 MWe capacity.[15] The peak of UNGG construction in the late 1960s and early 1970s saw larger units at additional French sites and one international export. Saint-Laurent A1 construction started in October 1963, reaching criticality in January 1969 and commercial operation in June 1969 at 390 MWe, operating until 1990.[16] Saint-Laurent A2 began in January 1966, achieved criticality in July 1971, and ran commercially from November 1971 to 1992 at 465 MWe.[17] Bugey 1 construction commenced in December 1965, with criticality in March 1972 and operation from July 1972 to 1994 at 540 MWe.[18] The sole international UNGG, Vandellos 1 in Spain, started construction in June 1968, went critical in February 1972, and operated from August 1972 until shutdown in 1989 following a turbine fire, at 480 MWe.[19]| Reactor | Construction Start | First Criticality | Commercial Operation Start | Shutdown | Net Power Output (MWe) |
|---|---|---|---|---|---|
| Marcoule G1 | 1955 | January 1956 | January 1956 | 1968 | 5 |
| Marcoule G2 | March 1955 | July 1958 | April 1959 | February 1980 | 39 |
| Marcoule G3 | March 1956 | June 1959 | April 1960 | June 1984 | 40 |
| Chinon A1 | February 1957 | September 1962 | June 1963 | April 1973 | 70 |
| Chinon A2 | August 1959 | August 1964 | February 1965 | June 1985 | 180 |
| Chinon A3 | March 1961 | March 1966 | June 1966 | June 1990 | 360 |
| Saint-Laurent A1 | October 1963 | January 1969 | June 1969 | April 1990 | 390 |
| Saint-Laurent A2 | January 1966 | July 1971 | November 1971 | May 1992 | 465 |
| Bugey 1 | December 1965 | March 1972 | July 1972 | May 1994 | 540 |
| Vandellos 1 | June 1968 | February 1972 | August 1972 | 1989 | 480 |